Letting of 7/25/2007 LA DOTD Headquarters


Each project in the letting is listed with descriptive information. Click on a project to obtain a tabulation of item bids for each bidder. It includes the unit bid for each item as well as the total item bid. Also shown are the bidder totals and ranking for each project.

DBE GOAL FED
Lead Project: 005-05-0074
Parish: TERREBONNE
Routes: LA 182
Description: LA 182 (LA 311 - LA 24)
Type Const: cold planing asphaltic pavement, pavement patching, superpave asphaltic concrete
overlay, sawing and sealing joints and related work.
Low Bidder: BARRIERE CONSTRUCTION CO., LLC
Amount: $770,341.00
Estimated Construction Cost: $1,010,448.33
Federal Number: NH-5505(506)

Lead Project: 010-01-0023
Parish: NATCHITOCHES
Routes: US 71
Description: US 71 MINOR OVERLAY (CM)
Type Const: pavement patching, cold planing asphaltic concrete, asphaltic concrete wearing course
Low Bidder: MADDEN CONTRACTING CO., INC.
Amount: $447,660.60
Estimated Construction Cost: $447,814.11
Federal Number:

DBE GOAL FED
Lead Project: 022-05-0050
Parish: LASALLE
Routes: US 84
Description: JCT LA 459 - LA 8 EAST
Type Const: grading, cold planing asphaltic concrete, superpave asphaltic concrete overlay,
asphaltic surface treatment, pavement patching and related work
Low Bidder: D & J CONSTRUCTION CO., INC.
Amount: $1,654,626.24
Estimated Construction Cost: $2,761,045.41
Federal Number: NH-5805(501)

DBE GOAL FED
Lead Project: 026-08-0025
Parish: RICHLAND
Routes: US 425
Description: JCT LA 856 - JCT LA 137 AND JCT LA 15 - JCT I-20
Type Const: drain struct, cold planing acp, asphaltic surface trmt, ultra-thin hmac wearing
course system, superpave acp overlay and related work
Low Bidder: DIAMOND B CONSTRUCTION CO., L.L.C.
Amount: $2,370,525.00
Estimated Construction Cost: $2,720,503.09
Federal Number: NH-4204(502)

DBE GOAL FED
Lead Project: 033-03-0038
Parish: AVOYELLES
Routes: LA 115
Description: JUNCTION LA 107 - RAPIDES PARISH LINE
Type Const: grading, cement treated bc, lime tr, cold planing asphaltic concrete, asphaltic
surface treatment, pavement patching, superpave asphaltic concrete pavement, and related work.
Low Bidder: DIAMOND B CONSTRUCTION CO., L.L.C.
Amount: $1,982,133.20
Estimated Construction Cost: $1,759,352.14
Federal Number: STP-0504(512)

REBID
Lead Project: 059-01-0022
Parish: ST TAMMANY
Routes: LA 21, LA 22, LA 1077
Description: MADISONVILLE PEDESTRIAN PATHWAYS
Type Const: grading, drainage structures, concrete sidewalks, and related work.
Low Bidder: COBALT CONSTRUCTION INC.
Amount: $344,720.70
Estimated Construction Cost: $435,115.00
Federal Number: ENH-5203(517)

Lead Project: 066-08-0012
Parish: ST LANDRY
Routes: US 167, LA 749
Description: JCT. US 167 - JCT. US 190
Type Const: grading, drainage structures, class ii b/c, lime treatment, cold planing acp, superpave
acp, full depth concrete patch, concrete drives & walks, and related work.
Low Bidder: GILCHRIST CONSTRUCTION CO. LLC
Amount: $7,998,429.46
Estimated Construction Cost: $7,200,170.65
Federal Number:

REBID
Lead Project: 134-03-0014
Parish: RAPIDES
Routes: LA 8
Description: LA 8 SURFACE TREATMENT (CM)
Type Const: two application surface treatment
Low Bidder: T. L. WALLACE CONSTRUCTION, INC.
Amount: $211,864.80
Estimated Construction Cost: $264,640.19
Federal Number:

DBE GOAL FED
Lead Project: 158-01-0020
Parish: OUACHITA
Routes: LA 546
Description: CHENIERE ROAD INTERCHANGE(BRIDGE WIDENING AND REDECKING)
Type Const: grading, cold planing asphaltic pvmt, pavement patching, superpave acp, bridge widening
and related work.
Low Bidder: JAMES CONSTRUCTION GROUP LLC
Amount: $2,566,855.15
Estimated Construction Cost: $2,112,365.35
Federal Number: BR-3700(502)

DBE GOAL FED
Lead Project: 232-01-0059
Parish: ASSUMPTION
Routes: LA 70
Description: LA 70 IN PIERRE PART
Type Const: grading, drainage structures, class ii base course, cold planing asphaltic concrete
pavement, superpave asphaltic concrete pavement and related work.
Low Bidder: PHYLWAY CONSTRUCTION LLC
Amount: $7,284,076.75
Estimated Construction Cost: $7,816,142.88
Federal Number: ENH-STP-0403(502)

DBE GOAL FED
Lead Project: 262-02-0023
Parish: LIVINGSTON
Routes: LA 16
Description: DENHAM SPRINGS - WATSON
Type Const: grading, drainage structures, class ii base course, superpave asphaltic pavement,
portland cement concrete pavement, patching of pccp and related work
Low Bidder: BARRIERE CONSTRUCTION CO., LLC.
Amount: $7,733,735.30
Estimated Construction Cost: $9,251,150.92
Federal Number: STP-63-01(007)

DBE GOAL FED
Lead Project: 264-02-0010
Parish: ASCENSION
Routes: LA 74
Description: IBERVILLE PARISH LINE - JCT. US 61
Type Const: grading, drainage structures, cold planing asphaltic pavement, superpave asphaltic
concrete overlay, pavement patching and related work.
Low Bidder: BARRIERE CONSTRUCTION CO., LLC
Amount: $2,484,923.85
Estimated Construction Cost: $2,695,027.62
Federal Number: STP-0305(511)

Lead Project: 278-07-0003
Parish: TANGIPAHOA
Routes: LA 1054
Description: JCT. LA 38 - JCT. LA 1055
Type Const: cold planing asphaltic pavement, in-place cement treated base course, superpave
asphaltic concrete overlay and related work.
Low Bidder: BARRIERE CONSTRUCTION CO., LLC.
Amount: $1,396,229.20
Estimated Construction Cost: $1,845,690.44
Federal Number:

DBE GOAL FED
Lead Project: 315-03-0007
Parish: UNION
Routes: LA 143
Description: OUACHITA PARISH LINE - JCT. LA 2
Type Const: grading, drainage structures, in-place cement treated bc, cold planing asph pvmt,
superpave asph conc ovly and related work.
Low Bidder: D & J CONSTRUCTION CO., INC.
Amount: $2,894,986.26
Estimated Construction Cost: $3,638,412.01
Federal Number: STP-5604(501)

DBE GOAL FED
Lead Project: 423-01-0025
Parish: JEFFERSON
Routes: LA 3046, US 90
Description: CAUSEWAY BOULEVARD HOOKRAMP BRIDGE REHABILITATION
Type Const: bridge rehabilitation, cold planing asphaltic concrete pavement, superpave asphaltic
concrete pavement, traffic signalization, and related work.
Low Bidder: BOH BROS. CONSTRUCTION CO., LLC.
Amount: $4,147,981.85
Estimated Construction Cost: $2,920,117.60
Federal Number: BR-2600(503)

READV
Lead Project: 450-92-0044
Parish: E BATON ROUGE
Routes: I-110
Description: I-10 - S. END OF ELEVATED ROADWAY
Type Const: superpave acp, cleaning and resealing joints, cleaning and sealing random cracks,
full depth patching, sawing and sealing joints in acp and related work.
Low Bidder: KNISH CORPORATION
Amount: $1,779,059.00
Estimated Construction Cost: $1,390,123.75
Federal Number: IM-1706(516)

REBID
DBE GOAL FED
Lead Project: 455-01-0049
Parish: LAFAYETTE
Routes: I-49
Description: I-10 - ST. LANDRY PARISH LINE
Type Const: grading, drainage struct., portland cement concrete pavement patching, cold planing
asphaltic concrete, asphaltic surface trmt., superpave asphaltic concrete overlay, & related work.
Low Bidder: GILCHRIST CONSTRUCTION CO. LLC
Amount: $7,261,604.39
Estimated Construction Cost: $5,573,413.99
Federal Number: IM-2805(500)

DBE GOAL FED
Lead Project: 713-49-0115
Parish: ST LANDRY
Routes:
Description: BENNY PITRE, CHELSIE AND JIM GUILLORY ROAD BRIDGES
Type Const: grading, drainage structures, concrete slab span bridge and related work.
Low Bidder: BOH BROS. CONSTRUCTION CO., LLC.
Amount: $847,970.00
Estimated Construction Cost: $687,351.75
Federal Number: BRO-4902(511)

DBE GOAL FED
Lead Project: 713-62-0005
Parish: W CARROLL
Routes:
Description: RYE ROAD BRIDGE OVER LYON MILL BAYOU
Type Const: clearing and grubbing, grading, aggregate surfacing, concrete slab span bridge,
and related work.
Low Bidder: BEN ALLEN, INC.
Amount: $346,144.00
Estimated Construction Cost: $427,329.50
Federal Number: BRO-6202(503)

DBE GOAL FED
Lead Project: 836-08-0072
Parish: ORLEANS
Routes: LA 407
Description: ALGIERS CUT OFF CANAL BRIDGE LIGHTING INSTALLATION
Type Const: roadway lighting and related work.
Low Bidder: JACK B. HARPER CONTRACTOR, INC.
Amount: $888,750.00
Estimated Construction Cost: $582,692.10
Federal Number: STP-3605(500)

Lead Project: 840-45-0003
Parish: RAPIDES
Routes: LA 3265
Description: LA 3265 EROSION REPAIR
Type Const: grading, erosion repair and control, and related work.
Low Bidder: JEFF MERCER LLC
Amount: $276,170.35
Estimated Construction Cost: $274,860.50
Federal Number:

Lead Project: 852-11-0007
Parish: ST TAMMANY
Routes: LA 1088
Description: JCT. I-12 TO JCT. LA 36
Type Const: grading, lime treatment, in-place cement stabilized base course, superpave asphaltic
concrete overlay, and related work.
Low Bidder: BOH BROS. CONSTRUCTION CO., LLC.
Amount: $3,087,688.50
Estimated Construction Cost: $3,473,682.09
Federal Number:

Lead Project: 861-08-0017
Parish: W BATON ROUGE
Routes: LA 989-1
Description: LA 989-2 - END OF CONTROL
Type Const: grading, drainage structures, cold planing asphaltic concrete, superpave asphaltic
concrete overlay, cement treated base course, pavement patching and related work.
Low Bidder: F.G. SULLIVAN, JR. CONTRACTOR LLC
Amount: $2,166,710.54
Estimated Construction Cost: $2,342,617.88
Federal Number: