Letting of 6/28/2006 LA DOTD Headquarters


REBID
go back
Go Back
DBE GOAL FED
Lead Project: 005-05-0073
Parish: TERREBONNE
Routes: LA 182, LA 24
Description: NEW ORLEANS BLVD TO BARROW ST. AND BARROW ST. TO LA 660
Type Const: grading, cold planing, superpave asphaltic concrete overlay, pavement patching and
widening, and related work.
Estimated Construction Cost: $2,823,321.43
 
RankLicenseBidderConstruction Bid
1 06276 BARRIERE CONSTRUCTION CO., LLC $3,908,675.74
 
Item Number Item Description Quantity Unit of Measure - 1 -
BARRIERE CONSTRUCTION CO., LLC

 

 

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
202-02-F removal of concrete combination curb & gutter 750.0    LNFT 5.00 3,750.00            
202-02-H removal of guard rail 152      LNFT 5.00 760.00            
203-08 borrow (vehicular measurement) 830      CUYD 20.00 16,600.00            
502-01 superpave asphaltic concrete 22,636.6    TON 87.00 1,969,384.20            
502-01-A superpave asphaltic concrete, drives, turnouts and
miscellaneous
5,709.8    TON 87.00 496,752.60            
509-01 cold planing asphaltic pavement 170,417      SQYD 2.00 340,834.00            
509-02 contractor retained reclaimed asphaltic pavement - 9,468      CUYD 10.00 - 94,680.00            
602-02-A cleaning and resealing existing longitudinal pavement
joints
10,980      LNFT 1.75 19,215.00            
602-02-B cleaning and resealing existing transverse pavement
joints
280      LNFT 2.50 700.00            
702-04-A adjusting manholes 141      EACH 200.00 28,200.00            
702-04-B adjusting catch basins 20      EACH 200.00 4,000.00            
704-01-B guard rail (single thrie beam)(6'-3" post spacing) 152.0    LNFT 60.00 9,120.00            
704-05 guard rail anchor sections (bct) 25.0    LNFT 90.00 2,250.00            
706-01-A concrete walk (4" thick) 1,865.2    SQYD 40.00 74,608.00            
707-03 combination concrete curb & gutter 1,340.0    LNFT 40.00 53,600.00            
713-01 temporary signs & barricades lump      LUMP 220,000.00 220,000.00            
713-03-C temporary pavement markings (8" width) 2,510      LNFT 0.10 251.00            
713-03-E temporary pavement markings (24" width) 698      LNFT 1.00 698.00            
713-04-A temporary pavement markings (broken line)(4" width)(4'
length)
14.070  MILE 100.00 1,407.00            
713-04-B temporary pavement markings (broken line)(4" width)
(10' length)
14.020  MILE 1.00 14.02            
713-05-A temporary pavement markings (solid line)(4" width) 23.520  MILE 1.00 23.52            
713-06-A temporary pavement legends and symbols (arrow) 7      EACH 1.00 7.00            
713-06-B temporary pavement legends and symbols (double arrow) 4      EACH 1.00 4.00            
713-06-C temporary pavement legends and symbols (only) 9      EACH 1.00 9.00            
713-06-E temporary pavement legends and symbols (school
crossing)
6      EACH 1.00 6.00            
724-01-A pavement patching (6" minimum thickness) 2,180      SQYD 15.00 32,700.00            
724-01-B pavement patching (12" minimum thickness) 2,650      SQYD 35.00 92,750.00            
724-02 pavement widening 110.0    SQYD 25.00 2,750.00            
724-03 pavement joint repair 1,600.0    TON 25.00 40,000.00            
727-01 mobilization lump      LUMP 390,000.00 390,000.00            
729-16-B object marker assembly (type 2) 68      EACH 55.00 3,740.00            
729-16-C object marker assembly (type 3) 4      EACH 70.00 280.00            
731-02 reflectorized raised pavement markers 2,138      EACH 6.00 12,828.00            
732-01-A plastic pavement striping (4" width) 3,000      LNFT 0.50 1,500.00            
732-01-C plastic pavement striping (8" width) 1,255      LNFT 1.00 1,255.00            
732-01-E plastic pavement striping (24" width) 608      LNFT 3.00 1,824.00            
732-02-A plastic pavement striping (solid line) (4" width) 17.454  MILE 2,600.00 45,380.40            
732-03-A plastic pavement striping (broken line)(4" width) 7.260  MILE 1,000.00 7,260.00            
732-04-A plastic pavement legends & symbols (arrow) 7      EACH 200.00 1,400.00            
732-04-B plastic pavement legends & symbols (double arrow) 4      EACH 250.00 1,000.00            
732-04-C plastic pavement legends & symbols (only) 9      EACH 200.00 1,800.00            
732-04-E plastic pavement legends & symbols (school crossing) 6      EACH 500.00 3,000.00            
736-09 loop detector 625      LNFT 13.00 8,125.00            
740-01 construction layout lump      LUMP 20,000.00 20,000.00            
741-11 adjusting water valve and meter box 58      EACH 35.00 2,030.00            
744-01 traffic control management lump      LUMP 1,000.00 1,000.00            
S-001 dynamic message sign unit 6      EACH 12,000.00 72,000.00            
S-004 cleaning catch basins 126      EACH 130.00 16,380.00            
S-005 nonplastic embankment (stone) 27      CUYD 80.00 2,160.00            
                       
 CONTRACTOR TOTAL       3,908,675.74            