Letting of 6/28/2006 LA DOTD Headquarters


 
go back
Go Back
 
Lead Project: 119-01-0010
Parish: NATCHITOCHES
Routes: LA 119
Description: LA 119 SURFACE TREATMENT (CM)
Type Const: two application surface treatment
Estimated Construction Cost: $401,939.40
 
RankLicenseBidderConstruction Bid
1 14422 T. L. WALLACE CONSTRUCTION, INC. $420,996.80
2 35378 P.R. PARKER COMPANY INC $457,043.60
3 30339 MISSOURI PETROLEUM PRODUCTS CO. LLC $480,201.60
 
Item Number Item Description Quantity Unit of Measure - 1 -
T. L. WALLACE CONSTRUCTION, INC.
- 2 -
P.R. PARKER COMPANY INC
- 3 -
MISSOURI PETROLEUM PRODUCTS CO. LLC

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
507-01-B asphaltic surface treatment (2 applications) 139,050      SQYD 2.55 354,577.50 2.63 365,701.50 2.99 415,759.50    
713-01 temporary signs & barricades lump      LUMP 10,000.00 10,000.00 8,400.00 8,400.00 7,000.00 7,000.00    
713-04-B temporary pavement markings (broken line)(4" width)
(10' length)
10.151  MILE 250.00 2,537.75 200.00 2,030.20 200.00 2,030.20    
713-05-A temporary pavement markings (solid line)(4" width) 33.588  MILE 550.00 18,473.40 450.00 15,114.60 450.00 15,114.60    
713-07-A temporary reflectorized raised pavement markers (tabs) 4,825      EACH 1.00 4,825.00 0.50 2,412.50 0.50 2,412.50    
727-01 mobilization lump      LUMP 5,000.00 5,000.00 45,000.00 45,000.00 18,000.00 18,000.00    
732-01-E plastic pavement striping (24" width) 24      LNFT 3.00 72.00 10.00 240.00 10.00 240.00    
737-01-A painted traffic striping (solid line)(4" width) 33.588  MILE 550.00 18,473.40 450.00 15,114.60 450.00 15,114.60    
737-02-A painted traffic striping (broken line)(4" width) 10.151  MILE 250.00 2,537.75 200.00 2,030.20 200.00 2,030.20    
740-01 construction layout lump      LUMP 2,500.00 2,500.00 100.00 100.00 500.00 500.00    
744-01 traffic control management lump      LUMP 2,000.00 2,000.00 900.00 900.00 2,000.00 2,000.00    
                       
 CONTRACTOR TOTAL       420,996.80   457,043.60   480,201.60    