| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - BOH BROS. CONSTRUCTION CO., LLC. |
|
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-02-E |
removal of concrete curbs
|
106.0 |
LNFT |
20.00 |
2,120.00 |
|
|
|
|
|
|
| 202-02-01 |
removal of bridge deck & rail (sta. 78+61.67 to
88+06.64) |
lump |
LUMP |
400,000.00 |
400,000.00 |
|
|
|
|
|
|
| 202-02-02 |
removal of concrete approach slabs (sta. 78+40.67 to
78+61.67) and (sta 88+06.64 to sta 88+27.64) |
2   |
EACH |
8,500.00 |
17,000.00 |
|
|
|
|
|
|
| 202-02-03 |
partial removal of bridge abutment # 1 end dam (sta.
78+61.67) |
lump |
LUMP |
15,000.00 |
15,000.00 |
|
|
|
|
|
|
| 202-02-04 |
removal of bridge abutment #2 cap (sta. 88+06.64)
|
lump |
LUMP |
15,000.00 |
15,000.00 |
|
|
|
|
|
|
| 502-01-A |
superpave asphalt concrete, drives, turnouts and
miscellaneous |
120.9 |
TON |
325.00 |
39,292.50 |
|
|
|
|
|
|
| 509-01 |
cold planing asphaltic pavement
|
746.0 |
SQYD |
7.00 |
5,222.00 |
|
|
|
|
|
|
| 705-09 |
rebuilt fence
|
200.0 |
LNFT |
30.00 |
6,000.00 |
|
|
|
|
|
|
| 707-01 |
concrete curb
|
106.0 |
LNFT |
40.00 |
4,240.00 |
|
|
|
|
|
|
| 713-01 |
temporary signs and barricades
|
lump |
LUMP |
155,000.00 |
155,000.00 |
|
|
|
|
|
|
| 713-02-C |
temporary pavement markings (8" width)
|
345   |
LNFT |
0.35 |
120.75 |
|
|
|
|
|
|
| 713-02-D |
temporary pavement markings (12" width)
|
38   |
LNFT |
0.55 |
20.90 |
|
|
|
|
|
|
| 713-02-E |
temporary pavement markings (24" width)
|
36   |
LNFT |
1.00 |
36.00 |
|
|
|
|
|
|
| 713-03-A-01 |
temporary pvmt. markings (broken line) (4" width) (4'
length) (type i removable) |
0.020 |
MILE |
5,500.00 |
110.00 |
|
|
|
|
|
|
| 713-04-A-01 |
temporary pavement markings (solid line)(4" width)
(type i removable) |
0.409 |
MILE |
16,000.00 |
6,544.00 |
|
|
|
|
|
|
| 713-05-A |
temporary pavement legends and symbols (arrow)
|
1   |
EACH |
60.00 |
60.00 |
|
|
|
|
|
|
| 713-05-C |
temporary pavement legends and symbols (only)
|
1   |
EACH |
90.00 |
90.00 |
|
|
|
|
|
|
| 713-06 |
temporary reflectorized raised pavement markers
|
42   |
EACH |
6.00 |
252.00 |
|
|
|
|
|
|
| 713-08 |
temporary precast concrete barrier (dotd furnished)
|
20   |
EACH |
1,500.00 |
30,000.00 |
|
|
|
|
|
|
| 722-02 |
project site laboratory (equipped)
|
1   |
EACH |
20,000.00 |
20,000.00 |
|
|
|
|
|
|
| 725-01 |
temporary detour roads
|
50.5 |
SQYD |
25.00 |
1,262.50 |
|
|
|
|
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
410,000.00 |
410,000.00 |
|
|
|
|
|
|
| 729-01-A |
sign (type a) (r10-10) (24"x 30") (1 each ladotd)
|
5.0 |
SQFT |
300.00 |
1,500.00 |
|
|
|
|
|
|
| 729-01-B |
sign (type a) (r3-2) (24" x 24") (1 each ladotd)
|
4.0 |
SQFT |
300.00 |
1,200.00 |
|
|
|
|
|
|
| 729-01-C |
sign (type a) (r10-6) (24" x 36") (2 each ladotd)
|
12.0 |
SQFT |
300.00 |
3,600.00 |
|
|
|
|
|
|
| 729-06 |
sign (overhead mounted)
|
28.0 |
SQFT |
30.00 |
840.00 |
|
|
|
|
|
|
| 729-13 |
sign mounting (bridge fascia mounted)
|
2   |
EACH |
7,500.00 |
15,000.00 |
|
|
|
|
|
|
| 729-15 |
delineator assembly (structure mounted)
|
17   |
EACH |
200.00 |
3,400.00 |
|
|
|
|
|
|
| 729-16-B |
object marker assembly (type 2)
|
4   |
EACH |
225.00 |
900.00 |
|
|
|
|
|
|
| 730-01 |
trenching and backfilling
|
80   |
LNFT |
7.00 |
560.00 |
|
|
|
|
|
|
| 730-02-01 |
conduit with conductors (1" rigid aluminum, 2-1/c
#8 xhhw w/1-1/c #8 ground |
250   |
LNFT |
17.00 |
4,250.00 |
|
|
|
|
|
|
| 730-02-02 |
conduit with conductors (1" rigid aluminum, 4-1/c
#8 xhhw w/1-1/c #8 ground |
1,300   |
LNFT |
20.00 |
26,000.00 |
|
|
|
|
|
|
| 730-02-03 |
conduit with conductors (1" pvc schedule 40 in trench,
4-1/c #6 xhhw w/1-1/c #8 ground |
30   |
LNFT |
25.00 |
750.00 |
|
|
|
|
|
|
| 730-02-04 |
conduit with conductors (1" pvc schedule 40 in trench,
2-1/c #6 xhhw w/1-1/c #8 ground |
60   |
LNFT |
8.00 |
480.00 |
|
|
|
|
|
|
| 730-05 |
light pole (30' aluminum)
|
13   |
EACH |
3,000.00 |
39,000.00 |
|
|
|
|
|
|
| 730-07 |
luminaire (250 w hps)
|
13   |
EACH |
500.00 |
6,500.00 |
|
|
|
|
|
|
| 730-08 |
electrical service point (overhead)
|
1   |
EACH |
6,500.00 |
6,500.00 |
|
|
|
|
|
|
| 730-11 |
removal and disposal of electrical equipment
|
lump |
LUMP |
2,700.00 |
2,700.00 |
|
|
|
|
|
|
| 730-15 |
relocate light poles (30' steel)
|
1   |
EACH |
3,000.00 |
3,000.00 |
|
|
|
|
|
|
| 730-16 |
underground junction box (12" x 12" x 10")
|
1   |
EACH |
600.00 |
600.00 |
|
|
|
|
|
|
| 730-17 |
structure junction box (8" x 8" x 6")
|
17   |
EACH |
700.00 |
11,900.00 |
|
|
|
|
|
|
| 731-02 |
reflectorized raised pavement markers
|
280   |
EACH |
7.00 |
1,960.00 |
|
|
|
|
|
|
| 732-01-D |
plastic pavement striping (12" width)
|
184   |
LNFT |
1.50 |
276.00 |
|
|
|
|
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
0.379 |
MILE |
3,400.00 |
1,288.60 |
|
|
|
|
|
|
| 736-04 |
signal support (26' steel strain pole)
|
2   |
EACH |
9,000.00 |
18,000.00 |
|
|
|
|
|
|
| 736-05-A |
signal head (retrofitted with led's)
|
3   |
EACH |
1,100.00 |
3,300.00 |
|
|
|
|
|
|
| 736-06 |
signal service
|
1   |
EACH |
900.00 |
900.00 |
|
|
|
|
|
|
| 736-10 |
underground junction box
|
1   |
EACH |
1,100.00 |
1,100.00 |
|
|
|
|
|
|
| 736-11 |
conduit (3" p.e.c.)
|
10   |
LNFT |
7.00 |
70.00 |
|
|
|
|
|
|
| 736-12-A |
conductor, 6c (signal #14 awg)
|
210   |
LNFT |
3.00 |
630.00 |
|
|
|
|
|
|
| 736-12-B |
conductor, 10c (signal #14 awg)
|
426   |
LNFT |
4.00 |
1,704.00 |
|
|
|
|
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
175,000.00 |
175,000.00 |
|
|
|
|
|
|
| 805-01-F |
class a concrete
|
16.83 |
CUYD |
1,700.00 |
28,611.00 |
|
|
|
|
|
|
| 805-03 |
class aa concrete
|
753.92 |
CUYD |
1,000.00 |
753,920.00 |
|
|
|
|
|
|
| 805-11 |
strip seal joints
|
609.00 |
LNFT |
170.00 |
103,530.00 |
|
|
|
|
|
|
| 806-01 |
deformed reinforcing steel
|
248,544   |
LB |
1.00 |
248,544.00 |
|
|
|
|
|
|
| 807-08 |
structural metalwork
|
lump |
LUMP |
325,000.00 |
325,000.00 |
|
|
|
|
|
|
| 810-01 |
concrete railing (f-shape pl-2)
|
1,890.32 |
LNFT |
80.00 |
151,225.60 |
|
|
|
|
|
|
| 813-01 |
concrete approach slabs
|
134.80 |
SQYD |
140.00 |
18,872.00 |
|
|
|
|
|
|
| S-001 |
dynamic message sign unit
|
2   |
EACH |
20,000.00 |
40,000.00 |
|
|
|
|
|
|
| S-002 |
remove and reinstall historic marker
|
1   |
EACH |
1,500.00 |
1,500.00 |
|
|
|
|
|
|
| S-003 |
video detector camera and associated equipment
|
2   |
EACH |
10,000.00 |
20,000.00 |
|
|
|
|
|
|
| S-101 |
guardrail
|
lump |
LUMP |
10,000.00 |
10,000.00 |
|
|
|
|
|
|
| S-102 |
new anchor bolts for joint at abutment #1
|
10   |
EACH |
180.00 |
1,800.00 |
|
|
|
|
|
|
| S-103 |
existing girder and diaphragm handling
|
lump |
LUMP |
500,000.00 |
500,000.00 |
|
|
|
|
|
|
| S-104 |
top flange treatment for girder ends
|
188   |
EACH |
900.00 |
169,200.00 |
|
|
|
|
|
|
| S-105 |
bottom flange treatment for girder ends
|
118   |
EACH |
1,500.00 |
177,000.00 |
|
|
|
|
|
|
| S-106 |
extension of existing anchor bolts for girders
|
234   |
EACH |
150.00 |
35,100.00 |
|
|
|
|
|
|
| S-107 |
new anchor bolts for span 8 girders
|
16   |
EACH |
250.00 |
4,000.00 |
|
|
|
|
|
|
| S-108 |
non-shrink grout risers
|
8   |
EACH |
300.00 |
2,400.00 |
|
|
|
|
|
|
| S-109 |
concrete risers
|
115   |
EACH |
800.00 |
92,000.00 |
|
|
|
|
|
|
| S-110 |
de-energize overhead powerline
|
lump |
LUMP |
5,000.00 |
5,000.00 |
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | ITEM TOTAL (CONSTRUCTION BID) |
|
|
|
4,147,981.85 |
|
|
|
|
|
|
| | NUMBER OF DAYS BID AT $480 PER DAY. |
|
|
|
144,000.00 |
|
|
|
|
|
|
| | TOTAL BID |
|
|
|
4,291,981.85 |
|
|
|
|
|
|
|