| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - BARRIERE CONSTRUCTION CO., LLC |
|
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-02-F |
removal of concrete combination curb & gutter
|
750.0 |
LNFT |
5.00 |
3,750.00 |
|
|
|
|
|
|
| 202-02-H |
removal of guard rail
|
152   |
LNFT |
5.00 |
760.00 |
|
|
|
|
|
|
| 203-08 |
borrow (vehicular measurement)
|
830   |
CUYD |
20.00 |
16,600.00 |
|
|
|
|
|
|
| 502-01 |
superpave asphaltic concrete
|
22,636.6 |
TON |
87.00 |
1,969,384.20 |
|
|
|
|
|
|
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
5,709.8 |
TON |
87.00 |
496,752.60 |
|
|
|
|
|
|
| 509-01 |
cold planing asphaltic pavement
|
170,417   |
SQYD |
2.00 |
340,834.00 |
|
|
|
|
|
|
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 9,468   |
CUYD |
10.00 |
- 94,680.00 |
|
|
|
|
|
|
| 602-02-A |
cleaning and resealing existing longitudinal pavement
joints |
10,980   |
LNFT |
1.75 |
19,215.00 |
|
|
|
|
|
|
| 602-02-B |
cleaning and resealing existing transverse pavement
joints |
280   |
LNFT |
2.50 |
700.00 |
|
|
|
|
|
|
| 702-04-A |
adjusting manholes
|
141   |
EACH |
200.00 |
28,200.00 |
|
|
|
|
|
|
| 702-04-B |
adjusting catch basins
|
20   |
EACH |
200.00 |
4,000.00 |
|
|
|
|
|
|
| 704-01-B |
guard rail (single thrie beam)(6'-3" post spacing)
|
152.0 |
LNFT |
60.00 |
9,120.00 |
|
|
|
|
|
|
| 704-05 |
guard rail anchor sections (bct)
|
25.0 |
LNFT |
90.00 |
2,250.00 |
|
|
|
|
|
|
| 706-01-A |
concrete walk (4" thick)
|
1,865.2 |
SQYD |
40.00 |
74,608.00 |
|
|
|
|
|
|
| 707-03 |
combination concrete curb & gutter
|
1,340.0 |
LNFT |
40.00 |
53,600.00 |
|
|
|
|
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
220,000.00 |
220,000.00 |
|
|
|
|
|
|
| 713-03-C |
temporary pavement markings (8" width)
|
2,510   |
LNFT |
0.10 |
251.00 |
|
|
|
|
|
|
| 713-03-E |
temporary pavement markings (24" width)
|
698   |
LNFT |
1.00 |
698.00 |
|
|
|
|
|
|
| 713-04-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
14.070 |
MILE |
100.00 |
1,407.00 |
|
|
|
|
|
|
| 713-04-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
14.020 |
MILE |
1.00 |
14.02 |
|
|
|
|
|
|
| 713-05-A |
temporary pavement markings (solid line)(4" width)
|
23.520 |
MILE |
1.00 |
23.52 |
|
|
|
|
|
|
| 713-06-A |
temporary pavement legends and symbols (arrow)
|
7   |
EACH |
1.00 |
7.00 |
|
|
|
|
|
|
| 713-06-B |
temporary pavement legends and symbols (double arrow)
|
4   |
EACH |
1.00 |
4.00 |
|
|
|
|
|
|
| 713-06-C |
temporary pavement legends and symbols (only)
|
9   |
EACH |
1.00 |
9.00 |
|
|
|
|
|
|
| 713-06-E |
temporary pavement legends and symbols (school
crossing) |
6   |
EACH |
1.00 |
6.00 |
|
|
|
|
|
|
| 724-01-A |
pavement patching (6" minimum thickness)
|
2,180   |
SQYD |
15.00 |
32,700.00 |
|
|
|
|
|
|
| 724-01-B |
pavement patching (12" minimum thickness)
|
2,650   |
SQYD |
35.00 |
92,750.00 |
|
|
|
|
|
|
| 724-02 |
pavement widening
|
110.0 |
SQYD |
25.00 |
2,750.00 |
|
|
|
|
|
|
| 724-03 |
pavement joint repair
|
1,600.0 |
TON |
25.00 |
40,000.00 |
|
|
|
|
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
390,000.00 |
390,000.00 |
|
|
|
|
|
|
| 729-16-B |
object marker assembly (type 2)
|
68   |
EACH |
55.00 |
3,740.00 |
|
|
|
|
|
|
| 729-16-C |
object marker assembly (type 3)
|
4   |
EACH |
70.00 |
280.00 |
|
|
|
|
|
|
| 731-02 |
reflectorized raised pavement markers
|
2,138   |
EACH |
6.00 |
12,828.00 |
|
|
|
|
|
|
| 732-01-A |
plastic pavement striping (4" width)
|
3,000   |
LNFT |
0.50 |
1,500.00 |
|
|
|
|
|
|
| 732-01-C |
plastic pavement striping (8" width)
|
1,255   |
LNFT |
1.00 |
1,255.00 |
|
|
|
|
|
|
| 732-01-E |
plastic pavement striping (24" width)
|
608   |
LNFT |
3.00 |
1,824.00 |
|
|
|
|
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
17.454 |
MILE |
2,600.00 |
45,380.40 |
|
|
|
|
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
7.260 |
MILE |
1,000.00 |
7,260.00 |
|
|
|
|
|
|
| 732-04-A |
plastic pavement legends & symbols (arrow)
|
7   |
EACH |
200.00 |
1,400.00 |
|
|
|
|
|
|
| 732-04-B |
plastic pavement legends & symbols (double arrow)
|
4   |
EACH |
250.00 |
1,000.00 |
|
|
|
|
|
|
| 732-04-C |
plastic pavement legends & symbols (only)
|
9   |
EACH |
200.00 |
1,800.00 |
|
|
|
|
|
|
| 732-04-E |
plastic pavement legends & symbols (school crossing)
|
6   |
EACH |
500.00 |
3,000.00 |
|
|
|
|
|
|
| 736-09 |
loop detector
|
625   |
LNFT |
13.00 |
8,125.00 |
|
|
|
|
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
20,000.00 |
20,000.00 |
|
|
|
|
|
|
| 741-11 |
adjusting water valve and meter box
|
58   |
EACH |
35.00 |
2,030.00 |
|
|
|
|
|
|
| 744-01 |
traffic control management
|
lump |
LUMP |
1,000.00 |
1,000.00 |
|
|
|
|
|
|
| S-001 |
dynamic message sign unit
|
6   |
EACH |
12,000.00 |
72,000.00 |
|
|
|
|
|
|
| S-004 |
cleaning catch basins
|
126   |
EACH |
130.00 |
16,380.00 |
|
|
|
|
|
|
| S-005 |
nonplastic embankment (stone)
|
27   |
CUYD |
80.00 |
2,160.00 |
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
3,908,675.74 |
|
|
|
|
|
|
|