| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - MADDEN CONTRACTING CO., INC. |
- 2 - GILCHRIST CONSTRUCTION CO. LLC |
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 201-01 |
clearing & grubbing
|
lump |
LUMP |
50,000.00 |
50,000.00 |
30,000.00 |
30,000.00 |
|
|
|
|
| 202-01 |
removal of structures & obstructions
|
lump |
LUMP |
5,000.00 |
5,000.00 |
10,000.00 |
10,000.00 |
|
|
|
|
| 202-02-G |
removal of surfacing & stabilized base
|
9,373.0 |
SQYD |
7.50 |
70,297.50 |
2.50 |
23,432.50 |
|
|
|
|
| 202-02-01 |
removal of wood frame building, left sta.
19+25 (35'x40') |
1   |
EACH |
3,000.00 |
3,000.00 |
4,000.00 |
4,000.00 |
|
|
|
|
| 202-02-02 |
removal of wood frame building, left sta.
20+75 (35'x40') |
1   |
EACH |
3,000.00 |
3,000.00 |
4,000.00 |
4,000.00 |
|
|
|
|
| 203-06 |
excavation & embankment
|
lump |
LUMP |
85,000.00 |
85,000.00 |
105,000.00 |
105,000.00 |
|
|
|
|
| 204-02 |
temporary hay or straw bales
|
80   |
EACH |
15.00 |
1,200.00 |
20.00 |
1,600.00 |
|
|
|
|
| 204-05-A |
temporary sediment check dams (hay)
|
14   |
EACH |
200.00 |
2,800.00 |
150.00 |
2,100.00 |
|
|
|
|
| 204-06 |
temporary silt fencing
|
6,890   |
LNFT |
3.00 |
20,670.00 |
1.75 |
12,057.50 |
|
|
|
|
| 302-02-D-01 |
class ii base course (12" thick)(crushed stone only)
|
13,259.5 |
SQYD |
24.50 |
324,857.75 |
27.50 |
364,636.25 |
|
|
|
|
| 304-01 |
lime
|
37.59 |
TON |
150.00 |
5,638.50 |
150.00 |
5,638.50 |
|
|
|
|
| 304-04-D |
lime treatment (type d) (12" thick)
|
2,652   |
SQYD |
2.00 |
5,304.00 |
2.90 |
7,690.80 |
|
|
|
|
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
177   |
CUYD |
30.00 |
5,310.00 |
78.00 |
13,806.00 |
|
|
|
|
| 402-01 |
traffic maintenance aggregate (vehicular measurement)
|
100.0 |
CUYD |
30.00 |
3,000.00 |
80.00 |
8,000.00 |
|
|
|
|
| 502-01 |
superpave asphaltic concrete (level 1)
|
4,431.5 |
TON |
75.00 |
332,362.50 |
90.00 |
398,835.00 |
|
|
|
|
| 701-05-G |
side drain pipe (18")
|
456   |
LNFT |
48.00 |
21,888.00 |
65.00 |
29,640.00 |
|
|
|
|
| 701-10-G |
reinforced concrete pipe (extension)(18")
|
16   |
LNFT |
108.00 |
1,728.00 |
280.00 |
4,480.00 |
|
|
|
|
| 701-10-K |
reinforced concrete pipe (extension)(30")
|
32   |
LNFT |
163.00 |
5,216.00 |
190.00 |
6,080.00 |
|
|
|
|
| 701-15 |
concrete collar
|
2   |
EACH |
800.00 |
1,600.00 |
1,300.00 |
2,600.00 |
|
|
|
|
| 705-01 |
barbed wire fence
|
151   |
LNFT |
15.00 |
2,265.00 |
16.50 |
2,491.50 |
|
|
|
|
| 706-02-C |
concrete drive (6" thick)
|
85.6 |
SQYD |
60.00 |
5,136.00 |
66.00 |
5,649.60 |
|
|
|
|
| 708-01 |
right-of-way monument
|
21   |
EACH |
150.00 |
3,150.00 |
400.00 |
8,400.00 |
|
|
|
|
| 708-02 |
right-of-way monument witness post
|
21   |
EACH |
150.00 |
3,150.00 |
400.00 |
8,400.00 |
|
|
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
52,000.00 |
52,000.00 |
7,000.00 |
7,000.00 |
|
|
|
|
| 713-04-A-01 |
temporary pvmt. markings (broken line)(4" w)(4' l)
(type i removable) |
0.909 |
MILE |
3,300.00 |
2,999.70 |
1,500.00 |
1,363.50 |
|
|
|
|
| 713-05-A-01 |
temporary pavement markings (solid line)(4" width)
(type 1 removable) |
3.636 |
MILE |
13,200.00 |
47,995.20 |
4,000.00 |
14,544.00 |
|
|
|
|
| 716-01-A |
mulch (vegetative)
|
4.60 |
ACRE |
1,200.00 |
5,520.00 |
800.00 |
3,680.00 |
|
|
|
|
| 717-01 |
seeding
|
276   |
LB |
8.00 |
2,208.00 |
11.00 |
3,036.00 |
|
|
|
|
| 718-01 |
fertilizer
|
4,600   |
LB |
0.40 |
1,840.00 |
0.60 |
2,760.00 |
|
|
|
|
| 722-01 |
project site laboratory
|
1   |
EACH |
5,000.00 |
5,000.00 |
10,000.00 |
10,000.00 |
|
|
|
|
| 726-01 |
bedding material
|
10.7 |
CUYD |
100.00 |
1,070.00 |
110.00 |
1,177.00 |
|
|
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
52,000.00 |
52,000.00 |
130,000.00 |
130,000.00 |
|
|
|
|
| 729-16-B |
object marker assembly (type 2)
|
12   |
EACH |
100.00 |
1,200.00 |
85.00 |
1,020.00 |
|
|
|
|
| 731-02 |
reflectorized raised pavement markers
|
2,812   |
EACH |
4.50 |
12,654.00 |
6.00 |
16,872.00 |
|
|
|
|
| 732-01-C |
plastic pavement striping (8" width)
|
310   |
LNFT |
1.00 |
310.00 |
1.00 |
310.00 |
|
|
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
5.228 |
MILE |
2,150.00 |
11,240.20 |
2,400.00 |
12,547.20 |
|
|
|
|
| 732-02-E |
plastic pavement striping (solid line)(24" width)
|
0.749 |
MILE |
700.00 |
524.30 |
15,000.00 |
11,235.00 |
|
|
|
|
| 732-04-A |
plastic pavement legends & symbols (arrow)
|
4   |
EACH |
150.00 |
600.00 |
200.00 |
800.00 |
|
|
|
|
| 732-04-C |
plastic pavement legends & symbols (only)
|
4   |
EACH |
150.00 |
600.00 |
200.00 |
800.00 |
|
|
|
|
| 732-05 |
removal of existing markings
|
0.909 |
MILE |
3,000.00 |
2,727.00 |
5,800.00 |
5,272.20 |
|
|
|
|
| 735-01 |
mailboxes
|
3   |
EACH |
1.00 |
3.00 |
10.00 |
30.00 |
|
|
|
|
| 735-02 |
mailbox supports (single)
|
3   |
EACH |
400.00 |
1,200.00 |
450.00 |
1,350.00 |
|
|
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
20,000.00 |
20,000.00 |
16,000.00 |
16,000.00 |
|
|
|
|
| 744-01 |
traffic control management
|
lump |
LUMP |
20,000.00 |
20,000.00 |
30,000.00 |
30,000.00 |
|
|
|
|
| S-001 |
full depth sawcut in asphaltic concrete roadway
|
5,286   |
LNFT |
0.80 |
4,228.80 |
2.00 |
10,572.00 |
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
1,207,493.45 |
|
1,338,906.55 |
|
|
|
|
|