| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - DIAMOND B CONSTRUCTION CO., L.L.C. |
- 2 - D & J CONSTRUCTION CO., INC. |
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-01 |
removal of structures & obstructions
|
lump |
LUMP |
5,000.00 |
5,000.00 |
2,500.00 |
2,500.00 |
|
|
|
|
| 202-02-H |
removal of guard rail
|
1,330   |
LNFT |
5.50 |
7,315.00 |
8.00 |
10,640.00 |
|
|
|
|
| 203-07 |
borrow (vehicular measurement)
|
230   |
CUYD |
28.00 |
6,440.00 |
25.00 |
5,750.00 |
|
|
|
|
| 502-01 |
superpave asphaltic concrete
|
421.4 |
TON |
275.00 |
115,885.00 |
200.00 |
84,280.00 |
|
|
|
|
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
255.6 |
TON |
184.00 |
47,030.40 |
200.00 |
51,120.00 |
|
|
|
|
| 507-01-A |
asphaltic material (crs-2p cold applied emulsion)
|
30,394   |
GAL |
2.25 |
68,386.50 |
4.00 |
121,576.00 |
|
|
|
|
| 507-02-A |
aggregate (s1)
|
98,045   |
SQYD |
1.25 |
122,556.25 |
0.75 |
73,533.75 |
|
|
|
|
| 509-01 |
cold planing asphaltic pavement
|
5,108   |
SQYD |
14.00 |
71,512.00 |
7.00 |
35,756.00 |
|
|
|
|
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 143   |
CUYD |
0.10 |
- 14.30 |
0.01 |
- 1.43 |
|
|
|
|
| 510-01-C |
pavement patching (18" minimum thickness)
|
150   |
SQYD |
195.00 |
29,250.00 |
200.00 |
30,000.00 |
|
|
|
|
| 702-08-A |
side drain safety end (type 1)
|
7   |
EACH |
5,000.00 |
35,000.00 |
1,600.00 |
11,200.00 |
|
|
|
|
| 702-08-B |
side drain safety end (type 2)
|
1   |
EACH |
7,000.00 |
7,000.00 |
2,600.00 |
2,600.00 |
|
|
|
|
| 704-03 |
blocked out guard rail
|
975.2 |
LNFT |
20.00 |
19,504.00 |
18.00 |
17,553.60 |
|
|
|
|
| 704-08-B |
guard rail transitions (double thrie beam)
|
200.0 |
LNFT |
55.00 |
11,000.00 |
51.00 |
10,200.00 |
|
|
|
|
| 704-11-B |
guard rail end treatment (tangent)
|
8   |
EACH |
2,500.00 |
20,000.00 |
2,300.00 |
18,400.00 |
|
|
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
46,000.00 |
46,000.00 |
115,000.00 |
115,000.00 |
|
|
|
|
| 713-02-C |
temporary pavement markings (8" width)
|
205   |
LNFT |
0.35 |
71.75 |
3.00 |
615.00 |
|
|
|
|
| 713-03-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
14.976 |
MILE |
300.00 |
4,492.80 |
300.00 |
4,492.80 |
|
|
|
|
| 713-04-A |
temporary pavement markings (solid line)(4" width)
|
29.952 |
MILE |
550.00 |
16,473.60 |
1.00 |
29.95 |
|
|
|
|
| 713-05-A |
temporary pavement legends and symbols (arrow)
|
2   |
EACH |
66.00 |
132.00 |
250.00 |
500.00 |
|
|
|
|
| 713-06-A |
temporary reflectorized raised pavement markers (tabs)
|
1,954   |
EACH |
0.40 |
781.60 |
0.01 |
19.54 |
|
|
|
|
| 716-01-A |
mulch (vegetative)
|
0.2 |
TON |
5,500.00 |
1,100.00 |
1,000.00 |
200.00 |
|
|
|
|
| 717-01 |
seeding
|
4   |
LB |
110.00 |
440.00 |
100.00 |
400.00 |
|
|
|
|
| 718-01 |
fertilizer
|
74   |
LB |
11.00 |
814.00 |
10.00 |
740.00 |
|
|
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
137,000.00 |
137,000.00 |
120,000.00 |
120,000.00 |
|
|
|
|
| 729-16-C |
object marker assembly (type 3)
|
8   |
EACH |
77.00 |
616.00 |
70.00 |
560.00 |
|
|
|
|
| 731-02 |
reflectorized raised pavement markers
|
1,954   |
EACH |
5.00 |
9,770.00 |
6.50 |
12,701.00 |
|
|
|
|
| 732-01-C |
plastic pavement striping (8" width)
|
205   |
LNFT |
1.00 |
205.00 |
6.00 |
1,230.00 |
|
|
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
28.952 |
MILE |
2,300.00 |
66,589.60 |
2,300.00 |
66,589.60 |
|
|
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
14.976 |
MILE |
800.00 |
11,980.80 |
1,200.00 |
17,971.20 |
|
|
|
|
| 732-04-A |
plastic pavement legends & symbols (arrow)
|
2   |
EACH |
175.00 |
350.00 |
500.00 |
1,000.00 |
|
|
|
|
| 735-01 |
mailboxes
|
44   |
EACH |
1.00 |
44.00 |
20.00 |
880.00 |
|
|
|
|
| 735-02 |
mailbox supports (single)
|
42   |
EACH |
120.00 |
5,040.00 |
185.00 |
7,770.00 |
|
|
|
|
| 735-03 |
mailbox supports (double)
|
1   |
EACH |
175.00 |
175.00 |
225.00 |
225.00 |
|
|
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
8,000.00 |
8,000.00 |
15,000.00 |
15,000.00 |
|
|
|
|
| S-001 |
ultra-thin hmac wearing course system (0.75 inch thick)
|
244,014   |
SQYD |
6.00 |
1,464,084.00 |
6.20 |
1,512,886.80 |
|
|
|
|
| S-002 |
cleaning existing ditches
|
200   |
LNFT |
40.00 |
8,000.00 |
20.00 |
4,000.00 |
|
|
|
|
| S-003 |
rumble strips (ground-in)
|
30.0 |
MILE |
750.00 |
22,500.00 |
650.00 |
19,500.00 |
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
2,370,525.00 |
|
2,377,418.81 |
|
|
|
|
|