Letting of 7/25/2007 LA DOTD Headquarters


 
go back
Go Back
DBE GOAL FED
Lead Project: 836-08-0072
Parish: ORLEANS
Routes: LA 407
Description: ALGIERS CUT OFF CANAL BRIDGE LIGHTING INSTALLATION
Type Const: roadway lighting and related work.
Estimated Construction Cost: $582,692.10
 
RankLicenseBidderConstruction Bid
1 27043 JACK B. HARPER CONTRACTOR, INC. $888,750.00
2 08470 DIAMOND ELECTRICAL CO., INC. $1,010,451.50
 
Item Number Item Description Quantity Unit of Measure - 1 -
JACK B. HARPER CONTRACTOR, INC.
- 2 -
DIAMOND ELECTRICAL CO., INC.

 

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
713-01 temporary signs & barricades lump      LUMP 55,250.00 55,250.00 66,500.00 66,500.00        
727-01 mobilization lump      LUMP 42,900.00 42,900.00 37,100.00 37,100.00        
730-01 trenching and backfilling 940      LNFT 5.85 5,499.00 3.20 3,008.00        
730-02-A conduit with conductors (2" galvanized rigid steel;
3#1)
240      LNFT 30.00 7,200.00 23.65 5,676.00        
730-02-B conduit with conductors (2" schedule 40 pvc; 3#1) 400      LNFT 16.25 6,500.00 10.55 4,220.00        
730-02-C conduit with conductors (2" schedule 40 pvc; 2#2, 2#4,
2#6, 2#8, 1#2 bare)
200      LNFT 23.35 4,670.00 18.65 3,730.00        
730-02-D conduit with conductors (2" rigid aluminum conduit;
2#2, 2#4, 2#6, 2#8, 1#2 green)
810      LNFT 35.00 28,350.00 44.25 35,842.50        
730-02-E conduit with conductors (2" rigid aluminum conduit;
2#2, 2#4, 2#6, 1#2 green)
1,600      LNFT 31.25 50,000.00 39.25 62,800.00        
730-02-F conduit with conductors (2" rigid aluminum conduit;
2#2, 2#4, 1#2 green)
1,760      LNFT 27.65 48,664.00 34.00 59,840.00        
730-02-G conduit with conductors (2" rigid aluminum conduit;
2#2, 1#2 green)
1,760      LNFT 24.25 42,680.00 27.40 48,224.00        
730-02-H conduit with conductors (1-1/4" schedule 40 pvc; 2#8,
1#8 bare)
740      LNFT 8.00 5,920.00 5.05 3,737.00        
730-02-I conduit with conductors (2" schedule 40 pvc; 2#2, 2#4,
2#6, 1#2 bare)
150      LNFT 20.80 3,120.00 20.90 3,135.00        
730-04 jacked or bored casing (6" schedule 80 pvc conduit) 200      LNFT 48.75 9,750.00 67.70 13,540.00        
730-05-A light pole (steel, twin, 8 ft truss arm, 40 ft
mounting height, structure mounted)
39      EACH 4,030.00 157,170.00 3,670.00 143,130.00        
730-05-B light pole (steel, single, 4 ft truss arm, 40 ft
mounting height, ground mounted)
6      EACH 4,322.50 25,935.00 5,085.00 30,510.00        
730-07-A luminaire (250 w, hps, type ii, med., semi-cutoff
dist., dbl. fuse ass., with lamp)
84      EACH 500.50 42,042.00 390.00 32,760.00        
730-08 electrical service point (pedestal) 2      EACH 7,475.00 14,950.00 8,050.00 16,100.00        
730-16-A underground junction box (12" x 12") 6      EACH 305.50 1,833.00 565.00 3,390.00        
730-16-B underground junction box (13" x 24") 8      EACH 507.00 4,056.00 910.00 7,280.00        
730-18 service pole (45', wood) 2      EACH 780.00 1,560.00 2,720.00 5,440.00        
740-01 construction layout lump      LUMP 5,850.00 5,850.00 2,010.00 2,010.00        
S-001 modular breakaway cable system (low mast) 6      EACH 2,957.50 17,745.00 1,930.00 11,580.00        
S-002 underground duct marker (concrete) 9      EACH 169.00 1,521.00 225.00 2,025.00        
S-003 marker tape (underground) 1,490      LNFT 2.50 3,725.00 0.60 894.00        
S-004 service meter disconnecting device (safety switch) 2      EACH 1,365.00 2,730.00 1,190.00 2,380.00        
S-101 removal of concrete railing (barrier) 507      LNFT 260.00 131,820.00 280.00 141,960.00        
S-102 new concrete railing (barrier) 507      LNFT 330.00 167,310.00 520.00 263,640.00        
                       
 CONTRACTOR TOTAL       888,750.00   1,010,451.50        