| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - DIAMOND B CONSTRUCTION CO., L.L.C. |
- 2 - GILCHRIST CONSTRUCTION CO. LLC |
- 3 - D & J CONSTRUCTION CO., INC. |
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-02-D |
removal of concrete walks & drives
|
3   |
SQYD |
100.00 |
300.00 |
155.00 |
465.00 |
50.00 |
150.00 |
|
|
| 203-07-A |
borrow (vehicular meas.) (selected soils)
|
100   |
CUYD |
30.00 |
3,000.00 |
25.00 |
2,500.00 |
15.00 |
1,500.00 |
|
|
| 304-01 |
lime
|
146.11 |
TON |
150.00 |
21,916.50 |
140.00 |
20,455.40 |
152.00 |
22,208.72 |
|
|
| 304-04-D |
lime treatment (type d) (12" thick)
|
9,277   |
SQYD |
2.85 |
26,439.45 |
1.20 |
11,132.40 |
4.60 |
42,674.20 |
|
|
| 308-01-A |
in-place cement treated base course (12" thick)
|
9,277   |
SQYD |
9.25 |
85,812.25 |
7.80 |
72,360.60 |
7.50 |
69,577.50 |
|
|
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
3,148   |
CUYD |
87.00 |
273,876.00 |
75.00 |
236,100.00 |
50.00 |
157,400.00 |
|
|
| 502-01 |
superpave asphaltic concrete
|
9,891.1 |
TON |
78.00 |
771,505.80 |
80.00 |
791,288.00 |
82.00 |
811,070.20 |
|
|
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
2,172.8 |
TON |
120.00 |
260,736.00 |
135.00 |
293,328.00 |
82.00 |
178,169.60 |
|
|
| 507-01-A |
asphaltic material (crs-2p cold applied emulsion)
|
41,838   |
GAL |
2.50 |
104,595.00 |
2.80 |
117,146.40 |
2.15 |
89,951.70 |
|
|
| 507-02-B |
aggregate (s2)
|
61,527   |
SQYD |
1.25 |
76,908.75 |
1.35 |
83,061.45 |
1.85 |
113,824.95 |
|
|
| 507-02-C |
aggregate (s3)
|
61,527   |
SQYD |
1.00 |
61,527.00 |
1.10 |
67,679.70 |
1.85 |
113,824.95 |
|
|
| 509-01 |
cold planing asphaltic pavement
|
8,873   |
SQYD |
4.00 |
35,492.00 |
2.27 |
20,141.71 |
2.35 |
20,851.55 |
|
|
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 742   |
CUYD |
0.10 |
- 74.20 |
0.01 |
- 7.42 |
0.01 |
- 7.42 |
|
|
| 510-01-B |
pavement patching (12" minimum thickness)
|
140   |
SQYD |
155.00 |
21,700.00 |
199.00 |
27,860.00 |
200.00 |
28,000.00 |
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
12,000.00 |
12,000.00 |
1,500.00 |
1,500.00 |
75,000.00 |
75,000.00 |
|
|
| 713-03-A |
temporary pavement markings (broken line) (4" width)
(4' length) |
6.830 |
MILE |
450.00 |
3,073.50 |
450.00 |
3,073.50 |
226.00 |
1,543.58 |
|
|
| 713-03-B |
temporary pavement markings (broken line) (4" width)
(10' length) |
11.199 |
MILE |
300.00 |
3,359.70 |
1.00 |
11.20 |
300.00 |
3,359.70 |
|
|
| 713-04-A |
temporary pavement markings (solid line) (4" width)
|
28.485 |
MILE |
450.00 |
12,818.25 |
1.00 |
28.49 |
1.00 |
28.49 |
|
|
| 713-06-A |
temporary reflectorized raised pavement markers (tabs)
|
2,520   |
EACH |
1.00 |
2,520.00 |
1.68 |
4,233.60 |
1.50 |
3,780.00 |
|
|
| 722-01 |
project site laboratory
|
1   |
EACH |
3,500.00 |
3,500.00 |
10,000.00 |
10,000.00 |
10,000.00 |
10,000.00 |
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
79,000.00 |
79,000.00 |
90,000.00 |
90,000.00 |
155,000.00 |
155,000.00 |
|
|
| 731-02 |
reflectorized raised pavement markers
|
720   |
EACH |
5.00 |
3,600.00 |
5.75 |
4,140.00 |
6.00 |
4,320.00 |
|
|
| 732-01-E |
plastic pavement striping (24" width)
|
18   |
LNFT |
3.50 |
63.00 |
4.50 |
81.00 |
22.00 |
396.00 |
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
24.883 |
MILE |
2,400.00 |
59,719.20 |
2,700.00 |
67,184.10 |
2,000.00 |
49,766.00 |
|
|
| 732-03-A |
plastic pavement striping (broken line) (4" width)
|
9.824 |
MILE |
750.00 |
7,368.00 |
900.00 |
8,841.60 |
1,000.00 |
9,824.00 |
|
|
| 735-01 |
mailboxes
|
112   |
EACH |
1.00 |
112.00 |
10.00 |
1,120.00 |
13.00 |
1,456.00 |
|
|
| 735-02 |
mailbox supports (single)
|
93   |
EACH |
125.00 |
11,625.00 |
130.00 |
12,090.00 |
140.00 |
13,020.00 |
|
|
| 735-03 |
mailbox supports (double)
|
4   |
EACH |
160.00 |
640.00 |
180.00 |
720.00 |
250.00 |
1,000.00 |
|
|
| 735-04 |
mailbox supports (multiple)
|
4   |
EACH |
250.00 |
1,000.00 |
255.00 |
1,020.00 |
325.00 |
1,300.00 |
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
6,500.00 |
6,500.00 |
10,000.00 |
10,000.00 |
20,000.00 |
20,000.00 |
|
|
| S-001 |
saw cutting
|
2,000   |
inft |
2.25 |
4,500.00 |
3.70 |
7,400.00 |
2.00 |
4,000.00 |
|
|
| S-002 |
surface preparation
|
lump |
LUMP |
27,000.00 |
27,000.00 |
25,000.00 |
25,000.00 |
75,000.00 |
75,000.00 |
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
1,982,133.20 |
|
1,989,954.73 |
|
2,077,989.72 |
|
|
|