Each project in the letting is listed with descriptive information. Click on a project to obtain a tabulation of item bids
for each bidder. It includes the unit bid for each item as well as the total item bid. Also shown are the bidder totals and ranking
for each project.
| | |
| DBE GOAL FED |
| Lead Project: 005-05-0074 |
| Parish: TERREBONNE |
| Routes: LA 182 |
| Description: LA 182 (LA 311 - LA 24) |
Type Const:
cold planing asphaltic pavement, pavement patching, superpave asphaltic concrete
overlay, sawing and sealing joints and related work. |
| Low Bidder: BARRIERE CONSTRUCTION CO., LLC |
| Amount: $770,341.00 |
| Estimated Construction Cost: $1,010,448.33 |
| Federal Number: NH-5505(506) |
| | |
| DBE GOAL FED |
| Lead Project: 022-05-0050 |
| Parish: LASALLE |
| Routes: US 84 |
| Description: JCT LA 459 - LA 8 EAST |
Type Const:
grading, cold planing asphaltic concrete, superpave asphaltic concrete overlay,
asphaltic surface treatment, pavement patching and related work |
| Low Bidder: D & J CONSTRUCTION CO., INC. |
| Amount: $1,654,626.24 |
| Estimated Construction Cost: $2,761,045.41 |
| Federal Number: NH-5805(501) |
| | |
| DBE GOAL FED |
| Lead Project: 026-08-0025 |
| Parish: RICHLAND |
| Routes: US 425 |
| Description: JCT LA 856 - JCT LA 137 AND JCT LA 15 - JCT I-20 |
Type Const:
drain struct, cold planing acp, asphaltic surface trmt, ultra-thin hmac wearing
course system, superpave acp overlay and related work |
| Low Bidder: DIAMOND B CONSTRUCTION CO., L.L.C. |
| Amount: $2,370,525.00 |
| Estimated Construction Cost: $2,720,503.09 |
| Federal Number: NH-4204(502) |
| | |
| DBE GOAL FED |
| Lead Project: 033-03-0038 |
| Parish: AVOYELLES |
| Routes: LA 115 |
| Description: JUNCTION LA 107 - RAPIDES PARISH LINE |
Type Const:
grading, cement treated bc, lime tr, cold planing asphaltic concrete, asphaltic
surface treatment, pavement patching, superpave asphaltic concrete pavement, and related work. |
| Low Bidder: DIAMOND B CONSTRUCTION CO., L.L.C. |
| Amount: $1,982,133.20 |
| Estimated Construction Cost: $1,759,352.14 |
| Federal Number: STP-0504(512) |
| REBID | |
| |
| Lead Project: 059-01-0022 |
| Parish: ST TAMMANY |
| Routes: LA 21, LA 22, LA 1077 |
| Description: MADISONVILLE PEDESTRIAN PATHWAYS |
| Type Const:
grading, drainage structures, concrete sidewalks, and related work.
|
| Low Bidder: COBALT CONSTRUCTION INC. |
| Amount: $344,720.70 |
| Estimated Construction Cost: $435,115.00 |
| Federal Number: ENH-5203(517) |
| | |
| |
| Lead Project: 066-08-0012 |
| Parish: ST LANDRY |
| Routes: US 167, LA 749 |
| Description: JCT. US 167 - JCT. US 190 |
Type Const:
grading, drainage structures, class ii b/c, lime treatment, cold planing acp, superpave
acp, full depth concrete patch, concrete drives & walks, and related work. |
| Low Bidder: GILCHRIST CONSTRUCTION CO. LLC |
| Amount: $7,998,429.46 |
| Estimated Construction Cost: $7,200,170.65 |
| Federal Number: |
| | |
| DBE GOAL FED |
| Lead Project: 158-01-0020 |
| Parish: OUACHITA |
| Routes: LA 546 |
| Description: CHENIERE ROAD INTERCHANGE(BRIDGE WIDENING AND REDECKING) |
Type Const:
grading, cold planing asphaltic pvmt, pavement patching, superpave acp, bridge widening
and related work. |
| Low Bidder: JAMES CONSTRUCTION GROUP LLC |
| Amount: $2,566,855.15 |
| Estimated Construction Cost: $2,112,365.35 |
| Federal Number: BR-3700(502) |
| | |
| DBE GOAL FED |
| Lead Project: 232-01-0059 |
| Parish: ASSUMPTION |
| Routes: LA 70 |
| Description: LA 70 IN PIERRE PART |
Type Const:
grading, drainage structures, class ii base course, cold planing asphaltic concrete
pavement, superpave asphaltic concrete pavement and related work. |
| Low Bidder: PHYLWAY CONSTRUCTION LLC |
| Amount: $7,284,076.75 |
| Estimated Construction Cost: $7,816,142.88 |
| Federal Number: ENH-STP-0403(502) |
| | |
| DBE GOAL FED |
| Lead Project: 262-02-0023 |
| Parish: LIVINGSTON |
| Routes: LA 16 |
| Description: DENHAM SPRINGS - WATSON |
Type Const:
grading, drainage structures, class ii base course, superpave asphaltic pavement,
portland cement concrete pavement, patching of pccp and related work |
| Low Bidder: BARRIERE CONSTRUCTION CO., LLC. |
| Amount: $7,733,735.30 |
| Estimated Construction Cost: $9,251,150.92 |
| Federal Number: STP-63-01(007) |
| | |
| DBE GOAL FED |
| Lead Project: 264-02-0010 |
| Parish: ASCENSION |
| Routes: LA 74 |
| Description: IBERVILLE PARISH LINE - JCT. US 61 |
Type Const:
grading, drainage structures, cold planing asphaltic pavement, superpave asphaltic
concrete overlay, pavement patching and related work. |
| Low Bidder: BARRIERE CONSTRUCTION CO., LLC |
| Amount: $2,484,923.85 |
| Estimated Construction Cost: $2,695,027.62 |
| Federal Number: STP-0305(511) |
| | |
| DBE GOAL FED |
| Lead Project: 315-03-0007 |
| Parish: UNION |
| Routes: LA 143 |
| Description: OUACHITA PARISH LINE - JCT. LA 2 |
Type Const:
grading, drainage structures, in-place cement treated bc, cold planing asph pvmt,
superpave asph conc ovly and related work. |
| Low Bidder: D & J CONSTRUCTION CO., INC. |
| Amount: $2,894,986.26 |
| Estimated Construction Cost: $3,638,412.01 |
| Federal Number: STP-5604(501) |
| | |
| DBE GOAL FED |
| Lead Project: 423-01-0025 |
| Parish: JEFFERSON |
| Routes: LA 3046, US 90 |
| Description: CAUSEWAY BOULEVARD HOOKRAMP BRIDGE REHABILITATION |
Type Const:
bridge rehabilitation, cold planing asphaltic concrete pavement, superpave asphaltic
concrete pavement, traffic signalization, and related work. |
| Low Bidder: BOH BROS. CONSTRUCTION CO., LLC. |
| Amount: $4,147,981.85 |
| Estimated Construction Cost: $2,920,117.60 |
| Federal Number: BR-2600(503) |
| READV | |
| |
| Lead Project: 450-92-0044 |
| Parish: E BATON ROUGE |
| Routes: I-110 |
| Description: I-10 - S. END OF ELEVATED ROADWAY |
Type Const:
superpave acp, cleaning and resealing joints, cleaning and sealing random cracks,
full depth patching, sawing and sealing joints in acp and related work. |
| Low Bidder: KNISH CORPORATION |
| Amount: $1,779,059.00 |
| Estimated Construction Cost: $1,390,123.75 |
| Federal Number: IM-1706(516) |
| REBID | |
| DBE GOAL FED |
| Lead Project: 455-01-0049 |
| Parish: LAFAYETTE |
| Routes: I-49 |
| Description: I-10 - ST. LANDRY PARISH LINE |
Type Const:
grading, drainage struct., portland cement concrete pavement patching, cold planing
asphaltic concrete, asphaltic surface trmt., superpave asphaltic concrete overlay, & related work. |
| Low Bidder: GILCHRIST CONSTRUCTION CO. LLC |
| Amount: $7,261,604.39 |
| Estimated Construction Cost: $5,573,413.99 |
| Federal Number: IM-2805(500) |
| | |
| DBE GOAL FED |
| Lead Project: 713-62-0005 |
| Parish: W CARROLL |
| Routes: |
| Description: RYE ROAD BRIDGE OVER LYON MILL BAYOU |
Type Const:
clearing and grubbing, grading, aggregate surfacing, concrete slab span bridge,
and related work. |
| Low Bidder: BEN ALLEN, INC. |
| Amount: $346,144.00 |
| Estimated Construction Cost: $427,329.50 |
| Federal Number: BRO-6202(503) |
| | |
| |
| Lead Project: 861-08-0017 |
| Parish: W BATON ROUGE |
| Routes: LA 989-1 |
| Description: LA 989-2 - END OF CONTROL |
Type Const:
grading, drainage structures, cold planing asphaltic concrete, superpave asphaltic
concrete overlay, cement treated base course, pavement patching and related work. |
| Low Bidder: F.G. SULLIVAN, JR. CONTRACTOR LLC |
| Amount: $2,166,710.54 |
| Estimated Construction Cost: $2,342,617.88 |
| Federal Number: |