Letting of 6/28/2006 LA DOTD Headquarters


REBID
go back
Go Back
DBE GOAL FED
Lead Project: 157-03-0019
Parish: LINCOLN
Routes: LA 145
Description: LA 145 INTERCHANGE (BRIDGE WIDENING AND REDECKING)
Type Const: grading, cold planing asphaltic concrete, superpave asphaltic concrete pavement,
bridge widening and related work.
Estimated Construction Cost: $1,889,642.25
 
RankLicenseBidderConstruction Bid
1 34567 JAMES CONSTRUCTION GROUP LLC $2,403,946.00
2 09476 KEY CONSTRUCTORS, INC. $2,558,608.60
 
Item Number Item Description Quantity Unit of Measure - 1 -
JAMES CONSTRUCTION GROUP LLC
- 2 -
KEY CONSTRUCTORS, INC.

 

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
201-01 clearing & grubbing lump      LUMP 53,500.00 53,500.00 110,000.00 110,000.00        
202-02-A-01 removal of existing bridge deck (including 2" overlay),
rail and portions of abutment
lump      lump 135,000.00 135,000.00 105,000.00 105,000.00        
202-02-G removal of surfacing & stabilized base 125.0    SQYD 20.00 2,500.00 20.00 2,500.00        
202-02-H removal of guard rail 400      LNFT 5.00 2,000.00 4.00 1,600.00        
202-02-01 removal of existing approach slabs 125.0    SQYD 150.00 18,750.00 45.00 5,625.00        
202-02-02 removal of existing concrete revetment 1,163.0    SQYD 8.00 9,304.00 25.00 29,075.00        
203-06 excavation & embankment lump      LUMP 110,000.00 110,000.00 100,000.00 100,000.00        
204-02 temporary hay or straw bales 16      EACH 15.00 240.00 10.00 160.00        
204-05-A temporary sediment check dams (hay) 2      EACH 150.00 300.00 250.00 500.00        
204-06 temporary silt fencing 1,500      LNFT 3.00 4,500.00 3.50 5,250.00        
502-01 superpave asphaltic concrete 961.0    TON 133.00 127,813.00 135.00 129,735.00        
509-01 cold planing asphaltic pavement 1,427      SQYD 7.00 9,989.00 6.30 8,990.10        
509-02 contractor retained reclaimed asphaltic pavement - 40      CUYD 0.10 - 4.00 10.00 - 400.00        
701-05-G side drain pipe (18") 150      LNFT 45.00 6,750.00 45.00 6,750.00        
702-03-A catch basins (cb-01) 2      EACH 8,000.00 16,000.00 3,700.00 7,400.00        
704-03 blocked out guard rail 437.5    LNFT 19.00 8,312.50 17.50 7,656.25        
704-08-B guard rail transitions (double thrie beam) 100.0    LNFT 55.00 5,500.00 55.00 5,500.00        
704-11-A guard rail end treatment (flared) 4      EACH 2,000.00 8,000.00 2,000.00 8,000.00        
712-01-A concrete cast-in-place revetment (4" thick) 1,449      SQYD 42.00 60,858.00 42.00 60,858.00        
713-01 temporary signs & barricades lump      LUMP 38,350.00 38,350.00 35,000.00 35,000.00        
713-05-A temporary pavement markings (solid line)(4" width) 1.500  MILE 2,000.00 3,000.00 1,350.00 2,025.00        
713-09 temporary precast concrete barrier (department
furnished)
185      EACH 300.00 55,500.00 300.00 55,500.00        
716-01-A mulch (vegetative) 2.00   ACRE 1,500.00 3,000.00 1,500.00 3,000.00        
717-01 seeding 60      LB 30.00 1,800.00 7.00 420.00        
718-01 fertilizer 2,000      LB 1.00 2,000.00 0.50 1,000.00        
727-01 mobilization lump      LUMP 230,000.00 230,000.00 250,000.00 250,000.00        
729-16-C object marker assembly (type 3) 4      EACH 75.00 300.00 75.00 300.00        
731-01 nonreflectorized raised pavement markers 132      EACH 15.00 1,980.00 13.00 1,716.00        
731-02 reflectorized raised pavement markers 85      EACH 15.00 1,275.00 11.00 935.00        
732-02-A plastic pavement striping (solid line) (4" width) 0.833  MILE 3,500.00 2,915.50 2,950.00 2,457.35        
740-01 construction layout lump      LUMP 30,000.00 30,000.00 30,000.00 30,000.00        
744-01 traffic control management lump      LUMP 5,000.00 5,000.00 70,000.00 70,000.00        
804-01-B precast concrete piles (14") 320      LNFT 105.00 33,600.00 60.00 19,200.00        
804-01-D precast concrete piles (18") 170      LNFT 110.00 18,700.00 90.00 15,300.00        
804-12 loading permanent piles 1      EACH 2,000.00 2,000.00 1,000.00 1,000.00        
805-01-F class a concrete (bents) 59.19   CUYD 1,300.00 76,947.00 920.00 54,454.80        
805-01-J class a concrete (crashwall) 14.22   CUYD 1,500.00 21,330.00 1,120.00 15,926.40        
805-03 class aa concrete 343.45   CUYD 780.00 267,891.00 820.00 281,629.00        
805-11 strip seal joints 303.87   LNFT 125.00 37,983.75 210.00 63,812.70        
806-01 deformed reinforcing steel 70,711      LB 1.05 74,246.55 0.90 63,639.90        
806-02 deformed reinforcing steel (epoxy coated) 48,239      LB 1.10 53,062.90 1.10 53,062.90        
807-06 structural metalwork lump      LUMP 400,000.00 400,000.00 415,000.00 415,000.00        
810-01 concrete railing (barrier) 743.00   LNFT 40.00 29,720.00 55.00 40,865.00        
813-01 concrete approach slabs 356.66   SQYD 230.00 82,031.80 220.00 78,465.20        
814-01-E drilled shaft (48") 150.0    LNFT 680.00 102,000.00 900.00 135,000.00        
814-02-E test hole (48") 25.0    LNFT 800.00 20,000.00 900.00 22,500.00        
814-04-E crosshole sonic logging (48") 6      EACH 5,000.00 30,000.00 3,700.00 22,200.00        
S-001 temporary traffic signal (solar operated) 2      ea 30,000.00 60,000.00 45,000.00 90,000.00        
S-002 impact attenuator (construction zone) 7      ea 20,000.00 140,000.00 20,000.00 140,000.00        
                       
 CONTRACTOR TOTAL       2,403,946.00   2,558,608.60        