| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - JAMES CONSTRUCTION GROUP LLC |
- 2 - KEY CONSTRUCTORS, INC. |
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 201-01 |
clearing & grubbing
|
lump |
LUMP |
53,500.00 |
53,500.00 |
110,000.00 |
110,000.00 |
|
|
|
|
| 202-02-A-01 |
removal of existing bridge deck (including 2" overlay),
rail and portions of abutment |
lump |
lump |
135,000.00 |
135,000.00 |
105,000.00 |
105,000.00 |
|
|
|
|
| 202-02-G |
removal of surfacing & stabilized base
|
125.0 |
SQYD |
20.00 |
2,500.00 |
20.00 |
2,500.00 |
|
|
|
|
| 202-02-H |
removal of guard rail
|
400   |
LNFT |
5.00 |
2,000.00 |
4.00 |
1,600.00 |
|
|
|
|
| 202-02-01 |
removal of existing approach slabs
|
125.0 |
SQYD |
150.00 |
18,750.00 |
45.00 |
5,625.00 |
|
|
|
|
| 202-02-02 |
removal of existing concrete revetment
|
1,163.0 |
SQYD |
8.00 |
9,304.00 |
25.00 |
29,075.00 |
|
|
|
|
| 203-06 |
excavation & embankment
|
lump |
LUMP |
110,000.00 |
110,000.00 |
100,000.00 |
100,000.00 |
|
|
|
|
| 204-02 |
temporary hay or straw bales
|
16   |
EACH |
15.00 |
240.00 |
10.00 |
160.00 |
|
|
|
|
| 204-05-A |
temporary sediment check dams (hay)
|
2   |
EACH |
150.00 |
300.00 |
250.00 |
500.00 |
|
|
|
|
| 204-06 |
temporary silt fencing
|
1,500   |
LNFT |
3.00 |
4,500.00 |
3.50 |
5,250.00 |
|
|
|
|
| 502-01 |
superpave asphaltic concrete
|
961.0 |
TON |
133.00 |
127,813.00 |
135.00 |
129,735.00 |
|
|
|
|
| 509-01 |
cold planing asphaltic pavement
|
1,427   |
SQYD |
7.00 |
9,989.00 |
6.30 |
8,990.10 |
|
|
|
|
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 40   |
CUYD |
0.10 |
- 4.00 |
10.00 |
- 400.00 |
|
|
|
|
| 701-05-G |
side drain pipe (18")
|
150   |
LNFT |
45.00 |
6,750.00 |
45.00 |
6,750.00 |
|
|
|
|
| 702-03-A |
catch basins (cb-01)
|
2   |
EACH |
8,000.00 |
16,000.00 |
3,700.00 |
7,400.00 |
|
|
|
|
| 704-03 |
blocked out guard rail
|
437.5 |
LNFT |
19.00 |
8,312.50 |
17.50 |
7,656.25 |
|
|
|
|
| 704-08-B |
guard rail transitions (double thrie beam)
|
100.0 |
LNFT |
55.00 |
5,500.00 |
55.00 |
5,500.00 |
|
|
|
|
| 704-11-A |
guard rail end treatment (flared)
|
4   |
EACH |
2,000.00 |
8,000.00 |
2,000.00 |
8,000.00 |
|
|
|
|
| 712-01-A |
concrete cast-in-place revetment (4" thick)
|
1,449   |
SQYD |
42.00 |
60,858.00 |
42.00 |
60,858.00 |
|
|
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
38,350.00 |
38,350.00 |
35,000.00 |
35,000.00 |
|
|
|
|
| 713-05-A |
temporary pavement markings (solid line)(4" width)
|
1.500 |
MILE |
2,000.00 |
3,000.00 |
1,350.00 |
2,025.00 |
|
|
|
|
| 713-09 |
temporary precast concrete barrier (department
furnished) |
185   |
EACH |
300.00 |
55,500.00 |
300.00 |
55,500.00 |
|
|
|
|
| 716-01-A |
mulch (vegetative)
|
2.00 |
ACRE |
1,500.00 |
3,000.00 |
1,500.00 |
3,000.00 |
|
|
|
|
| 717-01 |
seeding
|
60   |
LB |
30.00 |
1,800.00 |
7.00 |
420.00 |
|
|
|
|
| 718-01 |
fertilizer
|
2,000   |
LB |
1.00 |
2,000.00 |
0.50 |
1,000.00 |
|
|
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
230,000.00 |
230,000.00 |
250,000.00 |
250,000.00 |
|
|
|
|
| 729-16-C |
object marker assembly (type 3)
|
4   |
EACH |
75.00 |
300.00 |
75.00 |
300.00 |
|
|
|
|
| 731-01 |
nonreflectorized raised pavement markers
|
132   |
EACH |
15.00 |
1,980.00 |
13.00 |
1,716.00 |
|
|
|
|
| 731-02 |
reflectorized raised pavement markers
|
85   |
EACH |
15.00 |
1,275.00 |
11.00 |
935.00 |
|
|
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
0.833 |
MILE |
3,500.00 |
2,915.50 |
2,950.00 |
2,457.35 |
|
|
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
30,000.00 |
30,000.00 |
30,000.00 |
30,000.00 |
|
|
|
|
| 744-01 |
traffic control management
|
lump |
LUMP |
5,000.00 |
5,000.00 |
70,000.00 |
70,000.00 |
|
|
|
|
| 804-01-B |
precast concrete piles (14")
|
320   |
LNFT |
105.00 |
33,600.00 |
60.00 |
19,200.00 |
|
|
|
|
| 804-01-D |
precast concrete piles (18")
|
170   |
LNFT |
110.00 |
18,700.00 |
90.00 |
15,300.00 |
|
|
|
|
| 804-12 |
loading permanent piles
|
1   |
EACH |
2,000.00 |
2,000.00 |
1,000.00 |
1,000.00 |
|
|
|
|
| 805-01-F |
class a concrete (bents)
|
59.19 |
CUYD |
1,300.00 |
76,947.00 |
920.00 |
54,454.80 |
|
|
|
|
| 805-01-J |
class a concrete (crashwall)
|
14.22 |
CUYD |
1,500.00 |
21,330.00 |
1,120.00 |
15,926.40 |
|
|
|
|
| 805-03 |
class aa concrete
|
343.45 |
CUYD |
780.00 |
267,891.00 |
820.00 |
281,629.00 |
|
|
|
|
| 805-11 |
strip seal joints
|
303.87 |
LNFT |
125.00 |
37,983.75 |
210.00 |
63,812.70 |
|
|
|
|
| 806-01 |
deformed reinforcing steel
|
70,711   |
LB |
1.05 |
74,246.55 |
0.90 |
63,639.90 |
|
|
|
|
| 806-02 |
deformed reinforcing steel (epoxy coated)
|
48,239   |
LB |
1.10 |
53,062.90 |
1.10 |
53,062.90 |
|
|
|
|
| 807-06 |
structural metalwork
|
lump |
LUMP |
400,000.00 |
400,000.00 |
415,000.00 |
415,000.00 |
|
|
|
|
| 810-01 |
concrete railing (barrier)
|
743.00 |
LNFT |
40.00 |
29,720.00 |
55.00 |
40,865.00 |
|
|
|
|
| 813-01 |
concrete approach slabs
|
356.66 |
SQYD |
230.00 |
82,031.80 |
220.00 |
78,465.20 |
|
|
|
|
| 814-01-E |
drilled shaft (48")
|
150.0 |
LNFT |
680.00 |
102,000.00 |
900.00 |
135,000.00 |
|
|
|
|
| 814-02-E |
test hole (48")
|
25.0 |
LNFT |
800.00 |
20,000.00 |
900.00 |
22,500.00 |
|
|
|
|
| 814-04-E |
crosshole sonic logging (48")
|
6   |
EACH |
5,000.00 |
30,000.00 |
3,700.00 |
22,200.00 |
|
|
|
|
| S-001 |
temporary traffic signal (solar operated)
|
2   |
ea |
30,000.00 |
60,000.00 |
45,000.00 |
90,000.00 |
|
|
|
|
| S-002 |
impact attenuator (construction zone)
|
7   |
ea |
20,000.00 |
140,000.00 |
20,000.00 |
140,000.00 |
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
2,403,946.00 |
|
2,558,608.60 |
|
|
|
|
|