| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - BEN ALLEN, INC. |
- 2 - C W & W CONTRACTORS, INC. |
- 3 - LOUISIANA BRIDGE, INC. |
- 4 - SAN-TECH, INC. |
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 201-01 |
clearing & grubbing
|
lump |
LUMP |
2,500.00 |
2,500.00 |
5,000.00 |
5,000.00 |
13,500.00 |
13,500.00 |
13,500.00 |
13,500.00 |
| 202-02-A-01 |
removal of bridge (sta. 15+00.00: 17.50' wide x 78.80'
long timber bridge) |
1   |
EACH |
2,500.00 |
2,500.00 |
5,000.00 |
5,000.00 |
20,000.00 |
20,000.00 |
12,000.00 |
12,000.00 |
| 203-05 |
excavation & embankment
|
lump |
LUMP |
10,000.00 |
10,000.00 |
24,000.00 |
24,000.00 |
18,500.00 |
18,500.00 |
13,500.00 |
13,500.00 |
| 204-02 |
temporary hay or straw bales
|
6   |
EACH |
0.00 |
0.00 |
5.00 |
30.00 |
7.00 |
42.00 |
10.00 |
60.00 |
| 204-03 |
temporary slope drains
|
100   |
LNFT |
0.00 |
0.00 |
5.00 |
500.00 |
1.00 |
100.00 |
8.00 |
800.00 |
| 204-05-A |
temporary sediment check dams (hay)
|
3   |
EACH |
0.00 |
0.00 |
75.00 |
225.00 |
1.00 |
3.00 |
90.00 |
270.00 |
| 204-06 |
temporary silt fencing
|
752   |
LNFT |
2.00 |
1,504.00 |
1.00 |
752.00 |
1.00 |
752.00 |
1.00 |
752.00 |
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
74   |
CUYD |
105.00 |
7,770.00 |
90.00 |
6,660.00 |
100.00 |
7,400.00 |
110.00 |
8,140.00 |
| 711-01-D |
riprap (55 lb., 18" thick)
|
483   |
SQYD |
66.00 |
31,878.00 |
90.00 |
43,470.00 |
75.00 |
36,225.00 |
96.00 |
46,368.00 |
| 711-04 |
geotextile fabric
|
483   |
SQYD |
2.00 |
966.00 |
3.00 |
1,449.00 |
3.00 |
1,449.00 |
3.00 |
1,449.00 |
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
2,500.00 |
2,500.00 |
7,500.00 |
7,500.00 |
18,000.00 |
18,000.00 |
6,000.00 |
6,000.00 |
| 716-01-A |
mulch (vegetative)
|
0.2 |
TON |
1,000.00 |
200.00 |
4,000.00 |
800.00 |
680.00 |
136.00 |
3,000.00 |
600.00 |
| 717-01 |
seeding
|
5   |
LB |
50.00 |
250.00 |
100.00 |
500.00 |
115.00 |
575.00 |
10.00 |
50.00 |
| 718-01 |
fertilizer
|
120   |
LB |
4.00 |
480.00 |
5.00 |
600.00 |
4.60 |
552.00 |
1.00 |
120.00 |
| 727-01 |
mobilization
|
lump |
LUMP |
23,000.00 |
23,000.00 |
35,000.00 |
35,000.00 |
33,500.00 |
33,500.00 |
52,000.00 |
52,000.00 |
| 729-16-C |
object marker assembly (type 3)
|
4   |
EACH |
75.00 |
300.00 |
100.00 |
400.00 |
115.00 |
460.00 |
100.00 |
400.00 |
| 740-01 |
construction layout
|
lump |
LUMP |
3,000.00 |
3,000.00 |
7,500.00 |
7,500.00 |
2,000.00 |
2,000.00 |
15,000.00 |
15,000.00 |
| 804-01-C |
precast concrete piles (16")
|
1,344   |
LNFT |
59.00 |
79,296.00 |
85.00 |
114,240.00 |
65.60 |
88,166.40 |
84.00 |
112,896.00 |
| 804-12 |
loading permanent piles
|
1   |
EACH |
0.00 |
0.00 |
1.00 |
1.00 |
1.00 |
1.00 |
8,000.00 |
8,000.00 |
| 805-10-A |
bridge superstructure & substructure (28' clear
roadway; 60 deg. crossing) (cast-in-place bents) |
6   |
SPAN |
27,000.00 |
162,000.00 |
27,000.00 |
162,000.00 |
31,000.00 |
186,000.00 |
33,300.00 |
199,800.00 |
| S-101 |
concrete approach slabs (28' clear roadway; 60 deg.
crossing; tapered concrete barrier rail) |
2   |
EACH |
9,000.00 |
18,000.00 |
7,500.00 |
15,000.00 |
9,000.00 |
18,000.00 |
8,600.00 |
17,200.00 |
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
346,144.00 |
|
430,627.00 |
|
445,361.40 |
|
508,905.00 |
|