| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - D & J CONSTRUCTION CO., INC. |
- 2 - DIAMOND B CONSTRUCTION CO., L.L.C. |
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-01 |
removal of structures & obstructions
|
lump |
LUMP |
3,000.00 |
3,000.00 |
3,000.00 |
3,000.00 |
|
|
|
|
| 202-02-D |
removal of concrete walks & drives
|
46   |
SQYD |
25.00 |
1,150.00 |
33.00 |
1,518.00 |
|
|
|
|
| 203-07 |
borrow (vehicular measurement)
|
816   |
CUYD |
20.00 |
16,320.00 |
27.00 |
22,032.00 |
|
|
|
|
| 203-07-A |
borrow (vehicular meas.)(selected soils)
|
3,134   |
CUYD |
9.50 |
29,773.00 |
14.00 |
43,876.00 |
|
|
|
|
| 308-01-A |
in-place cement treated base course (12" thick)
|
106,836   |
SQYD |
7.50 |
801,270.00 |
7.75 |
827,979.00 |
|
|
|
|
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
1,166   |
CUYD |
20.00 |
23,320.00 |
48.00 |
55,968.00 |
|
|
|
|
| 402-01 |
traffic maintenance aggregate (vehicular measurement)
|
703.6 |
CUYD |
10.00 |
7,036.00 |
25.00 |
17,590.00 |
|
|
|
|
| 502-01 |
superpave asphaltic concrete
|
20,176.4 |
TON |
78.00 |
1,573,759.20 |
78.00 |
1,573,759.20 |
|
|
|
|
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
357.8 |
TON |
130.00 |
46,514.00 |
190.00 |
67,982.00 |
|
|
|
|
| 509-01 |
cold planing asphaltic pavement
|
97,483   |
SQYD |
1.20 |
116,979.60 |
1.50 |
146,224.50 |
|
|
|
|
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 2,724   |
CUYD |
0.01 |
- 27.24 |
0.10 |
- 272.40 |
|
|
|
|
| 701-01-I |
cross drain pipe (24" rcp/pcp)
|
56   |
LNFT |
151.00 |
8,456.00 |
165.00 |
9,240.00 |
|
|
|
|
| 701-08 |
relaying pipe
|
21   |
LNFT |
151.00 |
3,171.00 |
165.00 |
3,465.00 |
|
|
|
|
| 701-10-G |
reinforced concrete pipe (extension)(18")
|
8   |
LNFT |
151.00 |
1,208.00 |
165.00 |
1,320.00 |
|
|
|
|
| 701-10-I |
reinforced concrete pipe (extension)(24")
|
24   |
LNFT |
151.00 |
3,624.00 |
165.00 |
3,960.00 |
|
|
|
|
| 701-10-K |
reinforced concrete pipe (extension)(30")
|
8   |
LNFT |
180.00 |
1,440.00 |
195.00 |
1,560.00 |
|
|
|
|
| 701-14 |
cleaning existing pipes
|
35   |
LNFT |
31.00 |
1,085.00 |
33.00 |
1,155.00 |
|
|
|
|
| 701-15 |
concrete collar
|
12   |
EACH |
750.00 |
9,000.00 |
660.00 |
7,920.00 |
|
|
|
|
| 706-02-C |
concrete drive (6" thick)
|
40.0 |
SQYD |
61.00 |
2,440.00 |
66.00 |
2,640.00 |
|
|
|
|
| 712-02 |
sacked concrete revetment
|
44   |
SQYD |
91.00 |
4,004.00 |
100.00 |
4,400.00 |
|
|
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
24,000.00 |
24,000.00 |
23,000.00 |
23,000.00 |
|
|
|
|
| 713-03-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
13.720 |
MILE |
225.00 |
3,087.00 |
600.00 |
8,232.00 |
|
|
|
|
| 713-03-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
5.774 |
MILE |
250.00 |
1,443.50 |
350.00 |
2,020.90 |
|
|
|
|
| 713-04-A |
temporary pavement markings (solid line)(4" width)
|
47.500 |
MILE |
1.00 |
47.50 |
600.00 |
28,500.00 |
|
|
|
|
| 716-01-A |
mulch (vegetative)
|
27.0 |
TON |
602.00 |
16,254.00 |
600.00 |
16,200.00 |
|
|
|
|
| 717-01 |
seeding
|
599   |
LB |
10.00 |
5,990.00 |
10.00 |
5,990.00 |
|
|
|
|
| 718-01 |
fertilizer
|
13,300   |
LB |
0.50 |
6,650.00 |
0.30 |
3,990.00 |
|
|
|
|
| 726-01 |
bedding material
|
38.0 |
CUYD |
86.00 |
3,268.00 |
95.00 |
3,610.00 |
|
|
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
50,000.00 |
50,000.00 |
118,000.00 |
118,000.00 |
|
|
|
|
| 729-16-B |
object marker assembly (type 2)
|
7   |
EACH |
75.00 |
525.00 |
80.00 |
560.00 |
|
|
|
|
| 731-02 |
reflectorized raised pavement markers
|
907   |
EACH |
7.00 |
6,349.00 |
5.00 |
4,535.00 |
|
|
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
23.750 |
MILE |
2,100.00 |
49,875.00 |
2,350.00 |
55,812.50 |
|
|
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
2.887 |
MILE |
1,100.00 |
3,175.70 |
800.00 |
2,309.60 |
|
|
|
|
| 735-01 |
mailboxes
|
74   |
EACH |
1.00 |
74.00 |
1.00 |
74.00 |
|
|
|
|
| 735-02 |
mailbox supports (single)
|
34   |
EACH |
125.00 |
4,250.00 |
125.00 |
4,250.00 |
|
|
|
|
| 735-03 |
mailbox supports (double)
|
16   |
EACH |
175.00 |
2,800.00 |
175.00 |
2,800.00 |
|
|
|
|
| 735-04 |
mailbox supports (multiple)
|
3   |
EACH |
325.00 |
975.00 |
325.00 |
975.00 |
|
|
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
16,500.00 |
16,500.00 |
20,000.00 |
20,000.00 |
|
|
|
|
| S-001 |
tree trimming
|
lump |
LUMP |
39,000.00 |
39,000.00 |
40,000.00 |
40,000.00 |
|
|
|
|
| S-002 |
cleaning existing ditches
|
600   |
LNFT |
12.00 |
7,200.00 |
15.00 |
9,000.00 |
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
2,894,986.26 |
|
3,145,175.30 |
|
|
|
|
|