Letting of 6/28/2006 LA DOTD Headquarters


 
go back
Go Back
DBE GOAL FED
Lead Project: 249-01-0045
Parish: JEFFERSON
Routes: LA 45
Description: LA HIGHWAY 45 (BARATARIA BOULEVARD) AND PATRIOT STREET
Type Const: grading, draninge structures, cold planing ac pavement, superpave ac overlay, pccp,
traffic signalization, water distribution system, sanitary sewer system and related work.
Estimated Construction Cost: $4,921,051.05
Maximum Number of Days Allowed for Construction: 400
Calculated Daily User Cost: $15,000.00
 
RankLicenseBidderConstruction Bid Bidder's Proposed
Contract Time
Total Bid
1 24901 HARD ROCK CONSTRUCTION CO. $6,226,689.99 240 $9,826,689.99
2 06276 BARRIERE CONSTRUCTION CO., LLC. $6,489,635.50 310 $11,139,635.50
3 02179 BOH BROS. CONSTRUCTION CO., LLC. $6,579,891.95 325 $11,454,891.95
 
Item Number Item Description Quantity Unit of Measure - 1 -
HARD ROCK CONSTRUCTION CO.
- 2 -
BARRIERE CONSTRUCTION CO., LLC.
- 3 -
BOH BROS. CONSTRUCTION CO., LLC.

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
201-01 clearing & grubbing lump      LUMP 100,000.00 100,000.00 5,000.00 5,000.00 5,000.00 5,000.00    
202-01 removal of structures & obstructions lump      LUMP 100,000.00 100,000.00 2,000.00 2,000.00 10,000.00 10,000.00    
202-02-C removal of portland cement concrete pavement 1,379      SQYD 10.00 13,790.00 7.00 9,653.00 15.00 20,685.00    
202-02-D removal of concrete walks & drives 188      SQYD 10.00 1,880.00 19.00 3,572.00 16.00 3,008.00    
202-02-E removal of concrete curbs 4,150.0    LNFT 10.00 41,500.00 2.50 10,375.00 4.00 16,600.00    
202-02-I removal of asphaltic concrete pavement (thickness
varies)
184.7    SQYD 10.00 1,847.00 14.00 2,585.80 12.00 2,216.40    
202-02-J removal of concrete headwall, wingwall and apron of
box culvert
lump      LUMP 20,000.00 20,000.00 30,000.00 30,000.00 3,500.00 3,500.00    
202-02-K removal of existing traffic signal equipment and
related items
lump      LUMP 7,000.00 7,000.00 8,000.00 8,000.00 7,500.00 7,500.00    
203-01 general excavation 7,000      CUYD 15.00 105,000.00 14.00 98,000.00 10.00 70,000.00    
203-04 embankment 840      CUYD 20.00 16,800.00 24.00 20,160.00 30.00 25,200.00    
203-06 excavation & embankment lump      LUMP 200,000.00 200,000.00 125,000.00 125,000.00 195,000.00 195,000.00    
204-02 temporary hay or straw bales 49      EACH 8.00 392.00 30.00 1,470.00 10.00 490.00    
302-02-D class ii base course (12" thick) 6,763.1    SQYD 25.00 169,077.50 29.00 196,129.90 22.00 148,788.20    
302-02-E class ii base course (8" thick) 7,780.0    SQYD 20.00 155,600.00 21.00 163,380.00 22.00 171,160.00    
304-01 lime 23.97   TON 175.00 4,194.75 100.00 2,397.00 100.00 2,397.00    
304-04-D lime treatment (type d) (12" thick) 1,691      SQYD 4.00 6,764.00 3.00 5,073.00 6.00 10,146.00    
305-01-A subgrade layer (12" thick) (sand) (net section) 6,830      SQYD 15.00 102,450.00 5.00 34,150.00 13.00 88,790.00    
305-01-B subgrade layer (18" thick) (sand) (net section) 950      SQYD 15.00 14,250.00 6.00 5,700.00 18.00 17,100.00    
402-01 traffic maintenance aggregate (vehicular measurement) 500.0    CUYD 47.00 23,500.00 65.00 32,500.00 35.00 17,500.00    
502-01 superpave asphaltic concrete 631.0    TON 90.00 56,790.00 100.00 63,100.00 140.00 88,340.00    
509-01 cold planing asphaltic pavement 1,800      SQYD 4.00 7,200.00 4.00 7,200.00 6.00 10,800.00    
509-02 contractor retained reclaimed asphaltic pavement - 100      CUYD 1.00 - 100.00 1.30 - 130.00 5.00 - 500.00    
601-01-I portland cement concrete pavement (9" thick) 6,688.9    SQYD 60.00 401,334.00 62.00 414,711.80 75.00 501,667.50    
601-01-K portland cement concrete pavement (10" thick) 6,400.0    SQYD 65.00 416,000.00 64.00 409,600.00 80.00 512,000.00    
701-03-F storm drain pipe (15" rcp/pcp) 298      LNFT 80.00 23,840.00 100.00 29,800.00 130.00 38,740.00    
701-03-G storm drain pipe (18" rcp) 52      LNFT 90.00 4,680.00 250.00 13,000.00 160.00 8,320.00    
701-03-I storm drain pipe (24" rcp/pcp) 38      LNFT 150.00 5,700.00 160.00 6,080.00 250.00 9,500.00    
701-03-K storm drain pipe (30" rcp/pcp) 40      LNFT 160.00 6,400.00 220.00 8,800.00 275.00 11,000.00    
702-02-I j. p. p. w. drain manholes 4      EACH 3,000.00 12,000.00 9,900.00 39,600.00 7,300.00 29,200.00    
702-03-C catch basins (cb-06) 1      EACH 3,000.00 3,000.00 5,100.00 5,100.00 6,000.00 6,000.00    
702-03-D catch basins (cb-07) 2      EACH 3,000.00 6,000.00 3,000.00 6,000.00 7,000.00 14,000.00    
702-03-G catch basins (cb-09) 4      EACH 4,000.00 16,000.00 3,700.00 14,800.00 8,000.00 32,000.00    
702-03-I drop inlet (24" x 30", per j. p. p. w. drainage
standard detail)
4      EACH 2,000.00 8,000.00 3,400.00 13,600.00 2,800.00 11,200.00    
702-04-A adjusting manholes 6      EACH 200.00 1,200.00 700.00 4,200.00 600.00 3,600.00    
702-04-D adjusting drop inlets 1      EACH 300.00 300.00 1,100.00 1,100.00 600.00 600.00    
704-03 blocked out guard rail 490.0    LNFT 18.00 8,820.00 22.00 10,780.00 20.00 9,800.00    
704-05 guard rail anchor sections (bct) 30.0    LNFT 75.00 2,250.00 90.00 2,700.00 80.00 2,400.00    
704-08 guard rail transitions 30.0    LNFT 60.00 1,800.00 70.00 2,100.00 65.00 1,950.00    
706-01-A concrete walk (4" thick) 159.0    SQYD 60.00 9,540.00 55.00 8,745.00 60.00 9,540.00    
706-01-A-01 concrete walk (4" thick) (handicap ramp) 41.0    SQYD 100.00 4,100.00 145.00 5,945.00 150.00 6,150.00    
706-02-D concrete drive (8" thick) 100.0    SQYD 60.00 6,000.00 85.00 8,500.00 70.00 7,000.00    
706-03-B incidental concrete paving (5" thick) 130.0    SQYD 60.00 7,800.00 55.00 7,150.00 80.00 10,400.00    
707-01 concrete curb 8,688.0    LNFT 7.00 60,816.00 11.00 95,568.00 9.00 78,192.00    
707-03 combination concrete curb & gutter 560.0    LNFT 20.00 11,200.00 26.00 14,560.00 32.00 17,920.00    
712-02 sacked concrete revetment 1,200      SQYD 6.00 7,200.00 43.00 51,600.00 40.00 48,000.00    
713-01 temporary signs & barricades lump      LUMP 50,000.00 50,000.00 65,000.00 65,000.00 135,000.00 135,000.00    
713-04-B-02 temporary pvmt. markings (broken line) (4" width) (10'
length / 30' slip) (white)
0.800  MILE 475.00 380.00 550.00 440.00 500.00 400.00    
713-05-A-02 temporary pavement markings (solid line) (4" width)
(white)
0.382  MILE 895.00 341.89 1,000.00 382.00 950.00 362.90    
713-05-A-03 temporary pavement markings (solid line) (4" width)
(yellow)
1.300  MILE 895.00 1,163.50 1,000.00 1,300.00 950.00 1,235.00    
713-05-C-01 temporary pavement markings (solid line) (8" width)
(white)
0.023  MILE 1,700.00 39.10 2,100.00 48.30 1,600.00 36.80    
714-01 slab sodding 140      SQYD 7.00 980.00 8.00 1,120.00 5.00 700.00    
715-01 topsoil 206      CUYD 30.00 6,180.00 35.00 7,210.00 40.00 8,240.00    
717-01 seeding 63      LB 8.00 504.00 8.00 504.00 4.00 252.00    
718-01 fertilizer 1,574      LB 1.00 1,574.00 0.60 944.40 0.50 787.00    
719-04 landscaping lump      LUMP 20,000.00 20,000.00 40,000.00 40,000.00 38,000.00 38,000.00    
722-01 project site laboratory 1.00   EACH 20,000.00 20,000.00 45,000.00 45,000.00 5,000.00 5,000.00    
726-01 bedding material 298.0    CUYD 50.00 14,900.00 55.00 16,390.00 77.00 22,946.00    
727-01 mobilization lump      LUMP 265,000.00 265,000.00 150,000.00 150,000.00 650,000.00 650,000.00    
729-01 sign (type a) 84.5    SQFT 37.00 3,126.50 40.00 3,380.00 40.00 3,380.00    
731-02 reflectorized raised pavement markers 800      EACH 5.00 4,000.00 6.00 4,800.00 5.50 4,400.00    
732-01-C plastic pavement striping (8" width) 560      LNFT 1.00 560.00 1.00 560.00 1.00 560.00    
732-01-E plastic pavement striping (24" width) 275      LNFT 3.00 825.00 3.50 962.50 3.00 825.00    
732-02-A plastic pavement striping (solid line) (4" width) 2.666  MILE 2,395.00 6,385.07 2,900.00 7,731.40 2,500.00 6,665.00    
732-02-C plastic pavement striping (solid line) (8" width) 0.216  MILE 4,790.00 1,034.64 5,900.00 1,274.40 5,000.00 1,080.00    
732-02-E plastic pavement striping (solid line) (24" width) 0.054  MILE 14,370.00 775.98 17,000.00 918.00 15,000.00 810.00    
732-03-A plastic pavement striping (broken line) (4" width) 2.880  MILE 2,492.00 7,176.96 3,000.00 8,640.00 2,700.00 7,776.00    
732-03-A-04 plastic pavement striping (broken line) (4" width) (4'
length & 2' space)
0.087  MILE 2,492.00 216.80 3,000.00 261.00 2,800.00 243.60    
732-04-A plastic pavement legends & symbols (arrow) 17      EACH 145.00 2,465.00 170.00 2,890.00 160.00 2,720.00    
732-04-C plastic pavement legends & symbols (only) 5      EACH 155.00 775.00 190.00 950.00 170.00 850.00    
732-05 removal of existing markings 0.440  MILE 5,700.00 2,508.00 7,000.00 3,080.00 6,000.00 2,640.00    
736-01 trenching and backfilling 6,255      LNFT 4.40 27,522.00 5.00 31,275.00 4.75 29,711.25    
736-03-A jacked or bored conduit (2" hdpe) 225      LNFT 15.50 3,487.50 19.00 4,275.00 17.00 3,825.00    
736-03-B jacked or bored conduit (2" p.e.c.) 320      LNFT 15.50 4,960.00 19.00 6,080.00 17.00 5,440.00    
736-03-C jacked or bored conduit (3" hdpe) 285      LNFT 18.50 5,272.50 22.00 6,270.00 20.00 5,700.00    
736-03-D jacked or bored conduit (3" p.e.c.) 230      LNFT 18.50 4,255.00 22.00 5,060.00 20.00 4,600.00    
736-04-A signal support (40' single mast arm) 3      EACH 8,245.00 24,735.00 10,000.00 30,000.00 9,000.00 27,000.00    
736-04-B signal support (40'/50' double mast arm) 1      EACH 12,105.00 12,105.00 15,000.00 15,000.00 13,000.00 13,000.00    
736-04-C signal support (pedestal pole) 2      EACH 1,375.00 2,750.00 1,700.00 3,400.00 1,500.00 3,000.00    
736-04-D signal support (30' strain pole) 4      EACH 9,500.00 38,000.00 11,500.00 46,000.00 1,300.00 5,200.00    
736-05-A-01 signal heads (3-section, 12" led) (r,y,g) 14      EACH 905.00 12,670.00 1,100.00 15,400.00 1,000.00 14,000.00    
736-05-A-02 signal heads (3-section, 12" led) (r,y(arrow),g(arrow)) 3      EACH 782.00 2,346.00 900.00 2,700.00 800.00 2,400.00    
736-05-A-03 signal heads (4-section, 12" led) (r,y,g(arrow),g) 2      EACH 1,203.00 2,406.00 1,400.00 2,800.00 1,300.00 2,600.00    
736-05-B signal heads (pedestrian, walk, don't walk symbol) 4      EACH 755.00 3,020.00 900.00 3,600.00 800.00 3,200.00    
736-06 signal service 3      EACH 1,200.00 3,600.00 1,400.00 4,200.00 1,300.00 3,900.00    
736-08-A signal controller (8 phase fully actuated) 1      EACH 20,332.00 20,332.00 25,000.00 25,000.00 21,000.00 21,000.00    
736-08-B signal controller (nema 8 phase, type 6 base mounted
cabinet)
2      EACH 22,792.00 45,584.00 28,000.00 56,000.00 23,000.00 46,000.00    
736-09 loop detector 1,815      LNFT 10.50 19,057.50 13.00 23,595.00 11.00 19,965.00    
736-10-A underground junction box (type d) 3      EACH 340.00 1,020.00 400.00 1,200.00 350.00 1,050.00    
736-10-B underground junction box (type e) 29      EACH 358.00 10,382.00 400.00 11,600.00 400.00 11,600.00    
736-10-C underground junction box (type f) 26      EACH 458.00 11,908.00 550.00 14,300.00 500.00 13,000.00    
736-10-D underground junction box (type h) 3      EACH 834.00 2,502.00 1,000.00 3,000.00 900.00 2,700.00    
736-11-A conduit (2" hdpe) 2,600      LNFT 4.00 10,400.00 5.00 13,000.00 4.25 11,050.00    
736-11-B conduit (2" p.e.c.) 3,380      LNFT 4.00 13,520.00 5.00 16,900.00 4.25 14,365.00    
736-11-C conduit (3" hdpe) 120      LNFT 8.50 1,020.00 10.00 1,200.00 9.00 1,080.00    
736-11-D conduit (3" p.e.c.) 230      LNFT 8.50 1,955.00 10.00 2,300.00 9.00 2,070.00    
736-11-E conduit (4" multiduct with 3 each 1-1/2" innerducts) 2,800      LNFT 11.00 30,800.00 14.00 39,200.00 12.00 33,600.00    
736-12-A conductor, 2c (loop lead in #16 awg) 550      LNFT 1.25 687.50 1.50 825.00 1.50 825.00    
736-12-B conductor, 3c (power, 6 gauge / #6 awg) 400      LNFT 4.75 1,900.00 5.50 2,200.00 5.00 2,000.00    
736-12-C conductor, 3c (emergency preemption) 230      LNFT 1.65 379.50 2.00 460.00 2.00 460.00    
736-12-D conductor, 6 pr (twisted pair imsa 20-6 / #19 awg
solid)
2,900      LNFT 2.50 7,250.00 3.00 8,700.00 3.00 8,700.00    
736-12-E conductor, 6c (signal / #14 awg) 650      LNFT 2.85 1,852.50 3.00 1,950.00 3.00 1,950.00    
736-12-F conductor, 10c (signal / #14 awg) 750      LNFT 3.90 2,925.00 5.00 3,750.00 4.00 3,000.00    
736-12-G conductor, 2c (push button / #14 awg) 350      LNFT 1.25 437.50 1.50 525.00 1.50 525.00    
736-13-A cable (2c) signal 2,275      LNFT 1.32 3,003.00 1.50 3,412.50 1.50 3,412.50    
736-13-B cable (3c) signal 395      LNFT 1.70 671.50 2.00 790.00 2.00 790.00    
736-13-C cable (6c) signal 386      LNFT 2.85 1,100.10 3.50 1,351.00 3.00 1,158.00    
736-13-D cable (10c) signal 1,033      LNFT 3.90 4,028.70 4.50 4,648.50 4.00 4,132.00    
736-13-E cable (1-6 pr) interconnect 1,879      LNFT 2.50 4,697.50 3.00 5,637.00 3.00 5,637.00    
740-01 construction layout lump      LUMP 100,000.00 100,000.00 115,000.00 115,000.00 100,000.00 100,000.00    
741-01-A water main (12" c-900 pvc, including all fittings) 920      LNFT 70.00 64,400.00 90.00 82,800.00 83.00 76,360.00    
741-02-A gate valve (6") 3      EACH 500.00 1,500.00 1,100.00 3,300.00 1,400.00 4,200.00    
741-04 fire hydrant 3      EACH 3,000.00 9,000.00 2,400.00 7,200.00 3,500.00 10,500.00    
741-09 adjusting water house connections 3      EACH 700.00 2,100.00 900.00 2,700.00 600.00 1,800.00    
741-11 adjusting water valve and meter box 1      EACH 500.00 500.00 400.00 400.00 900.00 900.00    
742-01 sanitary sewer pipe 136      LNFT 240.00 32,640.00 185.00 25,160.00 320.00 43,520.00    
742-02 adjusting sanitary sewer house connections 2      EACH 1,500.00 3,000.00 1,700.00 3,400.00 900.00 1,800.00    
744-01 traffic control management lump      LUMP 20,000.00 20,000.00 53,000.00 53,000.00 30,000.00 30,000.00    
803-03 steel sheet pile wall 5,640      SQFT 25.00 141,000.00 45.00 253,800.00 27.00 152,280.00    
804-02-A treated timber piles (noncoastal treatment) 17,280      LNFT 10.00 172,800.00 19.50 336,960.00 9.00 155,520.00    
805-03 class aa concrete 85.00   CUYD 700.00 59,500.00 1,050.00 89,250.00 600.00 51,000.00    
805-12-S reinforced concrete box culverts (8' x 8') 1,200.0    LNFT 2,000.00 2,400,000.00 2,025.00 2,430,000.00 1,750.00 2,100,000.00    
806-01 deformed reinforcing steel 13,800      LB 1.00 13,800.00 1.25 17,250.00 0.80 11,040.00    
S-001 reconstruct s.f.m. & s.f.m. crossing including tie-ins,
piles & structure, piping, etc.
lump      LUMP 50,000.00 50,000.00 42,000.00 42,000.00 38,000.00 38,000.00    
S-002 remove existing sewer line (10'-12' deep) 110      LNFT 25.00 2,750.00 86.00 9,460.00 30.00 3,300.00    
S-003 remove existing water line 920.0    LNFT 20.00 18,400.00 25.00 23,000.00 20.00 18,400.00    
S-004 full depth saw cut of concrete/asphalt pavement 8,590      LNFT 7.00 60,130.00 7.00 60,130.00 15.00 128,850.00    
S-005 exploratory excavation 10      EACH 600.00 6,000.00 1,500.00 15,000.00 1,000.00 10,000.00    
S-006 convert existing catch basin to drop inlet 6      EACH 1,500.00 9,000.00 1,200.00 7,200.00 2,300.00 13,800.00    
S-007 site video survey lump      LUMP 30,000.00 30,000.00 31,000.00 31,000.00 3,400.00 3,400.00    
S-008 interior video survey 16      EACH 300.00 4,800.00 180.00 2,880.00 275.00 4,400.00    
S-009 vibration monitoring 450      HOUR 40.00 18,000.00 30.00 13,500.00 50.00 22,500.00    
S-011 signal support (30' strain pole (pile supported)) 4      EACH 10,669.00 42,676.00 13,000.00 52,000.00 12,500.00 50,000.00    
S-012 sewer manholes 2      EACH 6,000.00 12,000.00 4,100.00 8,200.00 9,800.00 19,600.00    
S-013 video inspection of existing sewer lines lump      LUMP 20,000.00 20,000.00 14,000.00 14,000.00 12,000.00 12,000.00    
S-014 street name signs (varies x 12") 3      EACH 225.00 675.00 1,500.00 4,500.00 55.60 166.80    
S-015 emergency vehicle preemption chassis and phase
selector (2 channel)
1      EACH 3,200.00 3,200.00 4,000.00 4,000.00 3,500.00 3,500.00    
S-016 emergency vehicle unidirectional detector 2      EACH 725.00 1,450.00 900.00 1,800.00 800.00 1,600.00    
                       
 ITEM TOTAL (CONSTRUCTION BID)       6,226,689.99   6,489,635.50   6,579,891.95    
 Number of Days Bid at $15,000 per day.     240 3,600,000.00 310 4,650,000.00 325 4,875,000.00 0  
 TOTAL BID       9,826,689.99   11,139,635.50   11,454,891.95    