Letting of 7/25/2007 LA DOTD Headquarters


 
go back
Go Back
DBE GOAL FED
Lead Project: 232-01-0059
Parish: ASSUMPTION
Routes: LA 70
Description: LA 70 IN PIERRE PART
Type Const: grading, drainage structures, class ii base course, cold planing asphaltic concrete
pavement, superpave asphaltic concrete pavement and related work.
Estimated Construction Cost: $7,816,142.88
Maximum Number of Days Allowed for Construction: 400
Calculated Daily User Cost: $2,000.00
 
RankLicenseBidderConstruction Bid Bidder's Proposed
Contract Time
Total Bid
1 27634 PHYLWAY CONSTRUCTION LLC $7,284,076.75 389 $8,062,076.75
2 00849 F.G. SULLIVAN, JR. CONTRACTOR LLC $7,288,957.24 400 $8,088,957.24
3 12198 BYRON E. TALBOT CONTRACTOR, INC. $7,831,002.00 320 $8,471,002.00
4 00481 COASTAL BRIDGE CO., L.L.C. $9,384,477.91 400 $10,184,477.91
 
Item Number Item Description Quantity Unit of Measure - 1 -
PHYLWAY CONSTRUCTION LLC
- 2 -
F.G. SULLIVAN, JR. CONTRACTOR LLC
- 3 -
BYRON E. TALBOT CONTRACTOR, INC.
- 4 -
COASTAL BRIDGE CO., L.L.C.
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
201-01 clearing & grubbing lump      LUMP 200,000.00 200,000.00 5,000.00 5,000.00 102,334.80 102,334.80 400,000.00 400,000.00
202-01 removal of structures & obstructions lump      LUMP 100,000.00 100,000.00 29,000.00 29,000.00 138,100.00 138,100.00 125,000.00 125,000.00
202-02-D removal of concrete walks & drives 4,884      SQYD 5.50 26,862.00 14.00 68,376.00 12.00 58,608.00 20.00 97,680.00
202-02-E removal of concrete curbs 619.0    LNFT 12.00 7,428.00 5.00 3,095.00 1.50 928.50 25.00 15,475.00
202-02-G removal of surfacing & stabilized base 16,827.9    SQYD 5.50 92,553.45 8.00 134,623.20 10.00 168,279.00 15.00 252,418.50
202-02-I removal of 6'x12' metal sign station 113+50 right 1      EACH 300.00 300.00 300.00 300.00 2,000.00 2,000.00 1,500.00 1,500.00
202-02-J removal of 4.5'x4' wood sign station 115+00 left 1      EACH 300.00 300.00 300.00 300.00 2,000.00 2,000.00 2,000.00 2,000.00
202-02-K removal of 6'x12' metal sign station 118+00 right 1      EACH 300.00 300.00 300.00 300.00 2,000.00 2,000.00 2,500.00 2,500.00
202-02-01 removal of abandoned telephone cable (length 5500 ft.)
2-900pr,600pr,400pr avg. depth 24"(sta. 101)
1      EACH 7,000.00 7,000.00 17,000.00 17,000.00 55,000.00 55,000.00 30,000.00 30,000.00
202-02-02 removal of abandoned telephone cable (length 5500 ft.)
300pr avg. depth 24" (sta. 101)
1      EACH 7,000.00 7,000.00 17,000.00 17,000.00 16,000.00 16,000.00 30,000.00 30,000.00
202-02-03 removal of abandoned telephone cable (length 5500 ft.)
50pr avg. depth 24"
1      EACH 7,000.00 7,000.00 17,000.00 17,000.00 16,000.00 16,000.00 30,000.00 30,000.00
203-01 general excavation 10,191      CUYD 10.00 101,910.00 10.00 101,910.00 11.00 112,101.00 10.00 101,910.00
203-02 drainage excavation 500      CUYD 12.00 6,000.00 12.00 6,000.00 16.50 8,250.00 15.00 7,500.00
203-03 embankment 6,457      CUYD 30.00 193,710.00 30.00 193,710.00 35.35 228,254.95 25.00 161,425.00
204-02 temporary hay or straw bales 150      EACH 10.00 1,500.00 9.00 1,350.00 10.00 1,500.00 8.50 1,275.00
204-05-A temporary sediment check dams (hay) 50      EACH 125.00 6,250.00 100.00 5,000.00 110.00 5,500.00 100.00 5,000.00
204-06 temporary silt fencing 8,000      LNFT 2.50 20,000.00 1.45 11,600.00 3.10 24,800.00 1.35 10,800.00
302-01 class ii base course 8,029.4    CUYD 110.00 883,234.00 90.00 722,646.00 111.07 891,825.46 120.00 963,528.00
304-01 lime 355.82   TON 165.00 58,710.30 170.00 60,489.40 200.00 71,164.00 140.00 49,814.80
304-04-D lime treatment (type d) (12" thick) 25,102      SQYD 1.75 43,928.50 2.00 50,204.00 2.00 50,204.00 2.50 62,755.00
402-01 traffic maintenance aggregate (vehicular measurement) 1,000.0    CUYD 76.00 76,000.00 50.00 50,000.00 66.65 66,650.00 100.00 100,000.00
502-01 superpave asphaltic concrete 16,869.4    TON 75.00 1,265,205.00 75.00 1,265,205.00 85.00 1,433,899.00 85.00 1,433,899.00
502-01-A superpave asphaltic concrete, drives, turnouts and
miscellaneous
668.4    TON 110.00 73,524.00 140.00 93,576.00 110.00 73,524.00 150.00 100,260.00
509-01 cold planing asphaltic pavement 36,697      SQYD 2.50 91,742.50 2.00 73,394.00 2.25 82,568.25 2.15 78,898.55
509-02 contractor retained reclaimed asphaltic pavement - 1,529      CUYD 5.00 - 7,645.00 0.01 - 15.29 11.00 - 16,819.00 1.00 - 1,529.00
510-01-B pavement patching (12" minimum thickness) 2,000      SQYD 100.00 200,000.00 85.00 170,000.00 105.00 210,000.00 90.00 180,000.00
701-03-F storm drain pipe (15" rcp/pcp) 3,550      LNFT 50.00 177,500.00 90.00 319,500.00 72.15 256,132.50 75.00 266,250.00
701-03-G storm drain pipe (18" rcp/pcp) 2,678      LNFT 55.00 147,290.00 95.00 254,410.00 65.75 176,078.50 80.00 214,240.00
701-03-I storm drain pipe (24" rcp/pcp) 3,508      LNFT 65.00 228,020.00 105.00 368,340.00 91.50 320,982.00 90.00 315,720.00
701-03-K storm drain pipe (30" rcp/pcp) 947      LNFT 90.00 85,230.00 115.00 108,905.00 122.25 115,770.75 105.00 99,435.00
701-03-M storm drain pipe (36" rcp/pcp) 287      LNFT 115.00 33,005.00 145.00 41,615.00 214.60 61,590.20 125.55 36,032.85
701-03-M/N-01 storm drain pipe (36" pcp or 42" cmp)(outfall) 12      LNFT 180.00 2,160.00 150.00 1,800.00 475.00 5,700.00 125.55 1,506.60
701-03-N storm drain pipe (42" rcp/pcp) 88      LNFT 190.00 16,720.00 210.00 18,480.00 250.00 22,000.00 175.20 15,417.60
701-03-O storm drain pipe (48" rcp/pcp) 88      LNFT 200.00 17,600.00 230.00 20,240.00 260.00 22,880.00 198.50 17,468.00
701-03-O/P-01 storm drain pipe (48" pcp or 54" cmp)(outfall) 105      LNFT 150.00 15,750.00 0.00 0.00 250.00 26,250.00 198.50 20,842.50
701-09-01 fabricating pipe fittings 15"x15"x15" 10      EACH 900.00 9,000.00 1,200.00 12,000.00 925.00 9,250.00 1,100.00 11,000.00
701-09-02 fabricating pipe fittings 18"x18"x15" 13      EACH 1,000.00 13,000.00 1,500.00 19,500.00 1,075.00 13,975.00 1,200.00 15,600.00
701-09-03 fabricating pipe fittings 24"x24"x15" 22      EACH 1,400.00 30,800.00 1,800.00 39,600.00 1,625.00 35,750.00 1,600.00 35,200.00
701-09-04 fabricating pipe fittings 30"x30"x15" 4      EACH 2,000.00 8,000.00 2,300.00 9,200.00 2,220.00 8,880.00 2,100.00 8,400.00
701-09-05 fabricating pipe fittings 30"x30"x18" 2      EACH 2,000.00 4,000.00 2,500.00 5,000.00 2,220.00 4,440.00 2,200.00 4,400.00
701-09-06 fabricating pipe fittings 36"x36"x24" 2      EACH 2,500.00 5,000.00 3,000.00 6,000.00 2,825.00 5,650.00 2,800.00 5,600.00
702-02-B manholes (r-cb-11) 8      EACH 4,500.00 36,000.00 4,800.00 38,400.00 3,000.00 24,000.00 4,200.00 33,600.00
702-03-A catch basins (cb-01) 37      EACH 2,000.00 74,000.00 2,200.00 81,400.00 2,525.00 93,425.00 2,250.00 83,250.00
702-03-B catch basins (cb-02) 1      EACH 4,000.00 4,000.00 4,500.00 4,500.00 4,300.00 4,300.00 3,800.00 3,800.00
702-03-C catch basins (cb-06) 39      EACH 4,500.00 175,500.00 3,400.00 132,600.00 3,000.00 117,000.00 3,250.00 126,750.00
702-03-D catch basins (cb-07) 22      EACH 5,500.00 121,000.00 4,800.00 105,600.00 4,200.00 92,400.00 4,750.00 104,500.00
702-03-I catch basins (cb-04) 93      EACH 1,400.00 130,200.00 1,700.00 158,100.00 1,450.00 134,850.00 1,400.00 130,200.00
705-02 combination mesh & barbed wire fence (6 foot) 102      LNFT 12.00 1,224.00 20.00 2,040.00 13.25 1,351.50 40.00 4,080.00
705-03 single swinging walk gates 5      EACH 600.00 3,000.00 400.00 2,000.00 535.00 2,675.00 750.00 3,750.00
705-05-A double swinging driveway gates 1      DBGT 1,000.00 1,000.00 1,000.00 1,000.00 925.00 925.00 1,500.00 1,500.00
705-06-A chain link fence (4-foot height) 608      LNFT 17.00 10,336.00 16.00 9,728.00 22.00 13,376.00 25.00 15,200.00
706-01-A concrete walk (4" thick) 5,510.9    SQYD 44.00 242,479.60 32.00 176,348.80 40.80 224,844.72 50.00 275,545.00
706-02-C concrete drive (6" thick) 4,786.7    SQYD 54.00 258,481.80 50.00 239,335.00 70.25 336,265.68 65.00 311,135.50
707-03 combination concrete curb & gutter 10,698.6    LNFT 25.00 267,465.00 30.00 320,958.00 27.60 295,281.36 35.00 374,451.00
708-01 right-of-way monument 29      EACH 180.00 5,220.00 125.00 3,625.00 125.00 3,625.00 500.00 14,500.00
713-01 temporary signs & barricades lump      LUMP 80,000.00 80,000.00 250,000.00 250,000.00 177,500.00 177,500.00 375,000.00 375,000.00
713-03-B temporary pavement markings (broken line)(4" width)
(10' length)
9.732  MILE 400.00 3,892.80 500.00 4,866.00 365.00 3,552.18 500.00 4,866.00
713-04-A temporary pavement markings (solid line)(4" width) 19.463  MILE 650.00 12,650.95 10.00 194.63 600.00 11,677.80 550.00 10,704.65
713-05-A temporary pavement legends and symbols (arrow) 20      EACH 60.00 1,200.00 25.00 500.00 55.00 1,100.00 50.00 1,000.00
722-01 project site laboratory 1      EACH 20,000.00 20,000.00 5,000.00 5,000.00 15,000.00 15,000.00 50,000.00 50,000.00
725-01 temporary detour roads 6,712.8    SQYD 65.00 436,332.00 85.00 570,588.00 60.80 408,138.24 90.00 604,152.00
726-01 bedding material 1,074.2    CUYD 90.00 96,678.00 100.00 107,420.00 110.00 118,162.00 85.00 91,307.00
727-01 mobilization lump      LUMP 675,000.00 675,000.00 250,000.00 250,000.00 515,000.00 515,000.00 900,000.00 900,000.00
731-02 reflectorized raised pavement markers 643      EACH 6.00 3,858.00 7.00 4,501.00 5.75 3,697.25 5.10 3,279.30
732-02-A plastic pavement striping (solid line) (4" width) 9.732  MILE 3,000.00 29,196.00 3,000.00 29,196.00 2,875.00 27,979.50 2,610.00 25,400.52
732-03-A plastic pavement striping (broken line)(4" width) 4.866  MILE 225.00 1,094.85 250.00 1,216.50 210.00 1,021.86 190.00 924.54
732-04-A plastic pavement legends & symbols (arrow) 22      EACH 200.00 4,400.00 250.00 5,500.00 195.00 4,290.00 175.00 3,850.00
735-01 mailboxes 37      EACH 10.00 370.00 1.00 37.00 6.00 222.00 5.00 185.00
735-02 mailbox supports (single) 37      EACH 130.00 4,810.00 150.00 5,550.00 125.00 4,625.00 125.00 4,625.00
739-01 hydro-seeding 3.00   ACRE 1,400.00 4,200.00 1,100.00 3,300.00 1,100.00 3,300.00 1,100.00 3,300.00
740-01 construction layout lump      LUMP 140,000.00 140,000.00 190,400.00 190,400.00 220,000.00 220,000.00 100,000.00 100,000.00
740-02 utility oversight and coordination lump      LUMP 175,000.00 175,000.00 250,000.00 250,000.00 67,000.00 67,000.00 400,000.00 400,000.00
S-001 rumble strips (ground-in) 5.6    MILE 1,000.00 5,600.00 1,500.00 8,400.00 1,235.00 6,916.00 1,500.00 8,400.00
S-002 tree trimming 1      EACH 4,000.00 4,000.00 5,000.00 5,000.00 7,500.00 7,500.00 6,000.00 6,000.00
                       
 ITEM TOTAL (CONSTRUCTION BID)       7,284,076.75   7,288,957.24   7,831,002.00   9,384,477.91
 NUMBER OF DAYS BID AT $2,000 PER DAY.       778,000.00   800,000.00   640,000.00   800,000.00
 TOTAL BID       8,062,076.75   8,088,957.24   8,471,002.00   10,184,477.91