Letting of 7/25/2007 LA DOTD Headquarters


 
go back
Go Back
DBE GOAL FED
Lead Project: 026-08-0025
Parish: RICHLAND
Routes: US 425
Description: JCT LA 856 - JCT LA 137 AND JCT LA 15 - JCT I-20
Type Const: drain struct, cold planing acp, asphaltic surface trmt, ultra-thin hmac wearing
course system, superpave acp overlay and related work
Estimated Construction Cost: $2,720,503.09
 
RankLicenseBidderConstruction Bid
1 12487 DIAMOND B CONSTRUCTION CO., L.L.C. $2,370,525.00
2 05789 D & J CONSTRUCTION CO., INC. $2,377,418.81
 
Item Number Item Description Quantity Unit of Measure - 1 -
DIAMOND B CONSTRUCTION CO., L.L.C.
- 2 -
D & J CONSTRUCTION CO., INC.

 

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
202-01 removal of structures & obstructions lump      LUMP 5,000.00 5,000.00 2,500.00 2,500.00        
202-02-H removal of guard rail 1,330      LNFT 5.50 7,315.00 8.00 10,640.00        
203-07 borrow (vehicular measurement) 230      CUYD 28.00 6,440.00 25.00 5,750.00        
502-01 superpave asphaltic concrete 421.4    TON 275.00 115,885.00 200.00 84,280.00        
502-01-A superpave asphaltic concrete, drives, turnouts and
miscellaneous
255.6    TON 184.00 47,030.40 200.00 51,120.00        
507-01-A asphaltic material (crs-2p cold applied emulsion) 30,394      GAL 2.25 68,386.50 4.00 121,576.00        
507-02-A aggregate (s1) 98,045      SQYD 1.25 122,556.25 0.75 73,533.75        
509-01 cold planing asphaltic pavement 5,108      SQYD 14.00 71,512.00 7.00 35,756.00        
509-02 contractor retained reclaimed asphaltic pavement - 143      CUYD 0.10 - 14.30 0.01 - 1.43        
510-01-C pavement patching (18" minimum thickness) 150      SQYD 195.00 29,250.00 200.00 30,000.00        
702-08-A side drain safety end (type 1) 7      EACH 5,000.00 35,000.00 1,600.00 11,200.00        
702-08-B side drain safety end (type 2) 1      EACH 7,000.00 7,000.00 2,600.00 2,600.00        
704-03 blocked out guard rail 975.2    LNFT 20.00 19,504.00 18.00 17,553.60        
704-08-B guard rail transitions (double thrie beam) 200.0    LNFT 55.00 11,000.00 51.00 10,200.00        
704-11-B guard rail end treatment (tangent) 8      EACH 2,500.00 20,000.00 2,300.00 18,400.00        
713-01 temporary signs & barricades lump      LUMP 46,000.00 46,000.00 115,000.00 115,000.00        
713-02-C temporary pavement markings (8" width) 205      LNFT 0.35 71.75 3.00 615.00        
713-03-B temporary pavement markings (broken line)(4" width)
(10' length)
14.976  MILE 300.00 4,492.80 300.00 4,492.80        
713-04-A temporary pavement markings (solid line)(4" width) 29.952  MILE 550.00 16,473.60 1.00 29.95        
713-05-A temporary pavement legends and symbols (arrow) 2      EACH 66.00 132.00 250.00 500.00        
713-06-A temporary reflectorized raised pavement markers (tabs) 1,954      EACH 0.40 781.60 0.01 19.54        
716-01-A mulch (vegetative) 0.2    TON 5,500.00 1,100.00 1,000.00 200.00        
717-01 seeding 4      LB 110.00 440.00 100.00 400.00        
718-01 fertilizer 74      LB 11.00 814.00 10.00 740.00        
727-01 mobilization lump      LUMP 137,000.00 137,000.00 120,000.00 120,000.00        
729-16-C object marker assembly (type 3) 8      EACH 77.00 616.00 70.00 560.00        
731-02 reflectorized raised pavement markers 1,954      EACH 5.00 9,770.00 6.50 12,701.00        
732-01-C plastic pavement striping (8" width) 205      LNFT 1.00 205.00 6.00 1,230.00        
732-02-A plastic pavement striping (solid line) (4" width) 28.952  MILE 2,300.00 66,589.60 2,300.00 66,589.60        
732-03-A plastic pavement striping (broken line)(4" width) 14.976  MILE 800.00 11,980.80 1,200.00 17,971.20        
732-04-A plastic pavement legends & symbols (arrow) 2      EACH 175.00 350.00 500.00 1,000.00        
735-01 mailboxes 44      EACH 1.00 44.00 20.00 880.00        
735-02 mailbox supports (single) 42      EACH 120.00 5,040.00 185.00 7,770.00        
735-03 mailbox supports (double) 1      EACH 175.00 175.00 225.00 225.00        
740-01 construction layout lump      LUMP 8,000.00 8,000.00 15,000.00 15,000.00        
S-001 ultra-thin hmac wearing course system (0.75 inch thick) 244,014      SQYD 6.00 1,464,084.00 6.20 1,512,886.80        
S-002 cleaning existing ditches 200      LNFT 40.00 8,000.00 20.00 4,000.00        
S-003 rumble strips (ground-in) 30.0    MILE 750.00 22,500.00 650.00 19,500.00        
                       
 CONTRACTOR TOTAL       2,370,525.00   2,377,418.81        