| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - BOH BROS. CONSTRUCTION CO., LLC. |
- 2 - BARRIERE CONSTRUCTION CO., LLC. |
- 3 - DIAMOND B CONSTRUCTION CO., L.L.C. |
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-02-G |
removal of surfacing & stabilized base
|
22.0 |
SQYD |
15.00 |
330.00 |
15.00 |
330.00 |
68.00 |
1,496.00 |
|
|
| 203-07 |
borrow (vehicular measurement)
|
8,231   |
CUYD |
10.00 |
82,310.00 |
18.00 |
148,158.00 |
16.25 |
133,753.75 |
|
|
| 203-07-A |
borrow (vehicular meas.)(selected soils)
|
18,763   |
CUYD |
10.00 |
187,630.00 |
18.00 |
337,734.00 |
16.25 |
304,898.75 |
|
|
| 204-06 |
temporary silt fencing
|
7,708   |
LNFT |
2.25 |
17,343.00 |
2.00 |
15,416.00 |
2.00 |
15,416.00 |
|
|
| 303-01-D |
in-place cement stabilized base course (12" thick)
|
90,786   |
SQYD |
8.00 |
726,288.00 |
8.70 |
789,838.20 |
9.50 |
862,467.00 |
|
|
| 303-02 |
removal of existing patches
|
600   |
SQYD |
10.00 |
6,000.00 |
16.00 |
9,600.00 |
20.00 |
12,000.00 |
|
|
| 304-05 |
lime treatment (type e)
|
625.59 |
TON |
300.00 |
187,677.00 |
105.00 |
65,686.95 |
300.00 |
187,677.00 |
|
|
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
2,421   |
CUYD |
40.00 |
96,840.00 |
75.00 |
181,575.00 |
75.00 |
181,575.00 |
|
|
| 402-01 |
traffic maintenance aggregate (vehicular measurement)
|
500.0 |
CUYD |
15.00 |
7,500.00 |
55.00 |
27,500.00 |
78.00 |
39,000.00 |
|
|
| 502-01 |
superpave asphaltic concrete
|
19,174.0 |
TON |
72.00 |
1,380,528.00 |
66.00 |
1,265,484.00 |
67.00 |
1,284,658.00 |
|
|
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
407.8 |
TON |
125.00 |
50,975.00 |
66.00 |
26,914.80 |
130.00 |
53,014.00 |
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
30,000.00 |
30,000.00 |
35,000.00 |
35,000.00 |
25,000.00 |
25,000.00 |
|
|
| 713-02-E |
temporary pavement markings (24" width)
|
30   |
LNFT |
0.10 |
3.00 |
1.00 |
30.00 |
1.10 |
33.00 |
|
|
| 713-03-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
18.990 |
MILE |
10.00 |
189.90 |
160.00 |
3,038.40 |
150.00 |
2,848.50 |
|
|
| 713-03-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
10.400 |
MILE |
15.00 |
156.00 |
230.00 |
2,392.00 |
330.00 |
3,432.00 |
|
|
| 713-04-A |
temporary pavement markings (solid line)(4" width)
|
33.620 |
MILE |
30.00 |
1,008.60 |
420.00 |
14,120.40 |
600.00 |
20,172.00 |
|
|
| 718-01 |
fertilizer
|
13,510   |
LB |
0.10 |
1,351.00 |
0.20 |
2,702.00 |
0.15 |
2,026.50 |
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
230,000.00 |
230,000.00 |
150,000.00 |
150,000.00 |
136,000.00 |
136,000.00 |
|
|
| 729-16-C |
object marker assembly (type 3)
|
54   |
EACH |
75.00 |
4,050.00 |
85.00 |
4,590.00 |
85.00 |
4,590.00 |
|
|
| 731-02 |
reflectorized raised pavement markers
|
836   |
EACH |
5.50 |
4,598.00 |
6.00 |
5,016.00 |
5.00 |
4,180.00 |
|
|
| 732-01-E |
plastic pavement striping (24" width)
|
15   |
LNFT |
4.00 |
60.00 |
8.00 |
120.00 |
3.50 |
52.50 |
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
16.810 |
MILE |
2,600.00 |
43,706.00 |
2,700.00 |
45,387.00 |
2,500.00 |
42,025.00 |
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
5.200 |
MILE |
800.00 |
4,160.00 |
900.00 |
4,680.00 |
800.00 |
4,160.00 |
|
|
| 739-01 |
hydro-seeding
|
13.51 |
ACRE |
1,000.00 |
13,510.00 |
1,100.00 |
14,861.00 |
1,000.00 |
13,510.00 |
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
9,500.00 |
9,500.00 |
32,000.00 |
32,000.00 |
22,000.00 |
22,000.00 |
|
|
| S-001 |
u-channel post installation
|
23   |
each |
65.00 |
1,495.00 |
80.00 |
1,840.00 |
70.00 |
1,610.00 |
|
|
| S-002 |
saw cutting of concrete/asphalt driveways and turnouts
(full depth) |
40   |
LNFT |
12.00 |
480.00 |
15.00 |
600.00 |
45.00 |
1,800.00 |
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
3,087,688.50 |
|
3,184,613.75 |
|
3,359,395.00 |
|
|
|