Lead Project: 713-04-0001
Parish: ASSUMPTION
Routes:
Description: LEE DRIVE BRIDGE OVER BAYOU PIERRE PART
Type Const: grading, class ii base course, superpave asphaltic conc pavement, bridge superstructure
and substructure and related work.
Estimated Construction Cost: $465,789.65
 
RankLicenseBidderConstruction Bid
1 00481 COASTAL BRIDGE CO., L.L.C. $594,290.05
2 02179 BOH BROS. CONSTRUCTION CO., LLC. $699,030.55
 
Item Number Item Description Quantity Unit of Measure - 1 -
COASTAL BRIDGE CO., L.L.C.
- 2 -
BOH BROS. CONSTRUCTION CO., LLC.

 

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
201-01 clearing & grubbing lump      LUMP 3,000.00 3,000.00 10,000.00 10,000.00        
202-02-A-01 removal of bridge(sta. 16+04.42; 24.66' wide x
95.67'long timber bridge)
1      EACH 50,000.00 50,000.00 30,000.00 30,000.00        
203-05-A nonplastic embankment(stone)(adjusted vehicular
measurement)
68      CUYD 150.00 10,200.00 89.00 6,052.00        
203-06 excavation & embankment lump      LUMP 8,000.00 8,000.00 4,000.00 4,000.00        
204-02 temporary hay or straw bales 15      EACH 100.00 1,500.00 25.00 375.00        
302-01-A class ii base course(stone or rpccp) 112.9    CUYD 100.00 11,290.00 108.50 12,249.65        
402-01 traffic maintenance aggregate (vehicular measurement) 100.0    CUYD 40.00 4,000.00 80.00 8,000.00        
502-01 superpave asphaltic concrete 92.7    TON 150.00 13,905.00 176.00 16,315.20        
711-01-E riprap (130 lb,24" thick) 647      SQYD 95.00 61,465.00 71.60 46,325.20        
711-04 geotextile fabric 647      SQYD 3.00 1,941.00 2.60 1,682.20        
713-01 temporary signs & barricades lump      LUMP 12,000.00 12,000.00 15,000.00 15,000.00        
727-01 mobilization lump      LUMP 50,000.00 50,000.00 70,000.00 70,000.00        
729-16-C object marker assembly (type 3) 4      EACH 85.00 340.00 100.00 400.00        
740-01 construction layout lump      LUMP 14,000.00 14,000.00 30,000.00 30,000.00        
744-01 traffic control management lump      LUMP 5,000.00 5,000.00 2,500.00 2,500.00        
803-03 steel sheet pile wall 1,764      SQFT 30.00 52,920.00 28.35 50,009.40        
804-01-D precast concrete piles (18") 1,764      LNFT 68.00 119,952.00 98.35 173,489.40        
804-12 loading permanent piles 1      EACH 100.00 100.00 6,000.00 6,000.00        
805-10-A bridge superstructure & substructure(28'clear
roadway,90 degree crossing) (cast-in-place)
5      SPAN 31,000.00 155,000.00 37,000.00 185,000.00        
813-01-A concrete approach slabs(28'clear roadway,tapered
concrete barrier rails) (w/asphalt)
73.93   SQYD 185.00 13,677.05 250.00 18,482.50        
S-001 vibration monitoring lump      LUMP 5,000.00 5,000.00 12,500.00 12,500.00        
S-101 retroreflective sheet panels lump      LUMP 1,000.00 1,000.00 650.00 650.00        
                       
 CONTRACTOR TOTAL       594,290.05   699,030.55        