| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - COVINGTON PAVING CO. |
- 2 - BARRIERE CONSTRUCTION CO., LLC. |
- 3 - BOH BROS. CONSTRUCTION CO., LLC. |
- 4 - HUEY STOCKSTILL, INC. |
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-02-H |
removal of guard rail
|
326   |
LNFT |
4.00 |
1,304.00 |
6.00 |
1,956.00 |
7.00 |
2,282.00 |
4.00 |
1,304.00 |
| 203-08 |
borrow (vehicular measurement)
|
200   |
CUYD |
18.00 |
3,600.00 |
32.00 |
6,400.00 |
15.00 |
3,000.00 |
32.00 |
6,400.00 |
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
313   |
CUYD |
30.00 |
9,390.00 |
1.00 |
313.00 |
60.00 |
18,780.00 |
26.00 |
8,138.00 |
| 502-01 |
superpave asphaltic concrete
|
2,387.9 |
TON |
67.04 |
160,084.82 |
85.00 |
202,971.50 |
80.00 |
191,032.00 |
80.00 |
191,032.00 |
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
333.0 |
TON |
83.00 |
27,639.00 |
10.00 |
3,330.00 |
100.00 |
33,300.00 |
132.00 |
43,956.00 |
| 509-01 |
cold planing asphaltic pavement
|
18,517   |
SQYD |
1.47 |
27,219.99 |
2.00 |
37,034.00 |
2.00 |
37,034.00 |
2.00 |
37,034.00 |
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 514   |
CUYD |
2.00 |
- 1,028.00 |
4.00 |
- 2,056.00 |
10.00 |
- 5,140.00 |
0.00 |
0.00 |
| 704-01-A |
guard rail (single thrie beam)(3'-1 1/2" post spacing)
|
200.0 |
LNFT |
33.00 |
6,600.00 |
60.00 |
12,000.00 |
47.00 |
9,400.00 |
30.00 |
6,000.00 |
| 704-01-B |
guard rail (single thrie beam)(6'-3" post spacing)
|
310.0 |
LNFT |
48.00 |
14,880.00 |
75.00 |
23,250.00 |
60.00 |
18,600.00 |
47.00 |
14,570.00 |
| 704-11-B |
guard rail end treatment (tangent)
|
8   |
EACH |
2,400.00 |
19,200.00 |
3,000.00 |
24,000.00 |
2,800.00 |
22,400.00 |
2,200.00 |
17,600.00 |
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
19,000.00 |
19,000.00 |
10,000.00 |
10,000.00 |
10,000.00 |
10,000.00 |
25,000.00 |
25,000.00 |
| 713-03-C |
temporary pavement markings (8" width)
|
80   |
LNFT |
0.44 |
35.20 |
1.00 |
80.00 |
0.10 |
8.00 |
0.10 |
8.00 |
| 713-03-E |
temporary pavement markings (24" width)
|
40   |
LNFT |
1.50 |
60.00 |
3.00 |
120.00 |
0.30 |
12.00 |
0.30 |
12.00 |
| 713-04-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
3.200 |
MILE |
300.00 |
960.00 |
200.00 |
640.00 |
0.10 |
0.32 |
150.00 |
480.00 |
| 713-04-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
0.920 |
MILE |
1.00 |
0.92 |
20.00 |
18.40 |
0.15 |
0.14 |
100.00 |
92.00 |
| 713-05-A |
temporary pavement markings (solid line)(4" width)
|
5.280 |
MILE |
1.00 |
5.28 |
40.00 |
211.20 |
0.20 |
1.06 |
200.00 |
1,056.00 |
| 713-06-D |
temporary pavement legends and symbols (rr crossing)
|
2   |
EACH |
1.00 |
2.00 |
270.00 |
540.00 |
10.00 |
20.00 |
150.00 |
300.00 |
| 724-01-B |
pavement patching (12" minimum thickness)
|
300   |
SQYD |
73.00 |
21,900.00 |
74.00 |
22,200.00 |
80.00 |
24,000.00 |
90.00 |
27,000.00 |
| 727-01 |
mobilization
|
lump |
LUMP |
26,000.00 |
26,000.00 |
40,000.00 |
40,000.00 |
43,000.00 |
43,000.00 |
47,000.00 |
47,000.00 |
| 729-16-C |
object marker assembly (type 3)
|
8   |
EACH |
77.00 |
616.00 |
90.00 |
720.00 |
75.00 |
600.00 |
70.00 |
560.00 |
| 731-02 |
reflectorized raised pavement markers
|
212   |
ea |
5.70 |
1,208.40 |
6.00 |
1,272.00 |
5.50 |
1,166.00 |
6.00 |
1,272.00 |
| 732-01-C |
plastic pavement striping (8" width)
|
40   |
LNFT |
1.00 |
40.00 |
3.00 |
120.00 |
1.00 |
40.00 |
1.00 |
40.00 |
| 732-01-E |
plastic pavement striping (24" width)
|
20   |
LNFT |
3.20 |
64.00 |
6.00 |
120.00 |
3.00 |
60.00 |
3.00 |
60.00 |
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
2.640 |
MILE |
2,600.00 |
6,864.00 |
3,000.00 |
7,920.00 |
2,500.00 |
6,600.00 |
2,500.00 |
6,600.00 |
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
0.460 |
MILE |
1,020.00 |
469.20 |
1,200.00 |
552.00 |
1,000.00 |
460.00 |
1,000.00 |
460.00 |
| 732-04-D |
plastic pavement legends & symbols (rr crossing)
|
1   |
EACH |
500.00 |
500.00 |
500.00 |
500.00 |
600.00 |
600.00 |
500.00 |
500.00 |
| 735-01 |
mailboxes
|
47   |
EACH |
10.00 |
470.00 |
7.00 |
329.00 |
5.00 |
235.00 |
5.00 |
235.00 |
| 735-02 |
mailbox supports (single)
|
47   |
EACH |
130.00 |
6,110.00 |
130.00 |
6,110.00 |
110.00 |
5,170.00 |
111.00 |
5,217.00 |
| 739-01 |
hydro-seeding
|
2.01 |
ACRE |
1,400.00 |
2,814.00 |
1,200.00 |
2,412.00 |
1,500.00 |
3,015.00 |
1,100.00 |
2,211.00 |
| 740-01 |
construction layout
|
lump |
LUMP |
6,000.00 |
6,000.00 |
7,000.00 |
7,000.00 |
3,000.00 |
3,000.00 |
6,000.00 |
6,000.00 |
| 744-01 |
traffic control management
|
lump |
LUMP |
8,000.00 |
8,000.00 |
11,000.00 |
11,000.00 |
2,000.00 |
2,000.00 |
15,000.00 |
15,000.00 |
| S-001 |
u-channel post installation
|
75   |
each |
50.00 |
3,750.00 |
70.00 |
5,250.00 |
45.00 |
3,375.00 |
45.00 |
3,375.00 |
| S-002 |
relocating ditches
|
100   |
LNFT |
25.00 |
2,500.00 |
8.00 |
800.00 |
10.00 |
1,000.00 |
30.00 |
3,000.00 |
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
376,258.81 |
|
427,113.10 |
|
435,050.52 |
|
471,512.00 |
|