Letting of 7/25/2007 LA DOTD Headquarters


 
go back
Go Back
DBE GOAL FED
Lead Project: 713-62-0005
Parish: W CARROLL
Routes:
Description: RYE ROAD BRIDGE OVER LYON MILL BAYOU
Type Const: clearing and grubbing, grading, aggregate surfacing, concrete slab span bridge,
and related work.
Estimated Construction Cost: $427,329.50
 
RankLicenseBidderConstruction Bid
1 23112 BEN ALLEN, INC. $346,144.00
2 18546 C W & W CONTRACTORS, INC. $430,627.00
3 14788 LOUISIANA BRIDGE, INC. $445,361.40
4 02469 SAN-TECH, INC. $508,905.00
 
Item Number Item Description Quantity Unit of Measure - 1 -
BEN ALLEN, INC.
- 2 -
C W & W CONTRACTORS, INC.
- 3 -
LOUISIANA BRIDGE, INC.
- 4 -
SAN-TECH, INC.
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
201-01 clearing & grubbing lump      LUMP 2,500.00 2,500.00 5,000.00 5,000.00 13,500.00 13,500.00 13,500.00 13,500.00
202-02-A-01 removal of bridge (sta. 15+00.00: 17.50' wide x 78.80'
long timber bridge)
1      EACH 2,500.00 2,500.00 5,000.00 5,000.00 20,000.00 20,000.00 12,000.00 12,000.00
203-05 excavation & embankment lump      LUMP 10,000.00 10,000.00 24,000.00 24,000.00 18,500.00 18,500.00 13,500.00 13,500.00
204-02 temporary hay or straw bales 6      EACH 0.00 0.00 5.00 30.00 7.00 42.00 10.00 60.00
204-03 temporary slope drains 100      LNFT 0.00 0.00 5.00 500.00 1.00 100.00 8.00 800.00
204-05-A temporary sediment check dams (hay) 3      EACH 0.00 0.00 75.00 225.00 1.00 3.00 90.00 270.00
204-06 temporary silt fencing 752      LNFT 2.00 1,504.00 1.00 752.00 1.00 752.00 1.00 752.00
401-02 aggregate surface course (adjusted vehicular
measurement)
74      CUYD 105.00 7,770.00 90.00 6,660.00 100.00 7,400.00 110.00 8,140.00
711-01-D riprap (55 lb., 18" thick) 483      SQYD 66.00 31,878.00 90.00 43,470.00 75.00 36,225.00 96.00 46,368.00
711-04 geotextile fabric 483      SQYD 2.00 966.00 3.00 1,449.00 3.00 1,449.00 3.00 1,449.00
713-01 temporary signs & barricades lump      LUMP 2,500.00 2,500.00 7,500.00 7,500.00 18,000.00 18,000.00 6,000.00 6,000.00
716-01-A mulch (vegetative) 0.2    TON 1,000.00 200.00 4,000.00 800.00 680.00 136.00 3,000.00 600.00
717-01 seeding 5      LB 50.00 250.00 100.00 500.00 115.00 575.00 10.00 50.00
718-01 fertilizer 120      LB 4.00 480.00 5.00 600.00 4.60 552.00 1.00 120.00
727-01 mobilization lump      LUMP 23,000.00 23,000.00 35,000.00 35,000.00 33,500.00 33,500.00 52,000.00 52,000.00
729-16-C object marker assembly (type 3) 4      EACH 75.00 300.00 100.00 400.00 115.00 460.00 100.00 400.00
740-01 construction layout lump      LUMP 3,000.00 3,000.00 7,500.00 7,500.00 2,000.00 2,000.00 15,000.00 15,000.00
804-01-C precast concrete piles (16") 1,344      LNFT 59.00 79,296.00 85.00 114,240.00 65.60 88,166.40 84.00 112,896.00
804-12 loading permanent piles 1      EACH 0.00 0.00 1.00 1.00 1.00 1.00 8,000.00 8,000.00
805-10-A bridge superstructure & substructure (28' clear
roadway; 60 deg. crossing) (cast-in-place bents)
6      SPAN 27,000.00 162,000.00 27,000.00 162,000.00 31,000.00 186,000.00 33,300.00 199,800.00
S-101 concrete approach slabs (28' clear roadway; 60 deg.
crossing; tapered concrete barrier rail)
2      EACH 9,000.00 18,000.00 7,500.00 15,000.00 9,000.00 18,000.00 8,600.00 17,200.00
                       
 CONTRACTOR TOTAL       346,144.00   430,627.00   445,361.40   508,905.00