| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - JAMES CONSTRUCTION GROUP LLC |
- 2 - AMERICAN CONTRACTING & SERVICES,INC |
- 3 - KIEWIT LOUISIANA CO |
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 201-01 |
clearing & grubbing
|
lump |
LUMP |
90,000.00 |
90,000.00 |
50,000.00 |
50,000.00 |
3,900.00 |
3,900.00 |
|
|
| 202-01 |
removal of structures & obstructions
|
lump |
LUMP |
10,000.00 |
10,000.00 |
8,000.00 |
8,000.00 |
4,300.00 |
4,300.00 |
|
|
| 202-02-A-01 |
removal of existing bridge deck, railing and portions
of abutment |
1   |
EACH |
245,000.00 |
245,000.00 |
275,000.00 |
275,000.00 |
250,000.00 |
250,000.00 |
|
|
| 202-02-C |
removal of portland cement concrete pavement
|
125   |
SQYD |
30.00 |
3,750.00 |
100.00 |
12,500.00 |
40.00 |
5,000.00 |
|
|
| 202-02-G |
removal of surfacing and stabilized base
|
281.4 |
SQYD |
26.00 |
7,316.40 |
10.00 |
2,814.00 |
60.00 |
16,884.00 |
|
|
| 202-02-H |
removal of guard rail
|
1,016   |
LNFT |
4.70 |
4,775.20 |
2.50 |
2,540.00 |
2.50 |
2,540.00 |
|
|
| 202-02-I |
removal of concrete approach slabs
|
124.00 |
SQYD |
140.00 |
17,360.00 |
100.00 |
12,400.00 |
125.00 |
15,500.00 |
|
|
| 203-05 |
excavation and embankment
|
lump |
LUMP |
17,000.00 |
17,000.00 |
27,000.00 |
27,000.00 |
27,000.00 |
27,000.00 |
|
|
| 204-02 |
temporary hay or straw bales
|
16   |
EACH |
25.00 |
400.00 |
13.00 |
208.00 |
158.00 |
2,528.00 |
|
|
| 204-06 |
temporary silt fencing
|
900   |
LNFT |
7.00 |
6,300.00 |
5.50 |
4,950.00 |
4.00 |
3,600.00 |
|
|
| 502-01 |
superpave asphaltic concrete
|
552.7 |
TON |
180.00 |
99,486.00 |
150.00 |
82,905.00 |
188.00 |
103,907.60 |
|
|
| 509-01 |
cold planing asphaltic pavement
|
1,200   |
SQYD |
5.00 |
6,000.00 |
8.00 |
9,600.00 |
8.00 |
9,600.00 |
|
|
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 34   |
CUYD |
1.00 |
- 34.00 |
1.00 |
- 34.00 |
1.00 |
- 34.00 |
|
|
| 510-01-B |
pavement patching (12" minimum thickness)
|
100   |
SQYD |
250.00 |
25,000.00 |
150.00 |
15,000.00 |
83.00 |
8,300.00 |
|
|
| 702-03-A |
catch basins (cb-01)
|
1   |
EACH |
9,000.00 |
9,000.00 |
5,000.00 |
5,000.00 |
11,000.00 |
11,000.00 |
|
|
| 704-03 |
blocked out guard rail
|
412.5 |
LNFT |
20.00 |
8,250.00 |
21.00 |
8,662.50 |
18.00 |
7,425.00 |
|
|
| 704-08-B |
guard rail transitions (double thrie beam)
|
100.0 |
LNFT |
55.00 |
5,500.00 |
60.00 |
6,000.00 |
54.00 |
5,400.00 |
|
|
| 704-11-A |
guard rail end treatment (flared)
|
4   |
EACH |
2,250.00 |
9,000.00 |
2,500.00 |
10,000.00 |
2,100.00 |
8,400.00 |
|
|
| 712-01-A |
concrete cast-in-place revetment (4" thick)
|
760   |
SQYD |
47.00 |
35,720.00 |
100.00 |
76,000.00 |
73.00 |
55,480.00 |
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
37,875.00 |
37,875.00 |
100,000.00 |
100,000.00 |
138,000.00 |
138,000.00 |
|
|
| 713-08 |
temporary precast concrete barrier (department
furnished) |
70   |
EACH |
350.00 |
24,500.00 |
500.00 |
35,000.00 |
1,000.00 |
70,000.00 |
|
|
| 716-01-A |
mulch (vegetative)
|
0.5 |
TON |
5,000.00 |
2,500.00 |
5,500.00 |
2,750.00 |
2,100.00 |
1,050.00 |
|
|
| 717-01 |
seeding
|
10   |
LB |
100.00 |
1,000.00 |
110.00 |
1,100.00 |
31.00 |
310.00 |
|
|
| 718-01 |
fertilizer
|
333   |
LB |
5.00 |
1,665.00 |
5.50 |
1,831.50 |
25.00 |
8,325.00 |
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
250,000.00 |
250,000.00 |
259,000.00 |
259,000.00 |
335,000.00 |
335,000.00 |
|
|
| 729-13 |
mounting (bridge fascia mounted)
|
1   |
EACH |
6,000.00 |
6,000.00 |
6,500.00 |
6,500.00 |
5,000.00 |
5,000.00 |
|
|
| 729-16-C |
object marker assembly (type 3)
|
4   |
EACH |
75.00 |
300.00 |
80.00 |
320.00 |
79.00 |
316.00 |
|
|
| 731-01 |
nonreflectorized raised pavement markers
|
132   |
EACH |
12.00 |
1,584.00 |
14.00 |
1,848.00 |
16.00 |
2,112.00 |
|
|
| 731-02 |
reflectorized raised pavement markers
|
71   |
EACH |
5.25 |
372.75 |
6.00 |
426.00 |
10.50 |
745.50 |
|
|
| 732-01-A |
plastic pavement striping (4" width)
|
159   |
LNFT |
5.00 |
795.00 |
0.60 |
95.40 |
31.50 |
5,008.50 |
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
0.592 |
MILE |
5,800.00 |
3,433.60 |
3,000.00 |
1,776.00 |
7,350.00 |
4,351.20 |
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
40,000.00 |
40,000.00 |
30,000.00 |
30,000.00 |
26,800.00 |
26,800.00 |
|
|
| 804-01-B |
precast concrete piles (14")
|
310   |
LNFT |
160.00 |
49,600.00 |
100.00 |
31,000.00 |
260.00 |
80,600.00 |
|
|
| 804-01-D |
precast concrete piles (18")
|
160   |
LNFT |
260.00 |
41,600.00 |
125.00 |
20,000.00 |
300.00 |
48,000.00 |
|
|
| 804-12 |
loading permanent piles
|
1   |
EACH |
8,500.00 |
8,500.00 |
30,000.00 |
30,000.00 |
68,000.00 |
68,000.00 |
|
|
| 805-01 |
class a concrete
|
20.39 |
CUYD |
2,100.00 |
42,819.00 |
1,500.00 |
30,585.00 |
2,200.00 |
44,858.00 |
|
|
| 805-01-F |
class a concrete (bents)
|
69.03 |
CUYD |
2,575.00 |
177,752.25 |
1,500.00 |
103,545.00 |
3,000.00 |
207,090.00 |
|
|
| 805-03 |
class aa concrete
|
309.93 |
CUYD |
730.00 |
226,248.90 |
750.00 |
232,447.50 |
1,600.00 |
495,888.00 |
|
|
| 805-11 |
strip seal joints
|
323.33 |
LNFT |
110.00 |
35,566.30 |
200.00 |
64,666.00 |
193.00 |
62,402.69 |
|
|
| 806-01 |
deformed reinforcing steel
|
67,152   |
LB |
0.80 |
53,721.60 |
1.00 |
67,152.00 |
1.00 |
67,152.00 |
|
|
| 806-02 |
deformed reinforcing steel (epoxy coated)
|
43,065   |
LB |
1.00 |
43,065.00 |
1.25 |
53,831.25 |
1.00 |
43,065.00 |
|
|
| 807-08 |
structural metalwork
|
lump |
LUMP |
535,000.00 |
535,000.00 |
500,000.00 |
500,000.00 |
487,000.00 |
487,000.00 |
|
|
| 810-01 |
concrete railing (barrier)
|
678.99 |
LNFT |
55.00 |
37,344.45 |
100.00 |
67,899.00 |
247.00 |
167,710.53 |
|
|
| 813-01 |
concrete approach slabs
|
356.11 |
SQYD |
170.00 |
60,538.70 |
200.00 |
71,222.00 |
290.00 |
103,271.90 |
|
|
| 814-01-E |
drilled shaft (48")
|
160.0 |
LNFT |
625.00 |
100,000.00 |
600.00 |
96,000.00 |
800.00 |
128,000.00 |
|
|
| 814-02-E |
trial shaft (48")
|
30.0 |
LNFT |
1,000.00 |
30,000.00 |
900.00 |
27,000.00 |
1,100.00 |
33,000.00 |
|
|
| 814-04-E |
crosshole sonic logging (48")
|
6   |
EACH |
2,300.00 |
13,800.00 |
2,500.00 |
15,000.00 |
6,000.00 |
36,000.00 |
|
|
| S-001 |
impact attenuator (construction zone)(kinetic)
|
4   |
EACH |
27,000.00 |
108,000.00 |
25,000.00 |
100,000.00 |
15,750.00 |
63,000.00 |
|
|
| S-002 |
dynamic message sign unit
|
2   |
EACH |
11,200.00 |
22,400.00 |
12,000.00 |
24,000.00 |
35,000.00 |
70,000.00 |
|
|
| S-101 |
repairs to existing column bents (epoxy injection)
|
65.0 |
LNFT |
170.00 |
11,050.00 |
250.00 |
16,250.00 |
222.00 |
14,430.00 |
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | ITEM TOTAL (CONSTRUCTION BID) |
|
|
|
2,566,855.15 |
|
2,599,790.15 |
|
3,357,216.92 |
|
|
| | NUMBER OF DAYS BID AT $1,000 PER DAY. |
|
|
|
280,000.00 |
|
280,000.00 |
|
205,000.00 |
|
|
| | TOTAL BID |
|
|
|
2,846,855.15 |
|
2,879,790.15 |
|
3,562,216.92 |
|
|
|