| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - BARRIERE CONSTRUCTION CO., LLC |
- 2 - F.G. SULLIVAN, JR. CONTRACTOR LLC |
- 3 - BARBER BROS. CONTRACTING CO., L.L.C |
- 4 - COASTAL BRIDGE CO., L.L.C. |
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-01 |
removal of structures & obstructions
|
lump |
LUMP |
5,000.00 |
5,000.00 |
1,000.00 |
1,000.00 |
20,000.00 |
20,000.00 |
50,000.00 |
50,000.00 |
| 202-02-H |
removal of guard rail
|
724   |
LNFT |
5.00 |
3,620.00 |
8.00 |
5,792.00 |
10.00 |
7,240.00 |
10.00 |
7,240.00 |
| 203-07 |
borrow (vehicular measurement)
|
1,933   |
CUYD |
10.00 |
19,330.00 |
10.00 |
19,330.00 |
30.00 |
57,990.00 |
1.00 |
1,933.00 |
| 204-06 |
temporary silt fencing
|
3,665   |
LNFT |
1.00 |
3,665.00 |
1.25 |
4,581.25 |
1.50 |
5,497.50 |
1.50 |
5,497.50 |
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
2,967   |
CUYD |
50.00 |
148,350.00 |
20.00 |
59,340.00 |
55.00 |
163,185.00 |
40.00 |
118,680.00 |
| 502-01 |
superpave asphaltic concrete
|
15,710.6 |
TON |
73.00 |
1,146,873.80 |
65.00 |
1,021,189.00 |
70.00 |
1,099,742.00 |
75.00 |
1,178,295.00 |
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
1,908.7 |
TON |
73.00 |
139,335.10 |
100.00 |
190,870.00 |
100.00 |
190,870.00 |
1.00 |
1,908.70 |
| 509-01-A |
cold planing asphaltic pavement (1.5" average depth)
|
1,934   |
SQYD |
2.00 |
3,868.00 |
6.00 |
11,604.00 |
3.00 |
5,802.00 |
3.00 |
5,802.00 |
| 509-01-B |
cold planing asphaltic pavement (2" average depth)
|
78,541   |
SQYD |
2.25 |
176,717.25 |
2.15 |
168,863.15 |
2.00 |
157,082.00 |
4.10 |
322,018.10 |
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 3,999   |
CUYD |
10.00 |
- 39,990.00 |
0.01 |
- 39.99 |
0.00 |
0.00 |
1.00 |
- 3,999.00 |
| 510-01-B |
pavement patching (12" minimum thickness)
|
1,984   |
SQYD |
40.00 |
79,360.00 |
100.00 |
198,400.00 |
65.00 |
128,960.00 |
95.00 |
188,480.00 |
| 602-02-A |
cleaning and resealing existing longitudinal pavement
joints |
4,236   |
LNFT |
1.25 |
5,295.00 |
1.00 |
4,236.00 |
1.50 |
6,354.00 |
1.25 |
5,295.00 |
| 602-02-B |
cleaning and resealing existing transverse pavement
joints |
1,562   |
LNFT |
1.50 |
2,343.00 |
2.00 |
3,124.00 |
2.00 |
3,124.00 |
1.50 |
2,343.00 |
| 602-03 |
cleaning and sealing random cracks
|
150   |
LNFT |
3.50 |
525.00 |
4.00 |
600.00 |
5.00 |
750.00 |
3.50 |
525.00 |
| 701-02-E |
cross drain pipe arch (30" equiv. rcpa)
|
48   |
LNFT |
120.00 |
5,760.00 |
165.00 |
7,920.00 |
160.00 |
7,680.00 |
130.00 |
6,240.00 |
| 704-01-A |
guard rail (single thrie beam) (3'-1 1/2" post spacing)
|
18.9 |
LNFT |
50.00 |
945.00 |
0.01 |
0.19 |
0.01 |
0.19 |
0.01 |
0.19 |
| 704-01-B |
guard rail (single thrie beam)(6'-3" post spa.)
|
120.0 |
LNFT |
50.00 |
6,000.00 |
35.00 |
4,200.00 |
36.00 |
4,320.00 |
31.00 |
3,720.00 |
| 704-03 |
blocked out guard rail
|
518.8 |
LNFT |
20.00 |
10,376.00 |
20.00 |
10,376.00 |
20.00 |
10,376.00 |
17.50 |
9,079.00 |
| 704-08-B |
guard rail transitions (double thrie beam)
|
175.1 |
LNFT |
60.00 |
10,506.00 |
60.00 |
10,506.00 |
65.00 |
11,381.50 |
53.00 |
9,280.30 |
| 704-10 |
guard rail anchor block
|
4   |
EACH |
2,000.00 |
8,000.00 |
1,400.00 |
5,600.00 |
1,500.00 |
6,000.00 |
1,250.00 |
5,000.00 |
| 704-11-B |
guard rail end treatment (tangent)
|
5   |
EACH |
2,250.00 |
11,250.00 |
2,600.00 |
13,000.00 |
3,000.00 |
15,000.00 |
2,300.00 |
11,500.00 |
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
100,000.00 |
100,000.00 |
112,000.00 |
112,000.00 |
75,000.00 |
75,000.00 |
80,000.00 |
80,000.00 |
| 713-02-C |
temporary pavement markings (8" width)
|
200   |
LNFT |
0.10 |
20.00 |
0.20 |
40.00 |
0.50 |
100.00 |
0.30 |
60.00 |
| 713-02-E |
temporary pavement markings (24" width)
|
700   |
LNFT |
0.10 |
70.00 |
0.50 |
350.00 |
1.50 |
1,050.00 |
0.90 |
630.00 |
| 713-03-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
20.820 |
MILE |
200.00 |
4,164.00 |
500.00 |
10,410.00 |
200.00 |
4,164.00 |
400.00 |
8,328.00 |
| 713-03-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
18.531 |
MILE |
10.00 |
185.31 |
10.00 |
185.31 |
300.00 |
5,559.30 |
275.00 |
5,096.03 |
| 713-04-A |
temporary pavement markings (solid line)(4" width)
|
82.129 |
MILE |
10.00 |
821.29 |
10.00 |
821.29 |
300.00 |
24,638.70 |
1.00 |
82.13 |
| 713-05-D |
temporary pavement legends and symbols (rr crossing)
|
2   |
EACH |
10.00 |
20.00 |
100.00 |
200.00 |
250.00 |
500.00 |
200.00 |
400.00 |
| 720-01-A |
erosion control system, slope protection (type a)
|
80   |
SQYD |
9.00 |
720.00 |
2.00 |
160.00 |
15.00 |
1,200.00 |
15.00 |
1,200.00 |
| 726-01 |
bedding material
|
61.6 |
CUYD |
90.00 |
5,544.00 |
325.00 |
20,020.00 |
350.00 |
21,560.00 |
300.00 |
18,480.00 |
| 727-01 |
mobilization
|
lump |
LUMP |
240,000.00 |
240,000.00 |
115,000.00 |
115,000.00 |
75,000.00 |
75,000.00 |
220,000.00 |
220,000.00 |
| 729-16-B |
object marker assembly (type 2)
|
16   |
EACH |
20.00 |
320.00 |
65.00 |
1,040.00 |
75.00 |
1,200.00 |
65.00 |
1,040.00 |
| 729-16-C |
object marker assembly (type 3)
|
8   |
EACH |
40.00 |
320.00 |
75.00 |
600.00 |
90.00 |
720.00 |
75.00 |
600.00 |
| 731-02 |
reflectorized raised pavement markers
|
865   |
EACH |
5.00 |
4,325.00 |
7.00 |
6,055.00 |
6.00 |
5,190.00 |
5.20 |
4,498.00 |
| 732-01-C |
plastic pavement striping (8" width)
|
100   |
LNFT |
1.00 |
100.00 |
1.50 |
150.00 |
2.00 |
200.00 |
0.90 |
90.00 |
| 732-01-E |
plastic pavement striping (24" width)
|
350   |
LNFT |
4.00 |
1,400.00 |
5.00 |
1,750.00 |
5.00 |
1,750.00 |
3.90 |
1,365.00 |
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
32.003 |
MILE |
2,500.00 |
80,007.50 |
3,000.00 |
96,009.00 |
3,000.00 |
96,009.00 |
2,510.00 |
80,327.53 |
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
6.177 |
MILE |
800.00 |
4,941.60 |
1,000.00 |
6,177.00 |
900.00 |
5,559.30 |
760.00 |
4,694.52 |
| 732-04-D |
plastic pavement legends & symbols (rr crossing)
|
2   |
EACH |
400.00 |
800.00 |
500.00 |
1,000.00 |
500.00 |
1,000.00 |
400.00 |
800.00 |
| 732-05 |
removal of existing markings
|
1.345 |
MILE |
6,000.00 |
8,070.00 |
6,500.00 |
8,742.50 |
8,000.00 |
10,760.00 |
5,700.00 |
7,666.50 |
| 735-01 |
mailboxes
|
170   |
EACH |
1.00 |
170.00 |
5.00 |
850.00 |
6.00 |
1,020.00 |
1.00 |
170.00 |
| 735-02 |
mailbox supports (single)
|
142   |
EACH |
100.00 |
14,200.00 |
130.00 |
18,460.00 |
125.00 |
17,750.00 |
110.00 |
15,620.00 |
| 735-03 |
mailbox supports (double)
|
7   |
EACH |
200.00 |
1,400.00 |
190.00 |
1,330.00 |
250.00 |
1,750.00 |
170.00 |
1,190.00 |
| 735-04 |
mailbox supports (multiple)
|
3   |
EACH |
260.00 |
780.00 |
300.00 |
900.00 |
300.00 |
900.00 |
250.00 |
750.00 |
| 740-01 |
construction layout
|
lump |
LUMP |
20,000.00 |
20,000.00 |
43,000.00 |
43,000.00 |
20,000.00 |
20,000.00 |
25,000.00 |
25,000.00 |
| 805-12-K-01 |
reinforced concrete box culverts (7'x 5') (precast
only) |
156.0 |
LNFT |
800.00 |
124,800.00 |
1,800.00 |
280,800.00 |
1,500.00 |
234,000.00 |
1,250.00 |
195,000.00 |
| 805-12-L-01 |
reinforced concrete box culverts (8'x 5') (precast
only) |
120.0 |
LNFT |
830.00 |
99,600.00 |
1,900.00 |
228,000.00 |
1,600.00 |
192,000.00 |
1,250.00 |
150,000.00 |
| S-001 |
special anchor section
|
3   |
EACH |
1,000.00 |
3,000.00 |
1,200.00 |
3,600.00 |
1,500.00 |
4,500.00 |
1,200.00 |
3,600.00 |
| S-002 |
saw cutting asphaltic concrete patches (9" deep)
|
1,190   |
LNFT |
9.00 |
10,710.00 |
5.00 |
5,950.00 |
5.00 |
5,950.00 |
3.50 |
4,165.00 |
| S-003 |
sawing and sealing longitudinal joints in asphaltic
concrete overlay |
4,236   |
LNFT |
1.30 |
5,506.80 |
1.00 |
4,236.00 |
1.50 |
6,354.00 |
1.25 |
5,295.00 |
| S-004 |
sawing and sealing transverse joints in asphaltic
concrete overlay |
1,562   |
LNFT |
1.60 |
2,499.20 |
2.00 |
3,124.00 |
2.00 |
3,124.00 |
1.50 |
2,343.00 |
| S-005 |
cleaning existing ditches
|
300   |
LNFT |
11.00 |
3,300.00 |
15.00 |
4,500.00 |
20.00 |
6,000.00 |
18.00 |
5,400.00 |
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
2,484,923.85 |
|
2,715,951.70 |
|
2,725,862.49 |
|
2,772,728.50 |
|