| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - PHYLWAY CONSTRUCTION LLC |
- 2 - F.G. SULLIVAN, JR. CONTRACTOR LLC |
- 3 - BYRON E. TALBOT CONTRACTOR, INC. |
- 4 - COASTAL BRIDGE CO., L.L.C. |
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 201-01 |
clearing & grubbing
|
lump |
LUMP |
200,000.00 |
200,000.00 |
5,000.00 |
5,000.00 |
102,334.80 |
102,334.80 |
400,000.00 |
400,000.00 |
| 202-01 |
removal of structures & obstructions
|
lump |
LUMP |
100,000.00 |
100,000.00 |
29,000.00 |
29,000.00 |
138,100.00 |
138,100.00 |
125,000.00 |
125,000.00 |
| 202-02-D |
removal of concrete walks & drives
|
4,884   |
SQYD |
5.50 |
26,862.00 |
14.00 |
68,376.00 |
12.00 |
58,608.00 |
20.00 |
97,680.00 |
| 202-02-E |
removal of concrete curbs
|
619.0 |
LNFT |
12.00 |
7,428.00 |
5.00 |
3,095.00 |
1.50 |
928.50 |
25.00 |
15,475.00 |
| 202-02-G |
removal of surfacing & stabilized base
|
16,827.9 |
SQYD |
5.50 |
92,553.45 |
8.00 |
134,623.20 |
10.00 |
168,279.00 |
15.00 |
252,418.50 |
| 202-02-I |
removal of 6'x12' metal sign station 113+50 right
|
1   |
EACH |
300.00 |
300.00 |
300.00 |
300.00 |
2,000.00 |
2,000.00 |
1,500.00 |
1,500.00 |
| 202-02-J |
removal of 4.5'x4' wood sign station 115+00 left
|
1   |
EACH |
300.00 |
300.00 |
300.00 |
300.00 |
2,000.00 |
2,000.00 |
2,000.00 |
2,000.00 |
| 202-02-K |
removal of 6'x12' metal sign station 118+00 right
|
1   |
EACH |
300.00 |
300.00 |
300.00 |
300.00 |
2,000.00 |
2,000.00 |
2,500.00 |
2,500.00 |
| 202-02-01 |
removal of abandoned telephone cable (length 5500 ft.)
2-900pr,600pr,400pr avg. depth 24"(sta. 101) |
1   |
EACH |
7,000.00 |
7,000.00 |
17,000.00 |
17,000.00 |
55,000.00 |
55,000.00 |
30,000.00 |
30,000.00 |
| 202-02-02 |
removal of abandoned telephone cable (length 5500 ft.)
300pr avg. depth 24" (sta. 101) |
1   |
EACH |
7,000.00 |
7,000.00 |
17,000.00 |
17,000.00 |
16,000.00 |
16,000.00 |
30,000.00 |
30,000.00 |
| 202-02-03 |
removal of abandoned telephone cable (length 5500 ft.)
50pr avg. depth 24" |
1   |
EACH |
7,000.00 |
7,000.00 |
17,000.00 |
17,000.00 |
16,000.00 |
16,000.00 |
30,000.00 |
30,000.00 |
| 203-01 |
general excavation
|
10,191   |
CUYD |
10.00 |
101,910.00 |
10.00 |
101,910.00 |
11.00 |
112,101.00 |
10.00 |
101,910.00 |
| 203-02 |
drainage excavation
|
500   |
CUYD |
12.00 |
6,000.00 |
12.00 |
6,000.00 |
16.50 |
8,250.00 |
15.00 |
7,500.00 |
| 203-03 |
embankment
|
6,457   |
CUYD |
30.00 |
193,710.00 |
30.00 |
193,710.00 |
35.35 |
228,254.95 |
25.00 |
161,425.00 |
| 204-02 |
temporary hay or straw bales
|
150   |
EACH |
10.00 |
1,500.00 |
9.00 |
1,350.00 |
10.00 |
1,500.00 |
8.50 |
1,275.00 |
| 204-05-A |
temporary sediment check dams (hay)
|
50   |
EACH |
125.00 |
6,250.00 |
100.00 |
5,000.00 |
110.00 |
5,500.00 |
100.00 |
5,000.00 |
| 204-06 |
temporary silt fencing
|
8,000   |
LNFT |
2.50 |
20,000.00 |
1.45 |
11,600.00 |
3.10 |
24,800.00 |
1.35 |
10,800.00 |
| 302-01 |
class ii base course
|
8,029.4 |
CUYD |
110.00 |
883,234.00 |
90.00 |
722,646.00 |
111.07 |
891,825.46 |
120.00 |
963,528.00 |
| 304-01 |
lime
|
355.82 |
TON |
165.00 |
58,710.30 |
170.00 |
60,489.40 |
200.00 |
71,164.00 |
140.00 |
49,814.80 |
| 304-04-D |
lime treatment (type d) (12" thick)
|
25,102   |
SQYD |
1.75 |
43,928.50 |
2.00 |
50,204.00 |
2.00 |
50,204.00 |
2.50 |
62,755.00 |
| 402-01 |
traffic maintenance aggregate (vehicular measurement)
|
1,000.0 |
CUYD |
76.00 |
76,000.00 |
50.00 |
50,000.00 |
66.65 |
66,650.00 |
100.00 |
100,000.00 |
| 502-01 |
superpave asphaltic concrete
|
16,869.4 |
TON |
75.00 |
1,265,205.00 |
75.00 |
1,265,205.00 |
85.00 |
1,433,899.00 |
85.00 |
1,433,899.00 |
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
668.4 |
TON |
110.00 |
73,524.00 |
140.00 |
93,576.00 |
110.00 |
73,524.00 |
150.00 |
100,260.00 |
| 509-01 |
cold planing asphaltic pavement
|
36,697   |
SQYD |
2.50 |
91,742.50 |
2.00 |
73,394.00 |
2.25 |
82,568.25 |
2.15 |
78,898.55 |
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 1,529   |
CUYD |
5.00 |
- 7,645.00 |
0.01 |
- 15.29 |
11.00 |
- 16,819.00 |
1.00 |
- 1,529.00 |
| 510-01-B |
pavement patching (12" minimum thickness)
|
2,000   |
SQYD |
100.00 |
200,000.00 |
85.00 |
170,000.00 |
105.00 |
210,000.00 |
90.00 |
180,000.00 |
| 701-03-F |
storm drain pipe (15" rcp/pcp)
|
3,550   |
LNFT |
50.00 |
177,500.00 |
90.00 |
319,500.00 |
72.15 |
256,132.50 |
75.00 |
266,250.00 |
| 701-03-G |
storm drain pipe (18" rcp/pcp)
|
2,678   |
LNFT |
55.00 |
147,290.00 |
95.00 |
254,410.00 |
65.75 |
176,078.50 |
80.00 |
214,240.00 |
| 701-03-I |
storm drain pipe (24" rcp/pcp)
|
3,508   |
LNFT |
65.00 |
228,020.00 |
105.00 |
368,340.00 |
91.50 |
320,982.00 |
90.00 |
315,720.00 |
| 701-03-K |
storm drain pipe (30" rcp/pcp)
|
947   |
LNFT |
90.00 |
85,230.00 |
115.00 |
108,905.00 |
122.25 |
115,770.75 |
105.00 |
99,435.00 |
| 701-03-M |
storm drain pipe (36" rcp/pcp)
|
287   |
LNFT |
115.00 |
33,005.00 |
145.00 |
41,615.00 |
214.60 |
61,590.20 |
125.55 |
36,032.85 |
| 701-03-M/N-01 |
storm drain pipe (36" pcp or 42" cmp)(outfall)
|
12   |
LNFT |
180.00 |
2,160.00 |
150.00 |
1,800.00 |
475.00 |
5,700.00 |
125.55 |
1,506.60 |
| 701-03-N |
storm drain pipe (42" rcp/pcp)
|
88   |
LNFT |
190.00 |
16,720.00 |
210.00 |
18,480.00 |
250.00 |
22,000.00 |
175.20 |
15,417.60 |
| 701-03-O |
storm drain pipe (48" rcp/pcp)
|
88   |
LNFT |
200.00 |
17,600.00 |
230.00 |
20,240.00 |
260.00 |
22,880.00 |
198.50 |
17,468.00 |
| 701-03-O/P-01 |
storm drain pipe (48" pcp or 54" cmp)(outfall)
|
105   |
LNFT |
150.00 |
15,750.00 |
0.00 |
0.00 |
250.00 |
26,250.00 |
198.50 |
20,842.50 |
| 701-09-01 |
fabricating pipe fittings 15"x15"x15"
|
10   |
EACH |
900.00 |
9,000.00 |
1,200.00 |
12,000.00 |
925.00 |
9,250.00 |
1,100.00 |
11,000.00 |
| 701-09-02 |
fabricating pipe fittings 18"x18"x15"
|
13   |
EACH |
1,000.00 |
13,000.00 |
1,500.00 |
19,500.00 |
1,075.00 |
13,975.00 |
1,200.00 |
15,600.00 |
| 701-09-03 |
fabricating pipe fittings 24"x24"x15"
|
22   |
EACH |
1,400.00 |
30,800.00 |
1,800.00 |
39,600.00 |
1,625.00 |
35,750.00 |
1,600.00 |
35,200.00 |
| 701-09-04 |
fabricating pipe fittings 30"x30"x15"
|
4   |
EACH |
2,000.00 |
8,000.00 |
2,300.00 |
9,200.00 |
2,220.00 |
8,880.00 |
2,100.00 |
8,400.00 |
| 701-09-05 |
fabricating pipe fittings 30"x30"x18"
|
2   |
EACH |
2,000.00 |
4,000.00 |
2,500.00 |
5,000.00 |
2,220.00 |
4,440.00 |
2,200.00 |
4,400.00 |
| 701-09-06 |
fabricating pipe fittings 36"x36"x24"
|
2   |
EACH |
2,500.00 |
5,000.00 |
3,000.00 |
6,000.00 |
2,825.00 |
5,650.00 |
2,800.00 |
5,600.00 |
| 702-02-B |
manholes (r-cb-11)
|
8   |
EACH |
4,500.00 |
36,000.00 |
4,800.00 |
38,400.00 |
3,000.00 |
24,000.00 |
4,200.00 |
33,600.00 |
| 702-03-A |
catch basins (cb-01)
|
37   |
EACH |
2,000.00 |
74,000.00 |
2,200.00 |
81,400.00 |
2,525.00 |
93,425.00 |
2,250.00 |
83,250.00 |
| 702-03-B |
catch basins (cb-02)
|
1   |
EACH |
4,000.00 |
4,000.00 |
4,500.00 |
4,500.00 |
4,300.00 |
4,300.00 |
3,800.00 |
3,800.00 |
| 702-03-C |
catch basins (cb-06)
|
39   |
EACH |
4,500.00 |
175,500.00 |
3,400.00 |
132,600.00 |
3,000.00 |
117,000.00 |
3,250.00 |
126,750.00 |
| 702-03-D |
catch basins (cb-07)
|
22   |
EACH |
5,500.00 |
121,000.00 |
4,800.00 |
105,600.00 |
4,200.00 |
92,400.00 |
4,750.00 |
104,500.00 |
| 702-03-I |
catch basins (cb-04)
|
93   |
EACH |
1,400.00 |
130,200.00 |
1,700.00 |
158,100.00 |
1,450.00 |
134,850.00 |
1,400.00 |
130,200.00 |
| 705-02 |
combination mesh & barbed wire fence (6 foot)
|
102   |
LNFT |
12.00 |
1,224.00 |
20.00 |
2,040.00 |
13.25 |
1,351.50 |
40.00 |
4,080.00 |
| 705-03 |
single swinging walk gates
|
5   |
EACH |
600.00 |
3,000.00 |
400.00 |
2,000.00 |
535.00 |
2,675.00 |
750.00 |
3,750.00 |
| 705-05-A |
double swinging driveway gates
|
1   |
DBGT |
1,000.00 |
1,000.00 |
1,000.00 |
1,000.00 |
925.00 |
925.00 |
1,500.00 |
1,500.00 |
| 705-06-A |
chain link fence (4-foot height)
|
608   |
LNFT |
17.00 |
10,336.00 |
16.00 |
9,728.00 |
22.00 |
13,376.00 |
25.00 |
15,200.00 |
| 706-01-A |
concrete walk (4" thick)
|
5,510.9 |
SQYD |
44.00 |
242,479.60 |
32.00 |
176,348.80 |
40.80 |
224,844.72 |
50.00 |
275,545.00 |
| 706-02-C |
concrete drive (6" thick)
|
4,786.7 |
SQYD |
54.00 |
258,481.80 |
50.00 |
239,335.00 |
70.25 |
336,265.68 |
65.00 |
311,135.50 |
| 707-03 |
combination concrete curb & gutter
|
10,698.6 |
LNFT |
25.00 |
267,465.00 |
30.00 |
320,958.00 |
27.60 |
295,281.36 |
35.00 |
374,451.00 |
| 708-01 |
right-of-way monument
|
29   |
EACH |
180.00 |
5,220.00 |
125.00 |
3,625.00 |
125.00 |
3,625.00 |
500.00 |
14,500.00 |
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
80,000.00 |
80,000.00 |
250,000.00 |
250,000.00 |
177,500.00 |
177,500.00 |
375,000.00 |
375,000.00 |
| 713-03-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
9.732 |
MILE |
400.00 |
3,892.80 |
500.00 |
4,866.00 |
365.00 |
3,552.18 |
500.00 |
4,866.00 |
| 713-04-A |
temporary pavement markings (solid line)(4" width)
|
19.463 |
MILE |
650.00 |
12,650.95 |
10.00 |
194.63 |
600.00 |
11,677.80 |
550.00 |
10,704.65 |
| 713-05-A |
temporary pavement legends and symbols (arrow)
|
20   |
EACH |
60.00 |
1,200.00 |
25.00 |
500.00 |
55.00 |
1,100.00 |
50.00 |
1,000.00 |
| 722-01 |
project site laboratory
|
1   |
EACH |
20,000.00 |
20,000.00 |
5,000.00 |
5,000.00 |
15,000.00 |
15,000.00 |
50,000.00 |
50,000.00 |
| 725-01 |
temporary detour roads
|
6,712.8 |
SQYD |
65.00 |
436,332.00 |
85.00 |
570,588.00 |
60.80 |
408,138.24 |
90.00 |
604,152.00 |
| 726-01 |
bedding material
|
1,074.2 |
CUYD |
90.00 |
96,678.00 |
100.00 |
107,420.00 |
110.00 |
118,162.00 |
85.00 |
91,307.00 |
| 727-01 |
mobilization
|
lump |
LUMP |
675,000.00 |
675,000.00 |
250,000.00 |
250,000.00 |
515,000.00 |
515,000.00 |
900,000.00 |
900,000.00 |
| 731-02 |
reflectorized raised pavement markers
|
643   |
EACH |
6.00 |
3,858.00 |
7.00 |
4,501.00 |
5.75 |
3,697.25 |
5.10 |
3,279.30 |
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
9.732 |
MILE |
3,000.00 |
29,196.00 |
3,000.00 |
29,196.00 |
2,875.00 |
27,979.50 |
2,610.00 |
25,400.52 |
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
4.866 |
MILE |
225.00 |
1,094.85 |
250.00 |
1,216.50 |
210.00 |
1,021.86 |
190.00 |
924.54 |
| 732-04-A |
plastic pavement legends & symbols (arrow)
|
22   |
EACH |
200.00 |
4,400.00 |
250.00 |
5,500.00 |
195.00 |
4,290.00 |
175.00 |
3,850.00 |
| 735-01 |
mailboxes
|
37   |
EACH |
10.00 |
370.00 |
1.00 |
37.00 |
6.00 |
222.00 |
5.00 |
185.00 |
| 735-02 |
mailbox supports (single)
|
37   |
EACH |
130.00 |
4,810.00 |
150.00 |
5,550.00 |
125.00 |
4,625.00 |
125.00 |
4,625.00 |
| 739-01 |
hydro-seeding
|
3.00 |
ACRE |
1,400.00 |
4,200.00 |
1,100.00 |
3,300.00 |
1,100.00 |
3,300.00 |
1,100.00 |
3,300.00 |
| 740-01 |
construction layout
|
lump |
LUMP |
140,000.00 |
140,000.00 |
190,400.00 |
190,400.00 |
220,000.00 |
220,000.00 |
100,000.00 |
100,000.00 |
| 740-02 |
utility oversight and coordination
|
lump |
LUMP |
175,000.00 |
175,000.00 |
250,000.00 |
250,000.00 |
67,000.00 |
67,000.00 |
400,000.00 |
400,000.00 |
| S-001 |
rumble strips (ground-in)
|
5.6 |
MILE |
1,000.00 |
5,600.00 |
1,500.00 |
8,400.00 |
1,235.00 |
6,916.00 |
1,500.00 |
8,400.00 |
| S-002 |
tree trimming
|
1   |
EACH |
4,000.00 |
4,000.00 |
5,000.00 |
5,000.00 |
7,500.00 |
7,500.00 |
6,000.00 |
6,000.00 |
| |
|
|
|
|
|
|
|
|
|
|
|
| | ITEM TOTAL (CONSTRUCTION BID) |
|
|
|
7,284,076.75 |
|
7,288,957.24 |
|
7,831,002.00 |
|
9,384,477.91 |
| | NUMBER OF DAYS BID AT $2,000 PER DAY. |
|
|
|
778,000.00 |
|
800,000.00 |
|
640,000.00 |
|
800,000.00 |
| | TOTAL BID |
|
|
|
8,062,076.75 |
|
8,088,957.24 |
|
8,471,002.00 |
|
10,184,477.91 |
|