| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - D & J CONSTRUCTION CO., INC. |
- 2 - GILCHRIST CONSTRUCTION CO. LLC |
- 3 - DIAMOND B CONSTRUCTION CO., L.L.C. |
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-02-H |
removal of guard rail
|
38   |
LNFT |
40.00 |
1,520.00 |
40.00 |
1,520.00 |
6.00 |
228.00 |
|
|
| 203-07 |
borrow (vehicular measurement)
|
271   |
CUYD |
30.00 |
8,130.00 |
14.00 |
3,794.00 |
40.00 |
10,840.00 |
|
|
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
484   |
CUYD |
35.00 |
16,940.00 |
56.00 |
27,104.00 |
55.00 |
26,620.00 |
|
|
| 502-01 |
superpave asphaltic concrete
|
10,396.4 |
TON |
73.00 |
758,937.20 |
85.00 |
883,694.00 |
82.00 |
852,504.80 |
|
|
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
2,025.9 |
TON |
73.00 |
147,890.70 |
85.00 |
172,201.50 |
125.00 |
253,237.50 |
|
|
| 507-01-A |
asphaltic material (crs-2p cold applied emulsion)
|
45,014   |
GAL |
2.10 |
94,529.40 |
2.70 |
121,537.80 |
2.50 |
112,535.00 |
|
|
| 507-02-B |
aggregate (s2)
|
115,420   |
SQYD |
1.20 |
138,504.00 |
0.88 |
101,569.60 |
1.75 |
201,985.00 |
|
|
| 509-01 |
cold planing asphaltic pavement
|
87,628   |
SQYD |
1.00 |
87,628.00 |
1.65 |
144,586.20 |
1.50 |
131,442.00 |
|
|
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 2,740   |
CUYD |
0.01 |
- 27.40 |
0.01 |
- 27.40 |
0.10 |
- 274.00 |
|
|
| 510-01-B |
pavement patching (12" minimum thickness)
|
367   |
SQYD |
125.00 |
45,875.00 |
70.00 |
25,690.00 |
95.00 |
34,865.00 |
|
|
| 510-01-C |
pavement patching (18" minimum thickness)
|
483   |
SQYD |
150.00 |
72,450.00 |
75.00 |
36,225.00 |
145.00 |
70,035.00 |
|
|
| 704-01-B |
guard rail (single thrie beam)(6'-3" post spacing)
|
530.0 |
LNFT |
35.00 |
18,550.00 |
36.00 |
19,080.00 |
35.00 |
18,550.00 |
|
|
| 704-03 |
blocked out guard rail
|
1,237.5 |
LNFT |
18.00 |
22,275.00 |
20.00 |
24,750.00 |
18.00 |
22,275.00 |
|
|
| 704-08-B |
guard rail transitions (double thrie beam)
|
200.0 |
LNFT |
50.00 |
10,000.00 |
60.00 |
12,000.00 |
55.00 |
11,000.00 |
|
|
| 704-11-A |
guard rail end treatment (flared)
|
8   |
EACH |
2,000.00 |
16,000.00 |
2,100.00 |
16,800.00 |
2,000.00 |
16,000.00 |
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
25,000.00 |
25,000.00 |
7,000.00 |
7,000.00 |
20,000.00 |
20,000.00 |
|
|
| 713-04-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
6.134 |
MILE |
225.00 |
1,380.15 |
450.00 |
2,760.30 |
500.00 |
3,067.00 |
|
|
| 713-04-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
5.018 |
MILE |
300.00 |
1,505.40 |
1.00 |
5.02 |
300.00 |
1,505.40 |
|
|
| 713-05-A |
temporary pavement markings (solid line)(4" width)
|
16.594 |
MILE |
1.00 |
16.59 |
1.00 |
16.59 |
500.00 |
8,297.00 |
|
|
| 717-01 |
seeding
|
2   |
LB |
500.00 |
1,000.00 |
22.00 |
44.00 |
100.00 |
200.00 |
|
|
| 718-01 |
fertilizer
|
30   |
LB |
35.00 |
1,050.00 |
1.70 |
51.00 |
10.00 |
300.00 |
|
|
| 726-01 |
bedding material
|
41.7 |
CUYD |
90.00 |
3,753.00 |
100.00 |
4,170.00 |
115.00 |
4,795.50 |
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
50,000.00 |
50,000.00 |
125,000.00 |
125,000.00 |
134,000.00 |
134,000.00 |
|
|
| 729-16-C |
object marker assembly (type 3)
|
8   |
EACH |
75.00 |
600.00 |
80.00 |
640.00 |
75.00 |
600.00 |
|
|
| 731-02 |
reflectorized raised pavement markers
|
811   |
EACH |
7.00 |
5,677.00 |
5.80 |
4,703.80 |
5.00 |
4,055.00 |
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
16.594 |
MILE |
2,200.00 |
36,506.80 |
2,900.00 |
48,122.60 |
2,300.00 |
38,166.20 |
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
5.018 |
MILE |
1,300.00 |
6,523.40 |
970.00 |
4,867.46 |
700.00 |
3,512.60 |
|
|
| 735-01 |
mailboxes
|
28   |
EACH |
10.00 |
280.00 |
10.00 |
280.00 |
1.00 |
28.00 |
|
|
| 735-02 |
mailbox supports (single)
|
20   |
EACH |
130.00 |
2,600.00 |
145.00 |
2,900.00 |
125.00 |
2,500.00 |
|
|
| 735-03 |
mailbox supports (double)
|
4   |
EACH |
250.00 |
1,000.00 |
185.00 |
740.00 |
160.00 |
640.00 |
|
|
| 805-01-B |
class a concrete (box culvert headwalls)
|
18.69 |
CUYD |
1,200.00 |
22,428.00 |
1,200.00 |
22,428.00 |
2,500.00 |
46,725.00 |
|
|
| 805-12-Y |
reinforced concrete box culverts (12'x 5')
|
23.0 |
LNFT |
750.00 |
17,250.00 |
1,300.00 |
29,900.00 |
2,750.00 |
63,250.00 |
|
|
| 806-01 |
deformed reinforcing steel
|
1,412   |
LB |
2.00 |
2,824.00 |
2.60 |
3,671.20 |
1.50 |
2,118.00 |
|
|
| S-001 |
radar traffic sensor and recorder system
|
1   |
EACH |
30,000.00 |
30,000.00 |
32,000.00 |
32,000.00 |
32,000.00 |
32,000.00 |
|
|
| S-002 |
sawing and sealing longitudinal joints in asphaltic
concrete overlay |
900   |
LNFT |
4.00 |
3,600.00 |
3.75 |
3,375.00 |
5.00 |
4,500.00 |
|
|
| S-003 |
sawing and sealing transverse joints in asphaltic
concrete overlay |
360   |
LNFT |
6.75 |
2,430.00 |
4.52 |
1,627.20 |
5.00 |
1,800.00 |
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
1,654,626.24 |
|
1,884,826.87 |
|
2,133,903.00 |
|
|
|