Letting of 7/25/2007 LA DOTD Headquarters


 
go back
Go Back
DBE GOAL FED
Lead Project: 713-49-0115
Parish: ST LANDRY
Routes:
Description: BENNY PITRE, CHELSIE AND JIM GUILLORY ROAD BRIDGES
Type Const: grading, drainage structures, concrete slab span bridge and related work.
Estimated Construction Cost: $687,351.75
 
RankLicenseBidderConstruction Bid
1 02179 BOH BROS. CONSTRUCTION CO., LLC. $847,970.00
2 00060 F. MILLER CONSTRUCTION LLC $990,187.60
3 08815 W. E. MCDONALD & SON, LLC. $999,090.05
4 09090 GUINN BROTHERS, LLC. $1,152,396.00
 
Item Number Item Description Quantity Unit of Measure - 1 -
BOH BROS. CONSTRUCTION CO., LLC.
- 2 -
F. MILLER CONSTRUCTION LLC
- 3 -
W. E. MCDONALD & SON, LLC.
- 4 -
GUINN BROTHERS, LLC.
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
201-01 clearing & grubbing lump      LUMP 5,000.00 5,000.00 22,000.00 22,000.00 90,000.00 90,000.00 20,000.00 20,000.00
202-02-A-01 removal of bridge(sta. 100+00, 16.0' wide x 33.8'long
timber bridge)
1      EACH 2,200.00 2,200.00 9,000.00 9,000.00 20,000.00 20,000.00 10,000.00 10,000.00
202-02-A-02 removal of bridge(sta. 100+00, 20.7' wide x 44.0'long
timber bridge)
1      EACH 4,400.00 4,400.00 8,500.00 8,500.00 25,000.00 25,000.00 15,000.00 15,000.00
202-02-A-03 removal of bridge(sta. 100+00, 17.9' wide x 29.2'long
timber bridge)
1      EACH 2,200.00 2,200.00 8,500.00 8,500.00 15,000.00 15,000.00 10,000.00 10,000.00
203-05 excavation and embankment lump      LUMP 43,800.00 43,800.00 51,200.00 51,200.00 60,000.00 60,000.00 65,000.00 65,000.00
204-02 temporary hay or straw bales 35      EACH 13.00 455.00 12.00 420.00 200.00 7,000.00 100.00 3,500.00
204-03 temporary slope drains 160      LNFT 12.00 1,920.00 18.00 2,880.00 25.00 4,000.00 10.00 1,600.00
204-05-A temporary sediment check dams (hay) 12      EACH 195.00 2,340.00 140.00 1,680.00 500.00 6,000.00 500.00 6,000.00
204-06 temporary silt fencing 480      LNFT 2.80 1,344.00 3.00 1,440.00 6.00 2,880.00 5.00 2,400.00
402-01 traffic maintenance aggregate (vehicular measurement) 20.0    CUYD 61.00 1,220.00 205.00 4,100.00 50.00 1,000.00 100.00 2,000.00
403-01 aggregate roadway surfacing (vehicular measurement) 271.2    CUYD 60.00 16,272.00 130.00 35,256.00 90.00 24,408.00 100.00 27,120.00
701-05-G side drain pipe (18") 24      LNFT 110.00 2,640.00 92.00 2,208.00 65.00 1,560.00 100.00 2,400.00
701-05-G-01 side drain pipe (18")(erosion) 100      LNFT 110.00 11,000.00 46.00 4,600.00 100.00 10,000.00 100.00 10,000.00
701-05-I side drain pipe (24") 94      LNFT 132.00 12,408.00 110.00 10,340.00 85.00 7,990.00 115.00 10,810.00
701-05-I-01 side drain pipe (24")(erosion) 80      LNFT 132.00 10,560.00 80.00 6,400.00 125.00 10,000.00 115.00 9,200.00
701-05-K side drain pipe (30") 184      LNFT 165.00 30,360.00 160.00 29,440.00 110.00 20,240.00 129.00 23,736.00
701-05-M-01 side drain pipe (36")(erosion) 100      LNFT 220.00 22,000.00 120.00 12,000.00 165.00 16,500.00 146.00 14,600.00
701-05-O-01 side drain pipe (48")(erosion) 100      LNFT 330.00 33,000.00 190.00 19,000.00 200.00 20,000.00 200.00 20,000.00
704-08-B guard rail transitions (double thrie beam) 75.0    LNFT 61.00 4,575.00 84.00 6,300.00 65.00 4,875.00 75.00 5,625.00
704-09 guard rail anchor sections (turndown) 75.0    LNFT 50.00 3,750.00 44.00 3,300.00 35.00 2,625.00 50.00 3,750.00
704-11-A guard rail end treatment (flared) 1      EACH 2,800.00 2,800.00 3,000.00 3,000.00 3,000.00 3,000.00 5,000.00 5,000.00
705-01 barbed wire fence 300      LNFT 1.25 375.00 10.00 3,000.00 20.00 6,000.00 25.00 7,500.00
711-01-C riprap (30 lb,14" thick) 148      SQYD 54.00 7,992.00 100.00 14,800.00 100.00 14,800.00 100.00 14,800.00
711-04 geotextile fabric 148      SQYD 2.00 296.00 3.60 532.80 10.00 1,480.00 10.00 1,480.00
712-04 flexible revetment 484      SQYD 57.00 27,588.00 88.00 42,592.00 95.00 45,980.00 110.00 53,240.00
713-01 temporary signs & barricades lump      LUMP 31,000.00 31,000.00 36,000.00 36,000.00 30,000.00 30,000.00 136,000.00 136,000.00
716-01-A mulch (vegetative) 1.00   TON 1,330.00 1,330.00 1,200.00 1,200.00 3,000.00 3,000.00 2,000.00 2,000.00
717-01 seeding 23      LB 14.00 322.00 20.00 460.00 20.00 460.00 50.00 1,150.00
718-01 fertilizer 502      LB 1.00 502.00 2.50 1,255.00 2.00 1,004.00 2.00 1,004.00
726-01 bedding material 141.8    CUYD 100.00 14,180.00 150.00 21,270.00 50.00 7,090.00 120.00 17,016.00
727-01 mobilization lump      LUMP 90,000.00 90,000.00 90,000.00 90,000.00 65,000.00 65,000.00 155,000.00 155,000.00
729-16-B object marker assembly (type 2) 8      EACH 72.00 576.00 80.00 640.00 80.00 640.00 100.00 800.00
729-16-C object marker assembly (type 3) 7      EACH 83.00 581.00 90.00 630.00 90.00 630.00 110.00 770.00
740-01 construction layout lump      LUMP 20,000.00 20,000.00 14,000.00 14,000.00 15,000.00 15,000.00 18,000.00 18,000.00
804-01-B precast concrete piles (14") 960      LNFT 43.90 42,144.00 92.00 88,320.00 70.00 67,200.00 75.00 72,000.00
804-12 loading permanent piles 1      EACH 10,150.00 10,150.00 100.00 100.00 1.00 1.00 1.00 1.00
805-01-B class a concrete (box culvert headwalls) 50.04   CUYD 2,200.00 110,088.00 1,500.00 75,060.00 1,500.00 75,060.00 1,650.00 82,566.00
805-10-A bridge superstructure & substructure(28' clr. rdwy.;
75 degree crossing)
4      SPAN 28,330.00 113,320.00 33,985.00 135,940.00 40,000.00 160,000.00 18,750.00 75,000.00
805-12-N reinforced concrete box culverts (7'x 6') 180.0    LNFT 865.00 155,700.00 1,200.00 216,000.00 800.00 144,000.00 1,200.00 216,000.00
806-01 deformed reinforcing steel 3,791      LB 2.00 7,582.00 1.80 6,823.80 2.55 9,667.05 8.00 30,328.00
                       
 CONTRACTOR TOTAL       847,970.00   990,187.60   999,090.05   1,152,396.00