| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - BARRIERE CONSTRUCTION CO., LLC |
- 2 - BOH BROS. CONSTRUCTION CO., LLC. |
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-02-F |
removal of concrete curbs
|
300.0 |
LNFT |
30.00 |
9,000.00 |
20.00 |
6,000.00 |
|
|
|
|
| 203-08 |
borrow (vehicular measurement)
|
200   |
CUYD |
40.00 |
8,000.00 |
35.00 |
7,000.00 |
|
|
|
|
| 302-02-D |
class ii base course (12" thick)
|
350.0 |
SQYD |
30.00 |
10,500.00 |
32.00 |
11,200.00 |
|
|
|
|
| 502-01 |
superpave asphaltic concrete
|
2,902.4 |
TON |
90.00 |
261,216.00 |
90.00 |
261,216.00 |
|
|
|
|
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
590.2 |
TON |
90.00 |
53,118.00 |
90.00 |
53,118.00 |
|
|
|
|
| 509-01-A |
cold planing asphaltic pavement (4")
|
14,558   |
SQYD |
6.00 |
87,348.00 |
6.00 |
87,348.00 |
|
|
|
|
| 509-01-B |
cold planing asphaltic pavement (2")
|
945   |
SQYD |
7.00 |
6,615.00 |
4.00 |
3,780.00 |
|
|
|
|
| 701-14 |
cleaning existing pipes
|
2,944   |
LNFT |
4.00 |
11,776.00 |
20.00 |
58,880.00 |
|
|
|
|
| 706-01-A |
concrete walk (4" thick)
|
65.9 |
SQYD |
165.00 |
10,873.50 |
100.00 |
6,590.00 |
|
|
|
|
| 707-03 |
combination concrete curb & gutter
|
1,242.0 |
LNFT |
35.00 |
43,470.00 |
30.00 |
37,260.00 |
|
|
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
75,000.00 |
75,000.00 |
150,000.00 |
150,000.00 |
|
|
|
|
| 713-03-C |
temporary pavement markings (8" width)
|
1,980   |
LNFT |
0.10 |
198.00 |
0.50 |
990.00 |
|
|
|
|
| 713-03-D |
temporary pavement markings (12" width)
|
1,146   |
LNFT |
0.10 |
114.60 |
0.50 |
573.00 |
|
|
|
|
| 713-03-E |
temporary pavement markings (24" width)
|
738   |
LNFT |
2.25 |
1,660.50 |
2.00 |
1,476.00 |
|
|
|
|
| 713-04-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
3.423 |
MILE |
250.00 |
855.75 |
400.00 |
1,369.20 |
|
|
|
|
| 713-04-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
3.423 |
MILE |
850.00 |
2,909.55 |
800.00 |
2,738.40 |
|
|
|
|
| 713-05-A |
temporary pavement markings (solid line)(4" width)
|
3.516 |
MILE |
425.00 |
1,494.30 |
400.00 |
1,406.40 |
|
|
|
|
| 713-06-A |
temporary pavement legends and symbols (arrow)
|
18   |
EACH |
10.00 |
180.00 |
60.00 |
1,080.00 |
|
|
|
|
| 713-06-C |
temporary pavement legends and symbols (only)
|
12   |
EACH |
10.00 |
120.00 |
60.00 |
720.00 |
|
|
|
|
| 724-01-B |
pavement patching (12" minimum thickness)
|
884   |
SQYD |
90.00 |
79,560.00 |
90.00 |
79,560.00 |
|
|
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
90,000.00 |
90,000.00 |
100,000.00 |
100,000.00 |
|
|
|
|
| 731-02 |
reflectorized raised pavement markers
|
422   |
EACH |
6.00 |
2,532.00 |
6.00 |
2,532.00 |
|
|
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
1.172 |
MILE |
2,850.00 |
3,340.20 |
2,800.00 |
3,281.60 |
|
|
|
|
| 732-02-C |
plastic pavement striping (solid line)(8" width)
|
0.125 |
MILE |
5,600.00 |
700.00 |
6,000.00 |
750.00 |
|
|
|
|
| 732-02-D |
plastic pavement striping (solid line)(12" width)
|
0.072 |
MILE |
8,500.00 |
612.00 |
9,000.00 |
648.00 |
|
|
|
|
| 732-02-E |
plastic pavement striping (solid line)(24" width)
|
0.047 |
MILE |
16,500.00 |
775.50 |
20,000.00 |
940.00 |
|
|
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
1.141 |
MILE |
1,000.00 |
1,141.00 |
1,100.00 |
1,255.10 |
|
|
|
|
| 732-04-A |
plastic pavement legends & symbols (arrow)
|
6   |
EACH |
200.00 |
1,200.00 |
300.00 |
1,800.00 |
|
|
|
|
| 732-04-C |
plastic pavement legends & symbols (only)
|
4   |
EACH |
150.00 |
600.00 |
200.00 |
800.00 |
|
|
|
|
| 736-09 |
loop detector
|
80   |
LNFT |
20.00 |
1,600.00 |
30.00 |
2,400.00 |
|
|
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
15,000.00 |
15,000.00 |
20,000.00 |
20,000.00 |
|
|
|
|
| 744-01 |
traffic control management
|
lump |
LUMP |
15,000.00 |
15,000.00 |
8,000.00 |
8,000.00 |
|
|
|
|
| S-001 |
roadway reinforcing mesh (complete road system)
|
20,000   |
SQYD |
6.00 |
120,000.00 |
6.30 |
126,000.00 |
|
|
|
|
| S-002 |
clean existing catch basins
|
2   |
EACH |
200.00 |
400.00 |
400.00 |
800.00 |
|
|
|
|
| S-003 |
clean existing drain inlets
|
28   |
EACH |
350.00 |
9,800.00 |
300.00 |
8,400.00 |
|
|
|
|
| S-004 |
cleaning and resealing random cracks in asphaltic
concrete pavement |
750   |
LNFT |
2.50 |
1,875.00 |
10.00 |
7,500.00 |
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
928,584.90 |
|
1,057,411.70 |
|
|
|
|
|