Each project in the letting is listed with descriptive information. Click on a project to obtain a tabulation of item bids
for each bidder. It includes the unit bid for each item as well as the total item bid. Also shown are the bidder totals and ranking
for each project.
| REBID | |
| DBE GOAL FED |
| Lead Project: 005-05-0073 |
| Parish: TERREBONNE |
| Routes: LA 182, LA 24 |
| Description: NEW ORLEANS BLVD TO BARROW ST. AND BARROW ST. TO LA 660 |
Type Const:
grading, cold planing, superpave asphaltic concrete overlay, pavement patching and
widening, and related work. |
| Low Bidder: BARRIERE CONSTRUCTION CO., LLC |
| Amount: $3,908,675.74 |
| Estimated Construction Cost: $2,823,321.43 |
| Federal Number: STP-5505(503) |
| | |
| DBE GOAL FED |
| Lead Project: 010-01-0019 |
| Parish: NATCHITOCHES |
| Routes: US 71 |
| Description: US 71 @ LA 9 AND US 71 @ LA 3163 |
Type Const:
grading, lime treatment, drain struct, class ii bc, superpave asph conc pvmt, and
related work. |
| Low Bidder: MADDEN CONTRACTING CO., INC. |
| Amount: $1,207,493.45 |
| Estimated Construction Cost: $881,026.43 |
| Federal Number: STP-3501(500) |
| | |
| DBE GOAL FED |
| Lead Project: 053-09-0046 |
| Parish: CADDO |
| Routes: LA 1 |
| Description: YOUREE DRIVE (SAND BEACH BLVD.-SOUTHFIELD ROAD) |
Type Const:
grading,lime trmt, drain struct, cold planing asph pvmt, superpave asph conc, pccp,
sanitary sewer work, water service, and related work. |
| Low Bidder: BEST-YET BUILDERS, LLC |
| Amount: $10,793,511.34 |
| Estimated Construction Cost: $9,591,474.05 |
| Federal Number: NH-0900(536) |
| READV | |
| DBE GOAL FED |
| Lead Project: 238-02-0019 |
| Parish: ST MARTIN |
| Routes: LA 96 |
| Description: LA 96 BRIDGES |
Type Const:
grading, drainage structures, pavement patching, pavement widening, cold planing
asphaltic concrete, superpave asphaltic concrete pavement, and related work. |
| Low Bidder: H & S CONSTRUCTION CO., INC. |
| Amount: $1,023,738.65 |
| Estimated Construction Cost: $767,057.00 |
| Federal Number: BR-305-2(004) |
| | |
| DBE GOAL FED |
| Lead Project: 249-01-0045 |
| Parish: JEFFERSON |
| Routes: LA 45 |
| Description: LA HIGHWAY 45 (BARATARIA BOULEVARD) AND PATRIOT STREET |
Type Const:
grading, draninge structures, cold planing ac pavement, superpave ac overlay, pccp,
traffic signalization, water distribution system, sanitary sewer system and related work. |
| Low Bidder: HARD ROCK CONSTRUCTION CO. |
| Amount: $6,226,689.99 |
| Estimated Construction Cost: $4,921,051.05 |
| Federal Number: STP-2601(501) |
| | |
| DBE GOAL FED |
| Lead Project: 258-01-0030 |
| Parish: E BATON ROUGE |
| Routes: LA 427 |
| Description: PERKINS ROAD IMPROVEMENTS (ESSEN LANE TO SIEGEN LANE) |
Type Const:
grading, drainage structures, class ii base course, lime tr, superpave asphaltic
concrete overlay, portland cem. concrete pavement, pavement patching,traffic signalization & rel work |
| Low Bidder: JAMES CONSTRUCTION GROUP LLC |
| Amount: $27,479,245.31 |
| Estimated Construction Cost: $24,803,151.60 |
| Federal Number: STP-0394(013) |
| | |
| |
| Lead Project: 266-01-0036 |
| Parish: ASCENSION, ST JAMES |
| Routes: LA 22, LA 70 |
| Description: LA 70 TO I-10 & LA 70 AT LA 3125 |
Type Const:
grading, cold planing asphaltic concrete, class ii base course, superpave asphaltic
concrete overlay, and related work. |
| Low Bidder: F.G. SULLIVAN, JR. CONTRACTOR LLC |
| Amount: $1,248,923.28 |
| Estimated Construction Cost: $1,018,508.78 |
| Federal Number: |
| | |
| DBE GOAL FED |
| Lead Project: 737-55-0002 |
| Parish: TERREBONNE |
| Routes: LA 24, LA 57, LA 3040, LA 661 |
| Description: HOUMA ITS DEPLOYMENT - PHASE 2 |
Type Const:
install fiber optic network, rvd system, dms system, extended maintenance agreement,
and related work. |
| Low Bidder: ERNEST P. BREAUX ELECTRICAL, INC. |
| Amount: $1,767,438.00 |
| Estimated Construction Cost: $1,251,545.00 |
| Federal Number: ITS-NH-5503(502) |
| | |
| DBE GOAL FED |
| Lead Project: 742-26-0058 |
| Parish: JEFFERSON |
| Routes: |
| Description: VETERANS BLVD CLEARVIEW PKWY TO SUBURBAN CANAL OVLY PHASE II |
Type Const:
cold planing asph pvmt, superpave ac overlay, roadway reinforcing mesh, pvmt patching,
and related work. |
| Low Bidder: BARRIERE CONSTRUCTION CO., LLC |
| Amount: $928,584.90 |
| Estimated Construction Cost: $775,745.24 |
| Federal Number: STP-2602(541) |