Letting of 7/25/2007 LA DOTD Headquarters


 
go back
Go Back
DBE GOAL FED
Lead Project: 315-03-0007
Parish: UNION
Routes: LA 143
Description: OUACHITA PARISH LINE - JCT. LA 2
Type Const: grading, drainage structures, in-place cement treated bc, cold planing asph pvmt,
superpave asph conc ovly and related work.
Estimated Construction Cost: $3,638,412.01
 
RankLicenseBidderConstruction Bid
1 05789 D & J CONSTRUCTION CO., INC. $2,894,986.26
2 12487 DIAMOND B CONSTRUCTION CO., L.L.C. $3,145,175.30
 
Item Number Item Description Quantity Unit of Measure - 1 -
D & J CONSTRUCTION CO., INC.
- 2 -
DIAMOND B CONSTRUCTION CO., L.L.C.

 

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
202-01 removal of structures & obstructions lump      LUMP 3,000.00 3,000.00 3,000.00 3,000.00        
202-02-D removal of concrete walks & drives 46      SQYD 25.00 1,150.00 33.00 1,518.00        
203-07 borrow (vehicular measurement) 816      CUYD 20.00 16,320.00 27.00 22,032.00        
203-07-A borrow (vehicular meas.)(selected soils) 3,134      CUYD 9.50 29,773.00 14.00 43,876.00        
308-01-A in-place cement treated base course (12" thick) 106,836      SQYD 7.50 801,270.00 7.75 827,979.00        
401-02 aggregate surface course (adjusted vehicular
measurement)
1,166      CUYD 20.00 23,320.00 48.00 55,968.00        
402-01 traffic maintenance aggregate (vehicular measurement) 703.6    CUYD 10.00 7,036.00 25.00 17,590.00        
502-01 superpave asphaltic concrete 20,176.4    TON 78.00 1,573,759.20 78.00 1,573,759.20        
502-01-A superpave asphaltic concrete, drives, turnouts and
miscellaneous
357.8    TON 130.00 46,514.00 190.00 67,982.00        
509-01 cold planing asphaltic pavement 97,483      SQYD 1.20 116,979.60 1.50 146,224.50        
509-02 contractor retained reclaimed asphaltic pavement - 2,724      CUYD 0.01 - 27.24 0.10 - 272.40        
701-01-I cross drain pipe (24" rcp/pcp) 56      LNFT 151.00 8,456.00 165.00 9,240.00        
701-08 relaying pipe 21      LNFT 151.00 3,171.00 165.00 3,465.00        
701-10-G reinforced concrete pipe (extension)(18") 8      LNFT 151.00 1,208.00 165.00 1,320.00        
701-10-I reinforced concrete pipe (extension)(24") 24      LNFT 151.00 3,624.00 165.00 3,960.00        
701-10-K reinforced concrete pipe (extension)(30") 8      LNFT 180.00 1,440.00 195.00 1,560.00        
701-14 cleaning existing pipes 35      LNFT 31.00 1,085.00 33.00 1,155.00        
701-15 concrete collar 12      EACH 750.00 9,000.00 660.00 7,920.00        
706-02-C concrete drive (6" thick) 40.0    SQYD 61.00 2,440.00 66.00 2,640.00        
712-02 sacked concrete revetment 44      SQYD 91.00 4,004.00 100.00 4,400.00        
713-01 temporary signs & barricades lump      LUMP 24,000.00 24,000.00 23,000.00 23,000.00        
713-03-A temporary pavement markings (broken line)(4" width)(4'
length)
13.720  MILE 225.00 3,087.00 600.00 8,232.00        
713-03-B temporary pavement markings (broken line)(4" width)
(10' length)
5.774  MILE 250.00 1,443.50 350.00 2,020.90        
713-04-A temporary pavement markings (solid line)(4" width) 47.500  MILE 1.00 47.50 600.00 28,500.00        
716-01-A mulch (vegetative) 27.0    TON 602.00 16,254.00 600.00 16,200.00        
717-01 seeding 599      LB 10.00 5,990.00 10.00 5,990.00        
718-01 fertilizer 13,300      LB 0.50 6,650.00 0.30 3,990.00        
726-01 bedding material 38.0    CUYD 86.00 3,268.00 95.00 3,610.00        
727-01 mobilization lump      LUMP 50,000.00 50,000.00 118,000.00 118,000.00        
729-16-B object marker assembly (type 2) 7      EACH 75.00 525.00 80.00 560.00        
731-02 reflectorized raised pavement markers 907      EACH 7.00 6,349.00 5.00 4,535.00        
732-02-A plastic pavement striping (solid line) (4" width) 23.750  MILE 2,100.00 49,875.00 2,350.00 55,812.50        
732-03-A plastic pavement striping (broken line)(4" width) 2.887  MILE 1,100.00 3,175.70 800.00 2,309.60        
735-01 mailboxes 74      EACH 1.00 74.00 1.00 74.00        
735-02 mailbox supports (single) 34      EACH 125.00 4,250.00 125.00 4,250.00        
735-03 mailbox supports (double) 16      EACH 175.00 2,800.00 175.00 2,800.00        
735-04 mailbox supports (multiple) 3      EACH 325.00 975.00 325.00 975.00        
740-01 construction layout lump      LUMP 16,500.00 16,500.00 20,000.00 20,000.00        
S-001 tree trimming lump      LUMP 39,000.00 39,000.00 40,000.00 40,000.00        
S-002 cleaning existing ditches 600      LNFT 12.00 7,200.00 15.00 9,000.00        
                       
 CONTRACTOR TOTAL       2,894,986.26   3,145,175.30        