| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - JAMES CONSTRUCTION GROUP LLC |
- 2 - BARBER BROS. CONTRACTING CO., L.L.C |
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-01 |
removal of structures and obstructions
|
lump |
LUMP |
150,000.00 |
150,000.00 |
150,000.00 |
150,000.00 |
|
|
|
|
| 202-02-A-01 |
removal of bridges (sta. 71+08: 160'-00" combined
concrete slab and steel girder) |
1   |
EACH |
30,000.00 |
30,000.00 |
120,000.00 |
120,000.00 |
|
|
|
|
| 202-02-B |
removal of concrete box culverts (sta. 55+62; 4' x 4'
x 41') |
1   |
EACH |
3,000.00 |
3,000.00 |
10,000.00 |
10,000.00 |
|
|
|
|
| 202-02-C |
removal of portland cement concrete pavement
|
2,954   |
SQYD |
14.00 |
41,356.00 |
40.00 |
118,160.00 |
|
|
|
|
| 202-02-D |
removal of concrete walks & drives
|
13,386   |
SQYD |
12.00 |
160,632.00 |
25.00 |
334,650.00 |
|
|
|
|
| 202-02-E |
removal of concrete curbs
|
5,240.8 |
LNFT |
6.00 |
31,444.80 |
10.00 |
52,408.00 |
|
|
|
|
| 202-02-F |
removal of concrete combination curb & gutter
|
2,640.9 |
LNFT |
6.00 |
15,845.40 |
10.00 |
26,409.00 |
|
|
|
|
| 202-02-G |
removal of surfacing & stabilized base
|
61,783.4 |
SQYD |
8.00 |
494,267.20 |
3.50 |
216,241.90 |
|
|
|
|
| 202-02-I |
removal of existing signal equipment and related items
|
lump |
LUMP |
6,000.00 |
6,000.00 |
15,000.00 |
15,000.00 |
|
|
|
|
| 202-02-J |
removal of asphalt drives
|
524   |
SQYD |
45.00 |
23,580.00 |
20.00 |
10,480.00 |
|
|
|
|
| 203-01 |
general excavation
|
42,297   |
CUYD |
7.00 |
296,079.00 |
15.00 |
634,455.00 |
|
|
|
|
| 203-02 |
drainage excavation
|
3,980   |
CUYD |
15.00 |
59,700.00 |
30.00 |
119,400.00 |
|
|
|
|
| 203-04 |
embankment
|
33,458   |
CUYD |
13.00 |
434,954.00 |
20.00 |
669,160.00 |
|
|
|
|
| 204-02 |
temporary hay or straw bales
|
3,450   |
EACH |
8.50 |
29,325.00 |
10.00 |
34,500.00 |
|
|
|
|
| 204-05-A |
temporary sediment check dams (hay)
|
53   |
EACH |
95.00 |
5,035.00 |
600.00 |
31,800.00 |
|
|
|
|
| 204-06 |
temporary silt fencing
|
11,540   |
LNFT |
1.45 |
16,733.00 |
2.00 |
23,080.00 |
|
|
|
|
| 204-07 |
temporary stone construction entrance
|
1   |
EACH |
3,000.00 |
3,000.00 |
6,000.00 |
6,000.00 |
|
|
|
|
| 302-02-D |
class ii base course (12" thick)
|
5,114.4 |
SQYD |
30.00 |
153,432.00 |
36.00 |
184,118.40 |
|
|
|
|
| 302-02-E |
class ii base course (8" thick)
|
112,020.7 |
SQYD |
25.00 |
2,800,517.50 |
28.00 |
3,136,579.60 |
|
|
|
|
| 304-01 |
lime
|
1,516.37 |
TON |
130.00 |
197,128.10 |
150.00 |
227,455.50 |
|
|
|
|
| 304-04-D |
lime treatment (type d) (12" thick)
|
107,202   |
SQYD |
1.80 |
192,963.60 |
5.00 |
536,010.00 |
|
|
|
|
| 402-01 |
traffic maintenance aggregate (vehicular measurement)
|
5,000.0 |
CUYD |
120.00 |
600,000.00 |
60.00 |
300,000.00 |
|
|
|
|
| 502-01 |
superpave asphaltic concrete
|
290.8 |
TON |
150.00 |
43,620.00 |
200.00 |
58,160.00 |
|
|
|
|
| 601-01-K |
portland cement concrete pavement (10" thick)
|
97,057.8 |
SQYD |
65.00 |
6,308,757.00 |
65.00 |
6,308,757.00 |
|
|
|
|
| 601-01-K-01 |
portland cement concrete pavement (10" thick) (phase
2 - stage 2 construction) |
1,288.4 |
SQYD |
100.00 |
128,840.00 |
250.00 |
322,100.00 |
|
|
|
|
| 601-02-K |
portland cement concrete pavement (10" thick)
(crossovers & turnouts) |
9,847.2 |
SQYD |
70.00 |
689,304.00 |
85.00 |
837,012.00 |
|
|
|
|
| 601-04 |
portland cement concrete pavement coring
|
27   |
EACH |
100.00 |
2,700.00 |
300.00 |
8,100.00 |
|
|
|
|
| 602-05-K-02 |
full depth patching of jointed conc pvmt (10" thick)
(16.1-48.0 sq yds) |
34.9 |
SQYD |
600.00 |
20,940.00 |
500.00 |
17,450.00 |
|
|
|
|
| 602-05-K-03 |
full depth patching of jointed conc pvmt (10" thick)
(48.1 sq yds & over) |
203.7 |
SQYD |
600.00 |
122,220.00 |
300.00 |
61,110.00 |
|
|
|
|
| 701-01-P |
cross drain pipe (54" rcp/pcp)
|
224   |
LNFT |
265.00 |
59,360.00 |
400.00 |
89,600.00 |
|
|
|
|
| 701-01-S |
cross drain pipe (72" rcp/pcp)
|
408   |
LNFT |
600.00 |
244,800.00 |
550.00 |
224,400.00 |
|
|
|
|
| 701-03-F |
storm drain pipe (15" rcp/pcp or cmp)
|
9,015   |
LNFT |
85.00 |
766,275.00 |
115.00 |
1,036,725.00 |
|
|
|
|
| 701-03-G |
storm drain pipe (18" rcp/pcp)
|
4,242   |
LNFT |
95.00 |
402,990.00 |
130.00 |
551,460.00 |
|
|
|
|
| 701-03-I |
storm drain pipe (24" rcp/pcp)
|
3,327   |
LNFT |
125.00 |
415,875.00 |
150.00 |
499,050.00 |
|
|
|
|
| 701-03-I-01 |
storm drain pipe (24" pcp) (outfall)
|
80   |
LNFT |
125.00 |
10,000.00 |
75.00 |
6,000.00 |
|
|
|
|
| 701-03-K |
storm drain pipe (30" rcp/pcp)
|
3,343   |
LNFT |
155.00 |
518,165.00 |
200.00 |
668,600.00 |
|
|
|
|
| 701-03-K-01 |
storm drain pipe (30" pcp) (outfall)
|
20   |
LNFT |
155.00 |
3,100.00 |
100.00 |
2,000.00 |
|
|
|
|
| 701-03-M |
storm drain pipe (36" rcp/pcp)
|
1,969   |
LNFT |
215.00 |
423,335.00 |
220.00 |
433,180.00 |
|
|
|
|
| 701-03-N |
storm drain pipe (42" rcp/pcp)
|
1,657   |
LNFT |
225.00 |
372,825.00 |
225.00 |
372,825.00 |
|
|
|
|
| 701-03-O |
storm drain pipe (48" rcp/pcp)
|
1,242   |
LNFT |
265.00 |
329,130.00 |
260.00 |
322,920.00 |
|
|
|
|
| 701-03-P |
storm drain pipe (54" rcp/pcp)
|
445   |
LNFT |
275.00 |
122,375.00 |
350.00 |
155,750.00 |
|
|
|
|
| 701-03-Q |
storm drain pipe (60" rcp/pcp)
|
1,584   |
LNFT |
290.00 |
459,360.00 |
400.00 |
633,600.00 |
|
|
|
|
| 701-03-S |
storm drain pipe (72" rcp/pcp)
|
657   |
LNFT |
610.00 |
400,770.00 |
550.00 |
361,350.00 |
|
|
|
|
| 701-03-U |
storm drain pipe (84" rcp/pcp)
|
234   |
LNFT |
650.00 |
152,100.00 |
800.00 |
187,200.00 |
|
|
|
|
| 701-03-U-01 |
storm drain pipe (84" pcp) (outfall)
|
20   |
LNFT |
650.00 |
13,000.00 |
500.00 |
10,000.00 |
|
|
|
|
| 701-05-I |
side drain pipe (24")
|
88   |
LNFT |
70.00 |
6,160.00 |
60.00 |
5,280.00 |
|
|
|
|
| 701-09-A |
fabricating pipe fittings (15" x 15" x 15")
|
27   |
EACH |
500.00 |
13,500.00 |
650.00 |
17,550.00 |
|
|
|
|
| 701-09-B |
fabricating pipe fittings (18" x 18" x 15")
|
17   |
EACH |
700.00 |
11,900.00 |
900.00 |
15,300.00 |
|
|
|
|
| 701-09-C |
fabricating pipe fittings (24" x 24" x 15")
|
15   |
EACH |
1,000.00 |
15,000.00 |
1,200.00 |
18,000.00 |
|
|
|
|
| 701-09-D |
fabricating pipe fittings (30" x 30" x 15")
|
11   |
EACH |
1,350.00 |
14,850.00 |
2,000.00 |
22,000.00 |
|
|
|
|
| 701-09-E |
fabricating pipe fittings (36" x 36" x 15")
|
4   |
EACH |
2,000.00 |
8,000.00 |
2,500.00 |
10,000.00 |
|
|
|
|
| 701-09-F |
fabricating pipe fittings (36" x 36" x 36")
|
1   |
EACH |
3,200.00 |
3,200.00 |
3,000.00 |
3,000.00 |
|
|
|
|
| 701-09-G |
fabricating pipe fittings (42" x 42" x 15")
|
7   |
EACH |
1,700.00 |
11,900.00 |
2,000.00 |
14,000.00 |
|
|
|
|
| 701-09-H |
fabricating pipe fittings (42" x 42" x 36")
|
1   |
EACH |
3,200.00 |
3,200.00 |
4,000.00 |
4,000.00 |
|
|
|
|
| 701-09-I |
fabricating pipe fittings (48" x 48" x 15")
|
8   |
EACH |
2,600.00 |
20,800.00 |
3,000.00 |
24,000.00 |
|
|
|
|
| 701-09-J |
fabricating pipe fittings (54" x 54" x 15")
|
1   |
EACH |
3,200.00 |
3,200.00 |
4,000.00 |
4,000.00 |
|
|
|
|
| 701-09-K |
fabricating pipe fittings (60" x 60" x 15")
|
6   |
EACH |
3,200.00 |
19,200.00 |
4,500.00 |
27,000.00 |
|
|
|
|
| 701-09-L |
fabricating pipe fittings (60" x 60" x 24")
|
1   |
EACH |
3,800.00 |
3,800.00 |
5,500.00 |
5,500.00 |
|
|
|
|
| 701-09-M |
fabricating pipe fittings (72" x 72" x 15")
|
1   |
EACH |
4,000.00 |
4,000.00 |
6,000.00 |
6,000.00 |
|
|
|
|
| 701-09-N |
fabricating pipe fittings (84" x 84" x 15")
|
1   |
EACH |
4,200.00 |
4,200.00 |
6,500.00 |
6,500.00 |
|
|
|
|
| 702-02-B |
manholes (r-cb-11)
|
49   |
EACH |
3,700.00 |
181,300.00 |
3,500.00 |
171,500.00 |
|
|
|
|
| 702-02-C |
manholes (r-cb-11 mod)
|
8   |
EACH |
4,800.00 |
38,400.00 |
10,000.00 |
80,000.00 |
|
|
|
|
| 702-02-G |
manholes (mh-20x9)
|
2   |
EACH |
15,000.00 |
30,000.00 |
25,000.00 |
50,000.00 |
|
|
|
|
| 702-02-H |
manholes (r-cb-36)
|
7   |
EACH |
10,000.00 |
70,000.00 |
6,000.00 |
42,000.00 |
|
|
|
|
| 702-03-A |
catch basins (cb-01)
|
175   |
EACH |
2,800.00 |
490,000.00 |
2,500.00 |
437,500.00 |
|
|
|
|
| 702-03-B |
catch basins (cb-02)
|
1   |
EACH |
3,800.00 |
3,800.00 |
8,000.00 |
8,000.00 |
|
|
|
|
| 702-03-C |
catch basins (cb-06)
|
117   |
EACH |
3,800.00 |
444,600.00 |
4,000.00 |
468,000.00 |
|
|
|
|
| 702-03-F |
catch basins (cb-08)
|
37   |
EACH |
7,000.00 |
259,000.00 |
8,000.00 |
296,000.00 |
|
|
|
|
| 702-04-A |
adjusting manholes
|
18   |
EACH |
1,000.00 |
18,000.00 |
2,000.00 |
36,000.00 |
|
|
|
|
| 705-06-C |
chain link fence (6-foot height)
|
326   |
LNFT |
30.00 |
9,780.00 |
35.00 |
11,410.00 |
|
|
|
|
| 705-08-C |
15-foot double gate for chain link fence (6-foot
height) |
1   |
DBGT |
850.00 |
850.00 |
1,000.00 |
1,000.00 |
|
|
|
|
| 706-01-A |
concrete walk (4" thick)
|
16,719.8 |
SQYD |
30.00 |
501,594.00 |
30.00 |
501,594.00 |
|
|
|
|
| 706-02-C |
concrete drive (6" thick)
|
5,470.5 |
SQYD |
38.00 |
207,879.00 |
50.00 |
273,525.00 |
|
|
|
|
| 707-01 |
concrete curb
|
31,257.4 |
LNFT |
8.00 |
250,059.20 |
8.00 |
250,059.20 |
|
|
|
|
| 707-03 |
combination concrete curb and gutter
|
598.6 |
LNFT |
35.00 |
20,951.00 |
50.00 |
29,930.00 |
|
|
|
|
| 708-01 |
right-of-way monument
|
97   |
EACH |
150.00 |
14,550.00 |
800.00 |
77,600.00 |
|
|
|
|
| 711-01-C |
riprap (30 lb, 18" thick)
|
5,178   |
SQYD |
60.00 |
310,680.00 |
60.00 |
310,680.00 |
|
|
|
|
| 711-04 |
geotextile fabric
|
5,178   |
SQYD |
2.50 |
12,945.00 |
2.00 |
10,356.00 |
|
|
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
440,000.00 |
440,000.00 |
500,000.00 |
500,000.00 |
|
|
|
|
| 713-03-A |
temporary pavement markings (4" width)
|
59,153   |
LNFT |
0.20 |
11,830.60 |
0.30 |
17,745.90 |
|
|
|
|
| 713-09 |
temporary precast concrete barrier (department
furnished) |
72   |
EACH |
400.00 |
28,800.00 |
600.00 |
43,200.00 |
|
|
|
|
| 722-01 |
project site laboratory
|
1   |
EACH |
30,000.00 |
30,000.00 |
60,000.00 |
60,000.00 |
|
|
|
|
| 725-02 |
temporary detour roads
|
1,046.4 |
SQYD |
125.00 |
130,800.00 |
100.00 |
104,640.00 |
|
|
|
|
| 726-01 |
bedding material
|
4,872.5 |
CUYD |
55.00 |
267,987.50 |
45.00 |
219,262.50 |
|
|
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
2,000,000.00 |
2,000,000.00 |
3,000,000.00 |
3,000,000.00 |
|
|
|
|
| 729-01 |
sign (type a)
|
379.0 |
SQFT |
20.00 |
7,580.00 |
45.00 |
17,055.00 |
|
|
|
|
| 729-16-B |
object marker assembly (type 2)
|
4   |
EACH |
55.00 |
220.00 |
65.00 |
260.00 |
|
|
|
|
| 729-16-C |
object marker assembly (type 3)
|
4   |
EACH |
75.00 |
300.00 |
90.00 |
360.00 |
|
|
|
|
| 731-02 |
reflectorized raised pavement markers
|
2,493   |
EACH |
5.50 |
13,711.50 |
7.00 |
17,451.00 |
|
|
|
|
| 732-01-C |
plastic pavement striping (8" width)
|
4,600   |
LNFT |
0.80 |
3,680.00 |
1.00 |
4,600.00 |
|
|
|
|
| 732-01-E |
plastic pavement striping (24" width)
|
1,587   |
LNFT |
2.70 |
4,284.90 |
3.30 |
5,237.10 |
|
|
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
11.070 |
MILE |
2,200.00 |
24,354.00 |
2,800.00 |
30,996.00 |
|
|
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
9.457 |
MILE |
830.00 |
7,849.31 |
1,100.00 |
10,402.70 |
|
|
|
|
| 732-04-A |
plastic pavement legends & symbols (arrow)
|
131   |
EACH |
160.00 |
20,960.00 |
200.00 |
26,200.00 |
|
|
|
|
| 732-04-C |
plastic pavement legends & symbols (only)
|
17   |
EACH |
175.00 |
2,975.00 |
220.00 |
3,740.00 |
|
|
|
|
| 732-05 |
removal of existing pavement markings
|
0.200 |
MILE |
5,200.00 |
1,040.00 |
6,500.00 |
1,300.00 |
|
|
|
|
| 735-01 |
mailboxes
|
30   |
EACH |
1.00 |
30.00 |
6.00 |
180.00 |
|
|
|
|
| 735-02 |
mailbox supports (single)
|
30   |
EACH |
125.00 |
3,750.00 |
145.00 |
4,350.00 |
|
|
|
|
| 736-01 |
trenching and backfilling
|
2,470   |
LNFT |
4.00 |
9,880.00 |
6.00 |
14,820.00 |
|
|
|
|
| 736-03-A |
jacked or bored conduit (2" dia. pec)
|
2,210   |
LNFT |
7.00 |
15,470.00 |
15.00 |
33,150.00 |
|
|
|
|
| 736-03-B |
jacked or bored conduit (3" dia. pec)
|
2,350   |
LNFT |
17.00 |
39,950.00 |
24.00 |
56,400.00 |
|
|
|
|
| 736-03-C |
jacked or bored conduit (2" dia. hdpe)
|
14,225   |
LNFT |
8.00 |
113,800.00 |
14.00 |
199,150.00 |
|
|
|
|
| 736-04-B |
signal support, 25' mast arm with luminaire
|
1   |
EACH |
10,000.00 |
10,000.00 |
7,500.00 |
7,500.00 |
|
|
|
|
| 736-04-C |
signal support, 35' mast arm with luminaire
|
2   |
EACH |
10,000.00 |
20,000.00 |
8,200.00 |
16,400.00 |
|
|
|
|
| 736-04-D |
signal support, 40' mast arm with luminaire
|
2   |
EACH |
11,000.00 |
22,000.00 |
10,000.00 |
20,000.00 |
|
|
|
|
| 736-04-E |
signal support, 45' mast arm with luminaire
|
1   |
EACH |
20,000.00 |
20,000.00 |
11,000.00 |
11,000.00 |
|
|
|
|
| 736-04-F |
signal support, 50' mast arm with luminaire
|
2   |
EACH |
20,000.00 |
40,000.00 |
12,000.00 |
24,000.00 |
|
|
|
|
| 736-04-G |
signal support, 55' mast arm with luminaire
|
4   |
EACH |
20,000.00 |
80,000.00 |
15,000.00 |
60,000.00 |
|
|
|
|
| 736-04-H |
signal support, 65' mast arm with luminaire
|
2   |
EACH |
23,000.00 |
46,000.00 |
30,000.00 |
60,000.00 |
|
|
|
|
| 736-04-I |
signal support, 70' mast arm with luminaire
|
2   |
EACH |
24,000.00 |
48,000.00 |
30,500.00 |
61,000.00 |
|
|
|
|
| 736-04-J |
signal support, pedestal pole
|
3   |
EACH |
1,700.00 |
5,100.00 |
1,500.00 |
4,500.00 |
|
|
|
|
| 736-05-B |
signal heads, 3 face led (r,y,g)
|
27   |
EACH |
1,000.00 |
27,000.00 |
900.00 |
24,300.00 |
|
|
|
|
| 736-05-C |
signal heads, 3 face led (r,<-y,<-g)
|
7   |
EACH |
800.00 |
5,600.00 |
830.00 |
5,810.00 |
|
|
|
|
| 736-05-D |
signal heads, 5 face led (r,y,y->,g,g->)
|
8   |
EACH |
1,400.00 |
11,200.00 |
1,650.00 |
13,200.00 |
|
|
|
|
| 736-05-E |
signal heads, 5 face led (r,<-y,y,<-g,g)
|
6   |
EACH |
1,400.00 |
8,400.00 |
1,650.00 |
9,900.00 |
|
|
|
|
| 736-05-F |
signal heads, pedestrian led (symbol)
|
32   |
EACH |
1,000.00 |
32,000.00 |
720.00 |
23,040.00 |
|
|
|
|
| 736-06 |
signal service
|
4   |
EACH |
1,800.00 |
7,200.00 |
1,500.00 |
6,000.00 |
|
|
|
|
| 736-08 |
signal controller
|
4   |
EACH |
26,000.00 |
104,000.00 |
24,000.00 |
96,000.00 |
|
|
|
|
| 736-09 |
loop detector
|
915   |
LNFT |
11.00 |
10,065.00 |
12.00 |
10,980.00 |
|
|
|
|
| 736-10-A |
underground junction box type "e"
|
20   |
EACH |
600.00 |
12,000.00 |
480.00 |
9,600.00 |
|
|
|
|
| 736-10-B |
underground junction box type "f"
|
31   |
EACH |
750.00 |
23,250.00 |
540.00 |
16,740.00 |
|
|
|
|
| 736-10-C |
underground junction box type "g"
|
24   |
EACH |
1,400.00 |
33,600.00 |
1,000.00 |
24,000.00 |
|
|
|
|
| 736-10-D |
underground junction box type "h"
|
11   |
EACH |
4,700.00 |
51,700.00 |
1,400.00 |
15,400.00 |
|
|
|
|
| 736-11-A |
conduit (1/2" dia. pec)
|
150   |
LNFT |
1.30 |
195.00 |
3.76 |
564.00 |
|
|
|
|
| 736-11-B |
conduit (2" dia. pec)
|
2,000   |
LNFT |
3.60 |
7,200.00 |
5.50 |
11,000.00 |
|
|
|
|
| 736-11-C |
conduit (3" dia. pec)
|
320   |
LNFT |
5.60 |
1,792.00 |
10.00 |
3,200.00 |
|
|
|
|
| 736-12-A |
conductor, 3c (street sign cable / #14 awg)
|
3,705   |
LNFT |
4.10 |
15,190.50 |
2.60 |
9,633.00 |
|
|
|
|
| 736-12-B |
conductor, 3c (emergency vehicle cable)
|
3,150   |
LNFT |
1.10 |
3,465.00 |
2.20 |
6,930.00 |
|
|
|
|
| 736-12-C |
conductor, 6c (signal / #14 awg)
|
2,340   |
LNFT |
1.60 |
3,744.00 |
1.80 |
4,212.00 |
|
|
|
|
| 736-12-D |
conductor, 10c (signal / #14 awg)
|
11,070   |
LNFT |
2.20 |
24,354.00 |
2.00 |
22,140.00 |
|
|
|
|
| 736-12-E |
conductor, 12c (street light cable / #6 awg)
|
3,350   |
LNFT |
4.40 |
14,740.00 |
5.20 |
17,420.00 |
|
|
|
|
| 736-12-F |
conductor, 3c (power)
|
795   |
LNFT |
4.50 |
3,577.50 |
5.20 |
4,134.00 |
|
|
|
|
| 736-12-G |
conductor, 2c (loop lead-in / #14 awg)
|
4,090   |
LNFT |
1.20 |
4,908.00 |
1.25 |
5,112.50 |
|
|
|
|
| 736-12-H |
conductor, 2c (ped push button / #14 awg)
|
4,750   |
LNFT |
1.20 |
5,700.00 |
2.00 |
9,500.00 |
|
|
|
|
| 739-01 |
hydro-seeding
|
4.20 |
ACRE |
1,000.00 |
4,200.00 |
1,200.00 |
5,040.00 |
|
|
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
333,000.00 |
333,000.00 |
500,000.00 |
500,000.00 |
|
|
|
|
| 742-01-C |
sanitary sewer pipe (8")
|
1,000   |
LNFT |
70.00 |
70,000.00 |
60.00 |
60,000.00 |
|
|
|
|
| 742-01-C-01 |
sanitary sewer pipe (8") (cast iron pipe only)
|
90   |
LNFT |
135.00 |
12,150.00 |
120.00 |
10,800.00 |
|
|
|
|
| 742-02 |
adjusting sanitary sewer house connections
|
10   |
EACH |
1,100.00 |
11,000.00 |
2,000.00 |
20,000.00 |
|
|
|
|
| 744-01 |
traffic control management
|
lump |
LUMP |
15,000.00 |
15,000.00 |
500,000.00 |
500,000.00 |
|
|
|
|
| 804-01-F |
precast concrete piles (24")
|
3,600   |
LNFT |
100.00 |
360,000.00 |
155.00 |
558,000.00 |
|
|
|
|
| 804-05 |
precast concrete test piles
|
1   |
EACH |
40,000.00 |
40,000.00 |
45,000.00 |
45,000.00 |
|
|
|
|
| 804-09 |
loading test piles
|
1   |
EACH |
5,000.00 |
5,000.00 |
3,000.00 |
3,000.00 |
|
|
|
|
| 804-10 |
reloading test piles
|
1   |
EACH |
2,500.00 |
2,500.00 |
500.00 |
500.00 |
|
|
|
|
| 804-11 |
redriving test piles
|
1   |
EACH |
200.00 |
200.00 |
500.00 |
500.00 |
|
|
|
|
| 804-12 |
loading permanent piles
|
1   |
EACH |
200.00 |
200.00 |
16,000.00 |
16,000.00 |
|
|
|
|
| 804-17 |
dynamic monitoring
|
3   |
EACH |
1,500.00 |
4,500.00 |
1,500.00 |
4,500.00 |
|
|
|
|
| 805-01-A |
class a concrete (pipe headwalls)
|
79.36 |
CUYD |
1,000.00 |
79,360.00 |
1,200.00 |
95,232.00 |
|
|
|
|
| 805-01-C |
class a concrete (retaining walls)
|
8.32 |
CUYD |
1,000.00 |
8,320.00 |
1,200.00 |
9,984.00 |
|
|
|
|
| 805-01-F |
class a concrete (bents)
|
179.08 |
CUYD |
750.00 |
134,310.00 |
1,000.00 |
179,080.00 |
|
|
|
|
| 805-03 |
class aa concrete
|
609.60 |
CUYD |
680.00 |
414,528.00 |
750.00 |
457,200.00 |
|
|
|
|
| 805-06 |
class r concrete
|
104.28 |
CUYD |
500.00 |
52,140.00 |
250.00 |
26,070.00 |
|
|
|
|
| 806-01 |
deformed reinforcing steel
|
143,890   |
LB |
1.00 |
143,890.00 |
1.00 |
143,890.00 |
|
|
|
|
| 810-05 |
pipe & concrete railing
|
318.67 |
LNFT |
300.00 |
95,601.00 |
250.00 |
79,667.50 |
|
|
|
|
| 813-01 |
concrete approach slabs
|
763.98 |
SQYD |
165.00 |
126,056.70 |
200.00 |
152,796.00 |
|
|
|
|
| S-002 |
relocating bench mark
|
1   |
EACH |
1,500.00 |
1,500.00 |
1,200.00 |
1,200.00 |
|
|
|
|
| S-003 |
saw cutting pcc pavement (6" thick)
|
239   |
LNFT |
6.00 |
1,434.00 |
12.00 |
2,868.00 |
|
|
|
|
| S-004 |
saw cutting pcc pavement (8" thick)
|
530   |
LNFT |
8.00 |
4,240.00 |
15.00 |
7,950.00 |
|
|
|
|
| S-005 |
mucking existing ditches
|
8,750   |
LNFT |
25.00 |
218,750.00 |
5.00 |
43,750.00 |
|
|
|
|
| S-007 |
temporary traffic maintenance asphaltic concrete
|
2,000.0 |
TON |
150.00 |
300,000.00 |
120.00 |
240,000.00 |
|
|
|
|
| S-008 |
internally illuminated street name signs
|
20   |
EACH |
4,000.00 |
80,000.00 |
4,800.00 |
96,000.00 |
|
|
|
|
| S-009 |
video detection system
|
4   |
EACH |
35,000.00 |
140,000.00 |
45,000.00 |
180,000.00 |
|
|
|
|
| S-010 |
unidirectional optical detector single channel
|
17   |
EACH |
600.00 |
10,200.00 |
775.00 |
13,175.00 |
|
|
|
|
| S-011 |
telephone service
|
1   |
EACH |
1,500.00 |
1,500.00 |
1,800.00 |
1,800.00 |
|
|
|
|
| S-012 |
thirty-six fiber (24 multi-mode and 12 single mode
fibers) (communication cable/fiber optic) |
14,200   |
LNFT |
3.70 |
52,540.00 |
4.75 |
67,450.00 |
|
|
|
|
| S-013 |
six fiber (4 multi-mode and 2 single mode fibers)
(communication drop cable / fiber optic) |
200   |
LNFT |
3.80 |
760.00 |
5.00 |
1,000.00 |
|
|
|
|
| S-014 |
temporary traffic signals
|
lump |
LUMP |
50,000.00 |
50,000.00 |
300,000.00 |
300,000.00 |
|
|
|
|
| S-101 |
dynamic analysis
|
3   |
EACH |
1,000.00 |
3,000.00 |
1,500.00 |
4,500.00 |
|
|
|
|
| S-102 |
impact attenuators (construction zone)
|
2   |
EACH |
30,000.00 |
60,000.00 |
26,000.00 |
52,000.00 |
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
27,479,245.31 |
|
32,223,208.80 |
|
|
|
|
|