| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - BEST-YET BUILDERS, LLC |
|
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 201-01 |
clearing & grubbing
|
lump |
LUMP |
300,000.00 |
300,000.00 |
|
|
|
|
|
|
| 202-01 |
removal of structures & obstructions
|
lump |
LUMP |
250,000.00 |
250,000.00 |
|
|
|
|
|
|
| 202-02-C-01 |
removal of portland cement concrete pavement (9" thick)
|
19,250   |
SQYD |
8.00 |
154,000.00 |
|
|
|
|
|
|
| 202-02-D |
removal of concrete walks & drives
|
3,925   |
SQYD |
15.00 |
58,875.00 |
|
|
|
|
|
|
| 202-02-E |
removal of concrete curbs
|
4,632.2 |
LNFT |
10.00 |
46,322.00 |
|
|
|
|
|
|
| 202-02-H |
removal of guard rail
|
248   |
LNFT |
10.00 |
2,480.00 |
|
|
|
|
|
|
| 202-02-I |
removal of brick island (replace in-kind)(sta.
122+20 lt.) |
lump |
LUMP |
25,000.00 |
25,000.00 |
|
|
|
|
|
|
| 203-01 |
general excavation
|
19,009   |
CUYD |
5.00 |
95,045.00 |
|
|
|
|
|
|
| 203-04 |
embankment
|
13,150   |
CUYD |
7.00 |
92,050.00 |
|
|
|
|
|
|
| 304-01 |
lime
|
30.67 |
TON |
135.00 |
4,140.45 |
|
|
|
|
|
|
| 304-04-D |
lime treatment (type d) (12" thick)
|
19,471   |
SQYD |
6.00 |
116,826.00 |
|
|
|
|
|
|
| 305-01-A-01 |
subgrade layer (cement treated)(12" thick)
|
19,471   |
SQYD |
8.50 |
165,503.50 |
|
|
|
|
|
|
| 402-01 |
traffic maintenance aggregate (vehicular measurement)
|
2,000.0 |
CUYD |
0.10 |
200.00 |
|
|
|
|
|
|
| 502-01 |
superpave asphaltic concrete binder course (level 1)
(6" thick) |
6,425.5 |
TON |
75.00 |
481,912.50 |
|
|
|
|
|
|
| 509-01-A |
cold planing asphaltic pavement(6" thick)
|
19,250   |
SQYD |
1.50 |
28,875.00 |
|
|
|
|
|
|
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 1,604   |
CUYD |
1.00 |
- 1,604.00 |
|
|
|
|
|
|
| 601-01-I |
portland cement concrete pavement (9" thick)
|
18,915.5 |
SQYD |
65.00 |
1,229,507.50 |
|
|
|
|
|
|
| 701-03-G |
storm drain pipe (18" rcp/pcp)
|
398   |
LNFT |
55.00 |
21,890.00 |
|
|
|
|
|
|
| 701-03-I |
storm drain pipe (24" rcp/pcp)
|
85   |
LNFT |
65.00 |
5,525.00 |
|
|
|
|
|
|
| 701-03-M |
storm drain pipe (36" rcp/pcp)
|
381   |
LNFT |
125.00 |
47,625.00 |
|
|
|
|
|
|
| 701-03-N |
storm drain pipe (42" rcp/pcp)
|
84   |
LNFT |
300.00 |
25,200.00 |
|
|
|
|
|
|
| 701-03-Q |
storm drain pipe (60" rcp/pcp)
|
148   |
LNFT |
350.00 |
51,800.00 |
|
|
|
|
|
|
| 702-02-B |
manholes (r-cb-11)
|
2   |
EACH |
4,500.00 |
9,000.00 |
|
|
|
|
|
|
| 702-02-C |
manholes (r-cb-11 mod)
|
4   |
EACH |
7,000.00 |
28,000.00 |
|
|
|
|
|
|
| 702-03-B |
catch basins (cb-02)
|
11   |
EACH |
4,500.00 |
49,500.00 |
|
|
|
|
|
|
| 702-03-B-01 |
catch basins (cb-02)(double barrel)(special detail)
|
1   |
EACH |
7,500.00 |
7,500.00 |
|
|
|
|
|
|
| 702-03-C |
catch basins (cb-06)
|
5   |
EACH |
4,000.00 |
20,000.00 |
|
|
|
|
|
|
| 702-03-E |
catch basins (cb-03)
|
5   |
EACH |
3,000.00 |
15,000.00 |
|
|
|
|
|
|
| 702-03-F |
catch basins (cb-08)
|
24   |
EACH |
5,000.00 |
120,000.00 |
|
|
|
|
|
|
| 702-03-G-01 |
catch basins (cb-09)(single barrel)(special detail)
|
4   |
EACH |
5,500.00 |
22,000.00 |
|
|
|
|
|
|
| 702-03-G-02 |
catch basins (cb-09)(double barrel)(special detail)
|
7   |
EACH |
9,000.00 |
63,000.00 |
|
|
|
|
|
|
| 702-03-I-01 |
cantilevered curb inlet (special detail)
|
10   |
EACH |
2,500.00 |
25,000.00 |
|
|
|
|
|
|
| 702-04-A |
adjusting manholes
|
7   |
EACH |
800.00 |
5,600.00 |
|
|
|
|
|
|
| 704-01-B |
guard rail (single thrie beam)(6'-3" post spacing)
|
98.0 |
LNFT |
45.00 |
4,410.00 |
|
|
|
|
|
|
| 704-11-B |
guard rail end treatment (tangent)
|
4   |
EACH |
2,850.00 |
11,400.00 |
|
|
|
|
|
|
| 706-01-A |
concrete walk (4" thick)
|
1,645.4 |
SQYD |
45.00 |
74,043.00 |
|
|
|
|
|
|
| 706-02-C |
concrete drive (6" thick)
|
2,176.1 |
SQYD |
50.00 |
108,805.00 |
|
|
|
|
|
|
| 707-01 |
concrete curb
|
4,675.9 |
LNFT |
12.00 |
56,110.80 |
|
|
|
|
|
|
| 707-03 |
combination concrete curb & gutter
|
150.0 |
LNFT |
35.00 |
5,250.00 |
|
|
|
|
|
|
| 710-01 |
flowable fill
|
233   |
CUYD |
100.00 |
23,300.00 |
|
|
|
|
|
|
| 711-01-D |
riprap (55 lb, 18" thick)
|
12   |
SQYD |
85.00 |
1,020.00 |
|
|
|
|
|
|
| 712-01-A |
concrete cast-in-place revetment (4" thick)
|
87   |
SQYD |
55.00 |
4,785.00 |
|
|
|
|
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
250,000.00 |
250,000.00 |
|
|
|
|
|
|
| 713-05-A |
temporary pavement markings (solid line)(4" width)
|
3.000 |
MILE |
733.00 |
2,199.00 |
|
|
|
|
|
|
| 713-09 |
temporary precast concrete barriers(department
furnished) |
150   |
EACH |
225.00 |
33,750.00 |
|
|
|
|
|
|
| 714-01 |
slab sodding
|
2,000   |
SQYD |
4.50 |
9,000.00 |
|
|
|
|
|
|
| 716-01-A |
mulch (vegetative)
|
9.36 |
ACRE |
600.00 |
5,616.00 |
|
|
|
|
|
|
| 717-01 |
seeding
|
330   |
LB |
7.00 |
2,310.00 |
|
|
|
|
|
|
| 718-01 |
fertilizer
|
1,560   |
LB |
0.85 |
1,326.00 |
|
|
|
|
|
|
| 722-02 |
project site laboratory (equipped)
|
1   |
EACH |
13,500.00 |
13,500.00 |
|
|
|
|
|
|
| 726-01 |
bedding material
|
1,000.0 |
CUYD |
50.00 |
50,000.00 |
|
|
|
|
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
1,000,000.00 |
1,000,000.00 |
|
|
|
|
|
|
| 729-16-C |
object marker assembly (type 3)
|
2   |
EACH |
75.00 |
150.00 |
|
|
|
|
|
|
| 731-02 |
reflectorized raised pavement markers
|
442   |
EACH |
5.90 |
2,607.80 |
|
|
|
|
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
1.167 |
MILE |
2,345.00 |
2,736.62 |
|
|
|
|
|
|
| 732-02-C |
plastic pavement striping (solid line) (8" width)
|
0.085 |
MILE |
4,690.00 |
398.65 |
|
|
|
|
|
|
| 732-02-D |
plastic pavement striping (solid line) (12" width)
|
0.207 |
MILE |
7,095.00 |
1,468.67 |
|
|
|
|
|
|
| 732-02-E |
plastic pavement striping (solid line) (24" width)
|
0.141 |
MILE |
14,190.00 |
2,000.79 |
|
|
|
|
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
1.140 |
MILE |
1,840.00 |
2,097.60 |
|
|
|
|
|
|
| 732-03-C |
plastic pavement striping (broken line)(8" width)
|
0.057 |
MILE |
3,680.00 |
209.76 |
|
|
|
|
|
|
| 732-04-A |
plastic pavement legends & symbols (arrow)
|
19   |
EACH |
175.00 |
3,325.00 |
|
|
|
|
|
|
| 732-04-C |
plastic pavement legends & symbols (only)
|
3   |
EACH |
190.00 |
570.00 |
|
|
|
|
|
|
| 736-09 |
loop detector
|
500   |
LNFT |
15.00 |
7,500.00 |
|
|
|
|
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
100,000.00 |
100,000.00 |
|
|
|
|
|
|
| 741-06 |
relocating fire hydrant
|
7   |
EACH |
3,500.00 |
24,500.00 |
|
|
|
|
|
|
| 741-08 |
relocating water meter
|
14   |
EACH |
700.00 |
9,800.00 |
|
|
|
|
|
|
| 741-10 |
adjusting water service lines
|
200   |
LNFT |
500.00 |
100,000.00 |
|
|
|
|
|
|
| 741-11 |
adjusting water valve and meter box
|
12   |
EACH |
900.00 |
10,800.00 |
|
|
|
|
|
|
| 741-14 |
concrete blocking
|
0.2 |
CUYD |
650.00 |
130.00 |
|
|
|
|
|
|
| 742-01-D-01 |
sanitary sewer pipe (10" d.i.-class 50 w/401 liner)
|
200   |
LNFT |
75.00 |
15,000.00 |
|
|
|
|
|
|
| 742-01-F-01 |
sanitary sewer pipe (16" d.i.-class 50 w/401 liner)
|
16   |
LNFT |
185.00 |
2,960.00 |
|
|
|
|
|
|
| 742-04 |
casing (20" steel-3/8" minimum wall thickness)
|
14   |
LNFT |
95.00 |
1,330.00 |
|
|
|
|
|
|
| 744-01 |
traffic control management
|
lump |
LUMP |
250,000.00 |
250,000.00 |
|
|
|
|
|
|
| 803-03 |
steel sheet pile wall
|
50,000   |
SQFT |
0.10 |
5,000.00 |
|
|
|
|
|
|
| 805-01-A |
class a concrete (pipe headwalls)
|
68.12 |
CUYD |
900.00 |
61,308.00 |
|
|
|
|
|
|
| 805-12-A |
reinforced concrete box culverts (4'x 3')
|
30.0 |
LNFT |
200.00 |
6,000.00 |
|
|
|
|
|
|
| 805-12-A-01 |
reinforced concrete box culverts (4'x 3')(precast only,
astm c1433) |
778.0 |
LNFT |
400.00 |
311,200.00 |
|
|
|
|
|
|
| 805-12-C-01 |
reinforced concrete box culverts (6'x 3')(precast only,
astm c1433) |
1,348.0 |
LNFT |
500.00 |
674,000.00 |
|
|
|
|
|
|
| 805-12-Y |
reinforced concrete box culverts (10'x 6')
|
142.0 |
LNFT |
1,500.00 |
213,000.00 |
|
|
|
|
|
|
| 805-12-Y-01 |
reinforced concrete box culverts (10'x 6')(precast
only, astm c1433) |
2,414.0 |
LNFT |
1,500.00 |
3,621,000.00 |
|
|
|
|
|
|
| 806-01 |
deformed reinforcing steel
|
8,117   |
LB |
1.10 |
8,928.70 |
|
|
|
|
|
|
| S-001 |
sanitary sewer manhole
|
2   |
EACH |
2,500.00 |
5,000.00 |
|
|
|
|
|
|
| S-002 |
testing of sewer mains and manholes
|
lump |
LUMP |
7,000.00 |
7,000.00 |
|
|
|
|
|
|
| S-003 |
temporary construction entrance
|
2   |
EACH |
1.00 |
2.00 |
|
|
|
|
|
|
| S-004 |
concrete encasement of sanitary sewer mains
|
30   |
LNFT |
200.00 |
6,000.00 |
|
|
|
|
|
|
| S-005 |
abandon existing sanitary sewer mains
|
lump |
LUMP |
4,500.00 |
4,500.00 |
|
|
|
|
|
|
| S-006 |
saw cutting of existing pavement (full depth)
|
3,078   |
LNFT |
5.00 |
15,390.00 |
|
|
|
|
|
|
| S-009 |
temporary erosion control
|
lump |
LUMP |
50,000.00 |
50,000.00 |
|
|
|
|
|
|
| S-010 |
temporary median crossovers
|
lump |
LUMP |
45,000.00 |
45,000.00 |
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | ITEM TOTAL (CONSTRUCTION BID) |
|
|
|
10,793,511.34 |
|
|
|
|
|
|
| | Number of Days Bid at $3,000 per day. |
|
|
400 |
1,200,000.00 |
0 |
|
0 |
|
0 |
|
| | TOTAL BID |
|
|
|
11,993,511.34 |
|
|
|
|
|
|
|