Letting of 7/25/2007 LA DOTD Headquarters


 
go back
Go Back
 
Lead Project: 852-11-0007
Parish: ST TAMMANY
Routes: LA 1088
Description: JCT. I-12 TO JCT. LA 36
Type Const: grading, lime treatment, in-place cement stabilized base course, superpave asphaltic
concrete overlay, and related work.
Estimated Construction Cost: $3,473,682.09
 
RankLicenseBidderConstruction Bid
1 02179 BOH BROS. CONSTRUCTION CO., LLC. $3,087,688.50
2 06276 BARRIERE CONSTRUCTION CO., LLC. $3,184,613.75
3 12487 DIAMOND B CONSTRUCTION CO., L.L.C. $3,359,395.00
 
Item Number Item Description Quantity Unit of Measure - 1 -
BOH BROS. CONSTRUCTION CO., LLC.
- 2 -
BARRIERE CONSTRUCTION CO., LLC.
- 3 -
DIAMOND B CONSTRUCTION CO., L.L.C.

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
202-02-G removal of surfacing & stabilized base 22.0    SQYD 15.00 330.00 15.00 330.00 68.00 1,496.00    
203-07 borrow (vehicular measurement) 8,231      CUYD 10.00 82,310.00 18.00 148,158.00 16.25 133,753.75    
203-07-A borrow (vehicular meas.)(selected soils) 18,763      CUYD 10.00 187,630.00 18.00 337,734.00 16.25 304,898.75    
204-06 temporary silt fencing 7,708      LNFT 2.25 17,343.00 2.00 15,416.00 2.00 15,416.00    
303-01-D in-place cement stabilized base course (12" thick) 90,786      SQYD 8.00 726,288.00 8.70 789,838.20 9.50 862,467.00    
303-02 removal of existing patches 600      SQYD 10.00 6,000.00 16.00 9,600.00 20.00 12,000.00    
304-05 lime treatment (type e) 625.59   TON 300.00 187,677.00 105.00 65,686.95 300.00 187,677.00    
401-02 aggregate surface course (adjusted vehicular
measurement)
2,421      CUYD 40.00 96,840.00 75.00 181,575.00 75.00 181,575.00    
402-01 traffic maintenance aggregate (vehicular measurement) 500.0    CUYD 15.00 7,500.00 55.00 27,500.00 78.00 39,000.00    
502-01 superpave asphaltic concrete 19,174.0    TON 72.00 1,380,528.00 66.00 1,265,484.00 67.00 1,284,658.00    
502-01-A superpave asphaltic concrete, drives, turnouts and
miscellaneous
407.8    TON 125.00 50,975.00 66.00 26,914.80 130.00 53,014.00    
713-01 temporary signs & barricades lump      LUMP 30,000.00 30,000.00 35,000.00 35,000.00 25,000.00 25,000.00    
713-02-E temporary pavement markings (24" width) 30      LNFT 0.10 3.00 1.00 30.00 1.10 33.00    
713-03-A temporary pavement markings (broken line)(4" width)(4'
length)
18.990  MILE 10.00 189.90 160.00 3,038.40 150.00 2,848.50    
713-03-B temporary pavement markings (broken line)(4" width)
(10' length)
10.400  MILE 15.00 156.00 230.00 2,392.00 330.00 3,432.00    
713-04-A temporary pavement markings (solid line)(4" width) 33.620  MILE 30.00 1,008.60 420.00 14,120.40 600.00 20,172.00    
718-01 fertilizer 13,510      LB 0.10 1,351.00 0.20 2,702.00 0.15 2,026.50    
727-01 mobilization lump      LUMP 230,000.00 230,000.00 150,000.00 150,000.00 136,000.00 136,000.00    
729-16-C object marker assembly (type 3) 54      EACH 75.00 4,050.00 85.00 4,590.00 85.00 4,590.00    
731-02 reflectorized raised pavement markers 836      EACH 5.50 4,598.00 6.00 5,016.00 5.00 4,180.00    
732-01-E plastic pavement striping (24" width) 15      LNFT 4.00 60.00 8.00 120.00 3.50 52.50    
732-02-A plastic pavement striping (solid line) (4" width) 16.810  MILE 2,600.00 43,706.00 2,700.00 45,387.00 2,500.00 42,025.00    
732-03-A plastic pavement striping (broken line)(4" width) 5.200  MILE 800.00 4,160.00 900.00 4,680.00 800.00 4,160.00    
739-01 hydro-seeding 13.51   ACRE 1,000.00 13,510.00 1,100.00 14,861.00 1,000.00 13,510.00    
740-01 construction layout lump      LUMP 9,500.00 9,500.00 32,000.00 32,000.00 22,000.00 22,000.00    
S-001 u-channel post installation 23      each 65.00 1,495.00 80.00 1,840.00 70.00 1,610.00    
S-002 saw cutting of concrete/asphalt driveways and turnouts
(full depth)
40      LNFT 12.00 480.00 15.00 600.00 45.00 1,800.00    
                       
 CONTRACTOR TOTAL       3,087,688.50   3,184,613.75   3,359,395.00    