Letting of 6/28/2006 LA DOTD Headquarters


 
go back
Go Back
 
Lead Project: 852-36-0002
Parish: ST TAMMANY
Routes: LA 41
Description: JCT. LA 41 - JCT. LA 3081
Type Const: cold planing, asphaltic concrete overlay, guard rail, perman ent signs, pavement
striping
Estimated Construction Cost: $333,309.15
 
RankLicenseBidderConstruction Bid
1 22040 COVINGTON PAVING CO. $376,258.81
2 06276 BARRIERE CONSTRUCTION CO., LLC. $427,113.10
3 02179 BOH BROS. CONSTRUCTION CO., LLC. $435,050.52
4 06487 HUEY STOCKSTILL, INC. $471,512.00
 
Item Number Item Description Quantity Unit of Measure - 1 -
COVINGTON PAVING CO.
- 2 -
BARRIERE CONSTRUCTION CO., LLC.
- 3 -
BOH BROS. CONSTRUCTION CO., LLC.
- 4 -
HUEY STOCKSTILL, INC.
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
202-02-H removal of guard rail 326      LNFT 4.00 1,304.00 6.00 1,956.00 7.00 2,282.00 4.00 1,304.00
203-08 borrow (vehicular measurement) 200      CUYD 18.00 3,600.00 32.00 6,400.00 15.00 3,000.00 32.00 6,400.00
401-02 aggregate surface course (adjusted vehicular
measurement)
313      CUYD 30.00 9,390.00 1.00 313.00 60.00 18,780.00 26.00 8,138.00
502-01 superpave asphaltic concrete 2,387.9    TON 67.04 160,084.82 85.00 202,971.50 80.00 191,032.00 80.00 191,032.00
502-01-A superpave asphaltic concrete, drives, turnouts and
miscellaneous
333.0    TON 83.00 27,639.00 10.00 3,330.00 100.00 33,300.00 132.00 43,956.00
509-01 cold planing asphaltic pavement 18,517      SQYD 1.47 27,219.99 2.00 37,034.00 2.00 37,034.00 2.00 37,034.00
509-02 contractor retained reclaimed asphaltic pavement - 514      CUYD 2.00 - 1,028.00 4.00 - 2,056.00 10.00 - 5,140.00 0.00 0.00
704-01-A guard rail (single thrie beam)(3'-1 1/2" post spacing) 200.0    LNFT 33.00 6,600.00 60.00 12,000.00 47.00 9,400.00 30.00 6,000.00
704-01-B guard rail (single thrie beam)(6'-3" post spacing) 310.0    LNFT 48.00 14,880.00 75.00 23,250.00 60.00 18,600.00 47.00 14,570.00
704-11-B guard rail end treatment (tangent) 8      EACH 2,400.00 19,200.00 3,000.00 24,000.00 2,800.00 22,400.00 2,200.00 17,600.00
713-01 temporary signs & barricades lump      LUMP 19,000.00 19,000.00 10,000.00 10,000.00 10,000.00 10,000.00 25,000.00 25,000.00
713-03-C temporary pavement markings (8" width) 80      LNFT 0.44 35.20 1.00 80.00 0.10 8.00 0.10 8.00
713-03-E temporary pavement markings (24" width) 40      LNFT 1.50 60.00 3.00 120.00 0.30 12.00 0.30 12.00
713-04-A temporary pavement markings (broken line)(4" width)(4'
length)
3.200  MILE 300.00 960.00 200.00 640.00 0.10 0.32 150.00 480.00
713-04-B temporary pavement markings (broken line)(4" width)
(10' length)
0.920  MILE 1.00 0.92 20.00 18.40 0.15 0.14 100.00 92.00
713-05-A temporary pavement markings (solid line)(4" width) 5.280  MILE 1.00 5.28 40.00 211.20 0.20 1.06 200.00 1,056.00
713-06-D temporary pavement legends and symbols (rr crossing) 2      EACH 1.00 2.00 270.00 540.00 10.00 20.00 150.00 300.00
724-01-B pavement patching (12" minimum thickness) 300      SQYD 73.00 21,900.00 74.00 22,200.00 80.00 24,000.00 90.00 27,000.00
727-01 mobilization lump      LUMP 26,000.00 26,000.00 40,000.00 40,000.00 43,000.00 43,000.00 47,000.00 47,000.00
729-16-C object marker assembly (type 3) 8      EACH 77.00 616.00 90.00 720.00 75.00 600.00 70.00 560.00
731-02 reflectorized raised pavement markers 212      ea 5.70 1,208.40 6.00 1,272.00 5.50 1,166.00 6.00 1,272.00
732-01-C plastic pavement striping (8" width) 40      LNFT 1.00 40.00 3.00 120.00 1.00 40.00 1.00 40.00
732-01-E plastic pavement striping (24" width) 20      LNFT 3.20 64.00 6.00 120.00 3.00 60.00 3.00 60.00
732-02-A plastic pavement striping (solid line) (4" width) 2.640  MILE 2,600.00 6,864.00 3,000.00 7,920.00 2,500.00 6,600.00 2,500.00 6,600.00
732-03-A plastic pavement striping (broken line)(4" width) 0.460  MILE 1,020.00 469.20 1,200.00 552.00 1,000.00 460.00 1,000.00 460.00
732-04-D plastic pavement legends & symbols (rr crossing) 1      EACH 500.00 500.00 500.00 500.00 600.00 600.00 500.00 500.00
735-01 mailboxes 47      EACH 10.00 470.00 7.00 329.00 5.00 235.00 5.00 235.00
735-02 mailbox supports (single) 47      EACH 130.00 6,110.00 130.00 6,110.00 110.00 5,170.00 111.00 5,217.00
739-01 hydro-seeding 2.01   ACRE 1,400.00 2,814.00 1,200.00 2,412.00 1,500.00 3,015.00 1,100.00 2,211.00
740-01 construction layout lump      LUMP 6,000.00 6,000.00 7,000.00 7,000.00 3,000.00 3,000.00 6,000.00 6,000.00
744-01 traffic control management lump      LUMP 8,000.00 8,000.00 11,000.00 11,000.00 2,000.00 2,000.00 15,000.00 15,000.00
S-001 u-channel post installation 75      each 50.00 3,750.00 70.00 5,250.00 45.00 3,375.00 45.00 3,375.00
S-002 relocating ditches 100      LNFT 25.00 2,500.00 8.00 800.00 10.00 1,000.00 30.00 3,000.00
                       
 CONTRACTOR TOTAL       376,258.81   427,113.10   435,050.52   471,512.00