| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - H & S CONSTRUCTION CO., INC. |
|
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 201-01 |
clearing & grubbing
|
lump |
LUMP |
65,000.00 |
65,000.00 |
|
|
|
|
|
|
| 202-01 |
removal of structures & obstructions
|
lump |
LUMP |
40,000.00 |
40,000.00 |
|
|
|
|
|
|
| 202-02-A-01 |
removal of bridge (sta. 108+75; 20' x 23' timber
trestle bridge) str # 2380204541 |
1   |
EACH |
15,000.00 |
15,000.00 |
|
|
|
|
|
|
| 202-02-A-02 |
removal of bridge (sta. 208+91; 39' x 25' timber
trestle bridge, with modified steel bents) str # 2380205161 |
1   |
EACH |
25,000.00 |
25,000.00 |
|
|
|
|
|
|
| 202-02-D |
removal of concrete walks & drives
|
20   |
SQYD |
60.00 |
1,200.00 |
|
|
|
|
|
|
| 202-02-G |
removal of surfacing & stabilized base
|
91.5 |
SQYD |
20.00 |
1,830.00 |
|
|
|
|
|
|
| 202-02-H |
removal of guard rail
|
705   |
LNFT |
6.00 |
4,230.00 |
|
|
|
|
|
|
| 203-06 |
excavation and embankment
|
lump |
LUMP |
80,000.00 |
80,000.00 |
|
|
|
|
|
|
| 204-02 |
temporary hay or straw bales
|
32   |
EACH |
16.00 |
512.00 |
|
|
|
|
|
|
| 204-05-A |
temporary sediment check dams (hay)
|
4   |
EACH |
200.00 |
800.00 |
|
|
|
|
|
|
| 204-06 |
temporary silt fencing
|
625   |
LNFT |
6.50 |
4,062.50 |
|
|
|
|
|
|
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
113   |
CUYD |
100.00 |
11,300.00 |
|
|
|
|
|
|
| 502-01 |
superpave asphaltic concrete
|
797.8 |
TON |
100.00 |
79,780.00 |
|
|
|
|
|
|
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
56.0 |
TON |
140.00 |
7,840.00 |
|
|
|
|
|
|
| 509-01 |
cold planing asphaltic pavement
|
342   |
SQYD |
15.00 |
5,130.00 |
|
|
|
|
|
|
| 701-01-Q |
cross drain pipe (60" rcp/pcp)
|
279   |
LNFT |
445.00 |
124,155.00 |
|
|
|
|
|
|
| 701-03-G |
storm drain pipe (18" rcp/pcp)
|
338   |
LNFT |
65.00 |
21,970.00 |
|
|
|
|
|
|
| 701-03-I |
storm drain pipe (24" rcp/pcp)
|
76   |
LNFT |
68.00 |
5,168.00 |
|
|
|
|
|
|
| 701-05-G |
side drain pipe (18" rcp/pcp)
|
202   |
LNFT |
52.00 |
10,504.00 |
|
|
|
|
|
|
| 701-05-I |
side drain pipe (24" rcp/pcp)
|
6   |
LNFT |
68.00 |
408.00 |
|
|
|
|
|
|
| 701-05-P |
side drain pipe (54" rcp/pcp)
|
24   |
LNFT |
210.00 |
5,040.00 |
|
|
|
|
|
|
| 701-15 |
concrete collar
|
3   |
EACH |
1,200.00 |
3,600.00 |
|
|
|
|
|
|
| 702-02-A |
manholes (mh-06)
|
1   |
EACH |
5,000.00 |
5,000.00 |
|
|
|
|
|
|
| 702-03-A |
catch basins (cb-01)
|
4   |
EACH |
3,000.00 |
12,000.00 |
|
|
|
|
|
|
| 702-08-A |
side drain safety end (type 1)
|
2   |
EACH |
2,600.00 |
5,200.00 |
|
|
|
|
|
|
| 705-01 |
barbed wire fence
|
200   |
LNFT |
12.00 |
2,400.00 |
|
|
|
|
|
|
| 706-03-C |
incidental concrete paving (6" thick)
|
20.0 |
SQYD |
50.00 |
1,000.00 |
|
|
|
|
|
|
| 708-01 |
right-of-way monument
|
14   |
EACH |
200.00 |
2,800.00 |
|
|
|
|
|
|
| 708-02 |
right-of-way monument witness post
|
14   |
EACH |
250.00 |
3,500.00 |
|
|
|
|
|
|
| 712-02-A |
sacked concrete revetment & toewall
|
100   |
SQYD |
100.00 |
10,000.00 |
|
|
|
|
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
30,000.00 |
30,000.00 |
|
|
|
|
|
|
| 717-01 |
seeding
|
8   |
LB |
12.00 |
96.00 |
|
|
|
|
|
|
| 718-01 |
fertilizer
|
271   |
LB |
0.65 |
176.15 |
|
|
|
|
|
|
| 722-01 |
project site laboratory
|
1   |
EACH |
10,000.00 |
10,000.00 |
|
|
|
|
|
|
| 724-01-B |
pavement patching (12" minimum thickness)
|
250   |
SQYD |
104.00 |
26,000.00 |
|
|
|
|
|
|
| 724-02 |
pavement widening
|
90.0 |
SQYD |
100.00 |
9,000.00 |
|
|
|
|
|
|
| 726-01 |
bedding material
|
186.0 |
CUYD |
70.00 |
13,020.00 |
|
|
|
|
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
75,000.00 |
75,000.00 |
|
|
|
|
|
|
| 729-16-B |
object marker assembly (type 2)
|
6   |
EACH |
85.00 |
510.00 |
|
|
|
|
|
|
| 731-02 |
reflectorized raised pavement markers
|
27   |
EACH |
15.00 |
405.00 |
|
|
|
|
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
0.376 |
MILE |
3,500.00 |
1,316.00 |
|
|
|
|
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
0.188 |
MILE |
3,500.00 |
658.00 |
|
|
|
|
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
28,000.00 |
28,000.00 |
|
|
|
|
|
|
| 744-01 |
traffic control management
|
lump |
LUMP |
35,000.00 |
35,000.00 |
|
|
|
|
|
|
| 805-01-B |
class a concrete (box culvert headwalls)
|
26.64 |
CUYD |
1,100.00 |
29,304.00 |
|
|
|
|
|
|
| 805-12-M-01 |
reinforced concrete box culverts (6'x 6') (precast)
|
344.0 |
LNFT |
600.00 |
206,400.00 |
|
|
|
|
|
|
| 806-01 |
deformed reinforcing steel
|
2,528   |
LB |
1.75 |
4,424.00 |
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
1,023,738.65 |
|
|
|
|
|
|
|