| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - HARD ROCK CONSTRUCTION CO. |
- 2 - BARRIERE CONSTRUCTION CO., LLC. |
- 3 - BOH BROS. CONSTRUCTION CO., LLC. |
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 201-01 |
clearing & grubbing
|
lump |
LUMP |
100,000.00 |
100,000.00 |
5,000.00 |
5,000.00 |
5,000.00 |
5,000.00 |
|
|
| 202-01 |
removal of structures & obstructions
|
lump |
LUMP |
100,000.00 |
100,000.00 |
2,000.00 |
2,000.00 |
10,000.00 |
10,000.00 |
|
|
| 202-02-C |
removal of portland cement concrete pavement
|
1,379   |
SQYD |
10.00 |
13,790.00 |
7.00 |
9,653.00 |
15.00 |
20,685.00 |
|
|
| 202-02-D |
removal of concrete walks & drives
|
188   |
SQYD |
10.00 |
1,880.00 |
19.00 |
3,572.00 |
16.00 |
3,008.00 |
|
|
| 202-02-E |
removal of concrete curbs
|
4,150.0 |
LNFT |
10.00 |
41,500.00 |
2.50 |
10,375.00 |
4.00 |
16,600.00 |
|
|
| 202-02-I |
removal of asphaltic concrete pavement (thickness
varies) |
184.7 |
SQYD |
10.00 |
1,847.00 |
14.00 |
2,585.80 |
12.00 |
2,216.40 |
|
|
| 202-02-J |
removal of concrete headwall, wingwall and apron of
box culvert |
lump |
LUMP |
20,000.00 |
20,000.00 |
30,000.00 |
30,000.00 |
3,500.00 |
3,500.00 |
|
|
| 202-02-K |
removal of existing traffic signal equipment and
related items |
lump |
LUMP |
7,000.00 |
7,000.00 |
8,000.00 |
8,000.00 |
7,500.00 |
7,500.00 |
|
|
| 203-01 |
general excavation
|
7,000   |
CUYD |
15.00 |
105,000.00 |
14.00 |
98,000.00 |
10.00 |
70,000.00 |
|
|
| 203-04 |
embankment
|
840   |
CUYD |
20.00 |
16,800.00 |
24.00 |
20,160.00 |
30.00 |
25,200.00 |
|
|
| 203-06 |
excavation & embankment
|
lump |
LUMP |
200,000.00 |
200,000.00 |
125,000.00 |
125,000.00 |
195,000.00 |
195,000.00 |
|
|
| 204-02 |
temporary hay or straw bales
|
49   |
EACH |
8.00 |
392.00 |
30.00 |
1,470.00 |
10.00 |
490.00 |
|
|
| 302-02-D |
class ii base course (12" thick)
|
6,763.1 |
SQYD |
25.00 |
169,077.50 |
29.00 |
196,129.90 |
22.00 |
148,788.20 |
|
|
| 302-02-E |
class ii base course (8" thick)
|
7,780.0 |
SQYD |
20.00 |
155,600.00 |
21.00 |
163,380.00 |
22.00 |
171,160.00 |
|
|
| 304-01 |
lime
|
23.97 |
TON |
175.00 |
4,194.75 |
100.00 |
2,397.00 |
100.00 |
2,397.00 |
|
|
| 304-04-D |
lime treatment (type d) (12" thick)
|
1,691   |
SQYD |
4.00 |
6,764.00 |
3.00 |
5,073.00 |
6.00 |
10,146.00 |
|
|
| 305-01-A |
subgrade layer (12" thick) (sand) (net section)
|
6,830   |
SQYD |
15.00 |
102,450.00 |
5.00 |
34,150.00 |
13.00 |
88,790.00 |
|
|
| 305-01-B |
subgrade layer (18" thick) (sand) (net section)
|
950   |
SQYD |
15.00 |
14,250.00 |
6.00 |
5,700.00 |
18.00 |
17,100.00 |
|
|
| 402-01 |
traffic maintenance aggregate (vehicular measurement)
|
500.0 |
CUYD |
47.00 |
23,500.00 |
65.00 |
32,500.00 |
35.00 |
17,500.00 |
|
|
| 502-01 |
superpave asphaltic concrete
|
631.0 |
TON |
90.00 |
56,790.00 |
100.00 |
63,100.00 |
140.00 |
88,340.00 |
|
|
| 509-01 |
cold planing asphaltic pavement
|
1,800   |
SQYD |
4.00 |
7,200.00 |
4.00 |
7,200.00 |
6.00 |
10,800.00 |
|
|
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 100   |
CUYD |
1.00 |
- 100.00 |
1.30 |
- 130.00 |
5.00 |
- 500.00 |
|
|
| 601-01-I |
portland cement concrete pavement (9" thick)
|
6,688.9 |
SQYD |
60.00 |
401,334.00 |
62.00 |
414,711.80 |
75.00 |
501,667.50 |
|
|
| 601-01-K |
portland cement concrete pavement (10" thick)
|
6,400.0 |
SQYD |
65.00 |
416,000.00 |
64.00 |
409,600.00 |
80.00 |
512,000.00 |
|
|
| 701-03-F |
storm drain pipe (15" rcp/pcp)
|
298   |
LNFT |
80.00 |
23,840.00 |
100.00 |
29,800.00 |
130.00 |
38,740.00 |
|
|
| 701-03-G |
storm drain pipe (18" rcp)
|
52   |
LNFT |
90.00 |
4,680.00 |
250.00 |
13,000.00 |
160.00 |
8,320.00 |
|
|
| 701-03-I |
storm drain pipe (24" rcp/pcp)
|
38   |
LNFT |
150.00 |
5,700.00 |
160.00 |
6,080.00 |
250.00 |
9,500.00 |
|
|
| 701-03-K |
storm drain pipe (30" rcp/pcp)
|
40   |
LNFT |
160.00 |
6,400.00 |
220.00 |
8,800.00 |
275.00 |
11,000.00 |
|
|
| 702-02-I |
j. p. p. w. drain manholes
|
4   |
EACH |
3,000.00 |
12,000.00 |
9,900.00 |
39,600.00 |
7,300.00 |
29,200.00 |
|
|
| 702-03-C |
catch basins (cb-06)
|
1   |
EACH |
3,000.00 |
3,000.00 |
5,100.00 |
5,100.00 |
6,000.00 |
6,000.00 |
|
|
| 702-03-D |
catch basins (cb-07)
|
2   |
EACH |
3,000.00 |
6,000.00 |
3,000.00 |
6,000.00 |
7,000.00 |
14,000.00 |
|
|
| 702-03-G |
catch basins (cb-09)
|
4   |
EACH |
4,000.00 |
16,000.00 |
3,700.00 |
14,800.00 |
8,000.00 |
32,000.00 |
|
|
| 702-03-I |
drop inlet (24" x 30", per j. p. p. w. drainage
standard detail) |
4   |
EACH |
2,000.00 |
8,000.00 |
3,400.00 |
13,600.00 |
2,800.00 |
11,200.00 |
|
|
| 702-04-A |
adjusting manholes
|
6   |
EACH |
200.00 |
1,200.00 |
700.00 |
4,200.00 |
600.00 |
3,600.00 |
|
|
| 702-04-D |
adjusting drop inlets
|
1   |
EACH |
300.00 |
300.00 |
1,100.00 |
1,100.00 |
600.00 |
600.00 |
|
|
| 704-03 |
blocked out guard rail
|
490.0 |
LNFT |
18.00 |
8,820.00 |
22.00 |
10,780.00 |
20.00 |
9,800.00 |
|
|
| 704-05 |
guard rail anchor sections (bct)
|
30.0 |
LNFT |
75.00 |
2,250.00 |
90.00 |
2,700.00 |
80.00 |
2,400.00 |
|
|
| 704-08 |
guard rail transitions
|
30.0 |
LNFT |
60.00 |
1,800.00 |
70.00 |
2,100.00 |
65.00 |
1,950.00 |
|
|
| 706-01-A |
concrete walk (4" thick)
|
159.0 |
SQYD |
60.00 |
9,540.00 |
55.00 |
8,745.00 |
60.00 |
9,540.00 |
|
|
| 706-01-A-01 |
concrete walk (4" thick) (handicap ramp)
|
41.0 |
SQYD |
100.00 |
4,100.00 |
145.00 |
5,945.00 |
150.00 |
6,150.00 |
|
|
| 706-02-D |
concrete drive (8" thick)
|
100.0 |
SQYD |
60.00 |
6,000.00 |
85.00 |
8,500.00 |
70.00 |
7,000.00 |
|
|
| 706-03-B |
incidental concrete paving (5" thick)
|
130.0 |
SQYD |
60.00 |
7,800.00 |
55.00 |
7,150.00 |
80.00 |
10,400.00 |
|
|
| 707-01 |
concrete curb
|
8,688.0 |
LNFT |
7.00 |
60,816.00 |
11.00 |
95,568.00 |
9.00 |
78,192.00 |
|
|
| 707-03 |
combination concrete curb & gutter
|
560.0 |
LNFT |
20.00 |
11,200.00 |
26.00 |
14,560.00 |
32.00 |
17,920.00 |
|
|
| 712-02 |
sacked concrete revetment
|
1,200   |
SQYD |
6.00 |
7,200.00 |
43.00 |
51,600.00 |
40.00 |
48,000.00 |
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
50,000.00 |
50,000.00 |
65,000.00 |
65,000.00 |
135,000.00 |
135,000.00 |
|
|
| 713-04-B-02 |
temporary pvmt. markings (broken line) (4" width) (10'
length / 30' slip) (white) |
0.800 |
MILE |
475.00 |
380.00 |
550.00 |
440.00 |
500.00 |
400.00 |
|
|
| 713-05-A-02 |
temporary pavement markings (solid line) (4" width)
(white) |
0.382 |
MILE |
895.00 |
341.89 |
1,000.00 |
382.00 |
950.00 |
362.90 |
|
|
| 713-05-A-03 |
temporary pavement markings (solid line) (4" width)
(yellow) |
1.300 |
MILE |
895.00 |
1,163.50 |
1,000.00 |
1,300.00 |
950.00 |
1,235.00 |
|
|
| 713-05-C-01 |
temporary pavement markings (solid line) (8" width)
(white) |
0.023 |
MILE |
1,700.00 |
39.10 |
2,100.00 |
48.30 |
1,600.00 |
36.80 |
|
|
| 714-01 |
slab sodding
|
140   |
SQYD |
7.00 |
980.00 |
8.00 |
1,120.00 |
5.00 |
700.00 |
|
|
| 715-01 |
topsoil
|
206   |
CUYD |
30.00 |
6,180.00 |
35.00 |
7,210.00 |
40.00 |
8,240.00 |
|
|
| 717-01 |
seeding
|
63   |
LB |
8.00 |
504.00 |
8.00 |
504.00 |
4.00 |
252.00 |
|
|
| 718-01 |
fertilizer
|
1,574   |
LB |
1.00 |
1,574.00 |
0.60 |
944.40 |
0.50 |
787.00 |
|
|
| 719-04 |
landscaping
|
lump |
LUMP |
20,000.00 |
20,000.00 |
40,000.00 |
40,000.00 |
38,000.00 |
38,000.00 |
|
|
| 722-01 |
project site laboratory
|
1.00 |
EACH |
20,000.00 |
20,000.00 |
45,000.00 |
45,000.00 |
5,000.00 |
5,000.00 |
|
|
| 726-01 |
bedding material
|
298.0 |
CUYD |
50.00 |
14,900.00 |
55.00 |
16,390.00 |
77.00 |
22,946.00 |
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
265,000.00 |
265,000.00 |
150,000.00 |
150,000.00 |
650,000.00 |
650,000.00 |
|
|
| 729-01 |
sign (type a)
|
84.5 |
SQFT |
37.00 |
3,126.50 |
40.00 |
3,380.00 |
40.00 |
3,380.00 |
|
|
| 731-02 |
reflectorized raised pavement markers
|
800   |
EACH |
5.00 |
4,000.00 |
6.00 |
4,800.00 |
5.50 |
4,400.00 |
|
|
| 732-01-C |
plastic pavement striping (8" width)
|
560   |
LNFT |
1.00 |
560.00 |
1.00 |
560.00 |
1.00 |
560.00 |
|
|
| 732-01-E |
plastic pavement striping (24" width)
|
275   |
LNFT |
3.00 |
825.00 |
3.50 |
962.50 |
3.00 |
825.00 |
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
2.666 |
MILE |
2,395.00 |
6,385.07 |
2,900.00 |
7,731.40 |
2,500.00 |
6,665.00 |
|
|
| 732-02-C |
plastic pavement striping (solid line) (8" width)
|
0.216 |
MILE |
4,790.00 |
1,034.64 |
5,900.00 |
1,274.40 |
5,000.00 |
1,080.00 |
|
|
| 732-02-E |
plastic pavement striping (solid line) (24" width)
|
0.054 |
MILE |
14,370.00 |
775.98 |
17,000.00 |
918.00 |
15,000.00 |
810.00 |
|
|
| 732-03-A |
plastic pavement striping (broken line) (4" width)
|
2.880 |
MILE |
2,492.00 |
7,176.96 |
3,000.00 |
8,640.00 |
2,700.00 |
7,776.00 |
|
|
| 732-03-A-04 |
plastic pavement striping (broken line) (4" width) (4'
length & 2' space) |
0.087 |
MILE |
2,492.00 |
216.80 |
3,000.00 |
261.00 |
2,800.00 |
243.60 |
|
|
| 732-04-A |
plastic pavement legends & symbols (arrow)
|
17   |
EACH |
145.00 |
2,465.00 |
170.00 |
2,890.00 |
160.00 |
2,720.00 |
|
|
| 732-04-C |
plastic pavement legends & symbols (only)
|
5   |
EACH |
155.00 |
775.00 |
190.00 |
950.00 |
170.00 |
850.00 |
|
|
| 732-05 |
removal of existing markings
|
0.440 |
MILE |
5,700.00 |
2,508.00 |
7,000.00 |
3,080.00 |
6,000.00 |
2,640.00 |
|
|
| 736-01 |
trenching and backfilling
|
6,255   |
LNFT |
4.40 |
27,522.00 |
5.00 |
31,275.00 |
4.75 |
29,711.25 |
|
|
| 736-03-A |
jacked or bored conduit (2" hdpe)
|
225   |
LNFT |
15.50 |
3,487.50 |
19.00 |
4,275.00 |
17.00 |
3,825.00 |
|
|
| 736-03-B |
jacked or bored conduit (2" p.e.c.)
|
320   |
LNFT |
15.50 |
4,960.00 |
19.00 |
6,080.00 |
17.00 |
5,440.00 |
|
|
| 736-03-C |
jacked or bored conduit (3" hdpe)
|
285   |
LNFT |
18.50 |
5,272.50 |
22.00 |
6,270.00 |
20.00 |
5,700.00 |
|
|
| 736-03-D |
jacked or bored conduit (3" p.e.c.)
|
230   |
LNFT |
18.50 |
4,255.00 |
22.00 |
5,060.00 |
20.00 |
4,600.00 |
|
|
| 736-04-A |
signal support (40' single mast arm)
|
3   |
EACH |
8,245.00 |
24,735.00 |
10,000.00 |
30,000.00 |
9,000.00 |
27,000.00 |
|
|
| 736-04-B |
signal support (40'/50' double mast arm)
|
1   |
EACH |
12,105.00 |
12,105.00 |
15,000.00 |
15,000.00 |
13,000.00 |
13,000.00 |
|
|
| 736-04-C |
signal support (pedestal pole)
|
2   |
EACH |
1,375.00 |
2,750.00 |
1,700.00 |
3,400.00 |
1,500.00 |
3,000.00 |
|
|
| 736-04-D |
signal support (30' strain pole)
|
4   |
EACH |
9,500.00 |
38,000.00 |
11,500.00 |
46,000.00 |
1,300.00 |
5,200.00 |
|
|
| 736-05-A-01 |
signal heads (3-section, 12" led) (r,y,g)
|
14   |
EACH |
905.00 |
12,670.00 |
1,100.00 |
15,400.00 |
1,000.00 |
14,000.00 |
|
|
| 736-05-A-02 |
signal heads (3-section, 12" led) (r,y(arrow),g(arrow))
|
3   |
EACH |
782.00 |
2,346.00 |
900.00 |
2,700.00 |
800.00 |
2,400.00 |
|
|
| 736-05-A-03 |
signal heads (4-section, 12" led) (r,y,g(arrow),g)
|
2   |
EACH |
1,203.00 |
2,406.00 |
1,400.00 |
2,800.00 |
1,300.00 |
2,600.00 |
|
|
| 736-05-B |
signal heads (pedestrian, walk, don't walk symbol)
|
4   |
EACH |
755.00 |
3,020.00 |
900.00 |
3,600.00 |
800.00 |
3,200.00 |
|
|
| 736-06 |
signal service
|
3   |
EACH |
1,200.00 |
3,600.00 |
1,400.00 |
4,200.00 |
1,300.00 |
3,900.00 |
|
|
| 736-08-A |
signal controller (8 phase fully actuated)
|
1   |
EACH |
20,332.00 |
20,332.00 |
25,000.00 |
25,000.00 |
21,000.00 |
21,000.00 |
|
|
| 736-08-B |
signal controller (nema 8 phase, type 6 base mounted
cabinet) |
2   |
EACH |
22,792.00 |
45,584.00 |
28,000.00 |
56,000.00 |
23,000.00 |
46,000.00 |
|
|
| 736-09 |
loop detector
|
1,815   |
LNFT |
10.50 |
19,057.50 |
13.00 |
23,595.00 |
11.00 |
19,965.00 |
|
|
| 736-10-A |
underground junction box (type d)
|
3   |
EACH |
340.00 |
1,020.00 |
400.00 |
1,200.00 |
350.00 |
1,050.00 |
|
|
| 736-10-B |
underground junction box (type e)
|
29   |
EACH |
358.00 |
10,382.00 |
400.00 |
11,600.00 |
400.00 |
11,600.00 |
|
|
| 736-10-C |
underground junction box (type f)
|
26   |
EACH |
458.00 |
11,908.00 |
550.00 |
14,300.00 |
500.00 |
13,000.00 |
|
|
| 736-10-D |
underground junction box (type h)
|
3   |
EACH |
834.00 |
2,502.00 |
1,000.00 |
3,000.00 |
900.00 |
2,700.00 |
|
|
| 736-11-A |
conduit (2" hdpe)
|
2,600   |
LNFT |
4.00 |
10,400.00 |
5.00 |
13,000.00 |
4.25 |
11,050.00 |
|
|
| 736-11-B |
conduit (2" p.e.c.)
|
3,380   |
LNFT |
4.00 |
13,520.00 |
5.00 |
16,900.00 |
4.25 |
14,365.00 |
|
|
| 736-11-C |
conduit (3" hdpe)
|
120   |
LNFT |
8.50 |
1,020.00 |
10.00 |
1,200.00 |
9.00 |
1,080.00 |
|
|
| 736-11-D |
conduit (3" p.e.c.)
|
230   |
LNFT |
8.50 |
1,955.00 |
10.00 |
2,300.00 |
9.00 |
2,070.00 |
|
|
| 736-11-E |
conduit (4" multiduct with 3 each 1-1/2" innerducts)
|
2,800   |
LNFT |
11.00 |
30,800.00 |
14.00 |
39,200.00 |
12.00 |
33,600.00 |
|
|
| 736-12-A |
conductor, 2c (loop lead in #16 awg)
|
550   |
LNFT |
1.25 |
687.50 |
1.50 |
825.00 |
1.50 |
825.00 |
|
|
| 736-12-B |
conductor, 3c (power, 6 gauge / #6 awg)
|
400   |
LNFT |
4.75 |
1,900.00 |
5.50 |
2,200.00 |
5.00 |
2,000.00 |
|
|
| 736-12-C |
conductor, 3c (emergency preemption)
|
230   |
LNFT |
1.65 |
379.50 |
2.00 |
460.00 |
2.00 |
460.00 |
|
|
| 736-12-D |
conductor, 6 pr (twisted pair imsa 20-6 / #19 awg
solid) |
2,900   |
LNFT |
2.50 |
7,250.00 |
3.00 |
8,700.00 |
3.00 |
8,700.00 |
|
|
| 736-12-E |
conductor, 6c (signal / #14 awg)
|
650   |
LNFT |
2.85 |
1,852.50 |
3.00 |
1,950.00 |
3.00 |
1,950.00 |
|
|
| 736-12-F |
conductor, 10c (signal / #14 awg)
|
750   |
LNFT |
3.90 |
2,925.00 |
5.00 |
3,750.00 |
4.00 |
3,000.00 |
|
|
| 736-12-G |
conductor, 2c (push button / #14 awg)
|
350   |
LNFT |
1.25 |
437.50 |
1.50 |
525.00 |
1.50 |
525.00 |
|
|
| 736-13-A |
cable (2c) signal
|
2,275   |
LNFT |
1.32 |
3,003.00 |
1.50 |
3,412.50 |
1.50 |
3,412.50 |
|
|
| 736-13-B |
cable (3c) signal
|
395   |
LNFT |
1.70 |
671.50 |
2.00 |
790.00 |
2.00 |
790.00 |
|
|
| 736-13-C |
cable (6c) signal
|
386   |
LNFT |
2.85 |
1,100.10 |
3.50 |
1,351.00 |
3.00 |
1,158.00 |
|
|
| 736-13-D |
cable (10c) signal
|
1,033   |
LNFT |
3.90 |
4,028.70 |
4.50 |
4,648.50 |
4.00 |
4,132.00 |
|
|
| 736-13-E |
cable (1-6 pr) interconnect
|
1,879   |
LNFT |
2.50 |
4,697.50 |
3.00 |
5,637.00 |
3.00 |
5,637.00 |
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
100,000.00 |
100,000.00 |
115,000.00 |
115,000.00 |
100,000.00 |
100,000.00 |
|
|
| 741-01-A |
water main (12" c-900 pvc, including all fittings)
|
920   |
LNFT |
70.00 |
64,400.00 |
90.00 |
82,800.00 |
83.00 |
76,360.00 |
|
|
| 741-02-A |
gate valve (6")
|
3   |
EACH |
500.00 |
1,500.00 |
1,100.00 |
3,300.00 |
1,400.00 |
4,200.00 |
|
|
| 741-04 |
fire hydrant
|
3   |
EACH |
3,000.00 |
9,000.00 |
2,400.00 |
7,200.00 |
3,500.00 |
10,500.00 |
|
|
| 741-09 |
adjusting water house connections
|
3   |
EACH |
700.00 |
2,100.00 |
900.00 |
2,700.00 |
600.00 |
1,800.00 |
|
|
| 741-11 |
adjusting water valve and meter box
|
1   |
EACH |
500.00 |
500.00 |
400.00 |
400.00 |
900.00 |
900.00 |
|
|
| 742-01 |
sanitary sewer pipe
|
136   |
LNFT |
240.00 |
32,640.00 |
185.00 |
25,160.00 |
320.00 |
43,520.00 |
|
|
| 742-02 |
adjusting sanitary sewer house connections
|
2   |
EACH |
1,500.00 |
3,000.00 |
1,700.00 |
3,400.00 |
900.00 |
1,800.00 |
|
|
| 744-01 |
traffic control management
|
lump |
LUMP |
20,000.00 |
20,000.00 |
53,000.00 |
53,000.00 |
30,000.00 |
30,000.00 |
|
|
| 803-03 |
steel sheet pile wall
|
5,640   |
SQFT |
25.00 |
141,000.00 |
45.00 |
253,800.00 |
27.00 |
152,280.00 |
|
|
| 804-02-A |
treated timber piles (noncoastal treatment)
|
17,280   |
LNFT |
10.00 |
172,800.00 |
19.50 |
336,960.00 |
9.00 |
155,520.00 |
|
|
| 805-03 |
class aa concrete
|
85.00 |
CUYD |
700.00 |
59,500.00 |
1,050.00 |
89,250.00 |
600.00 |
51,000.00 |
|
|
| 805-12-S |
reinforced concrete box culverts (8' x 8')
|
1,200.0 |
LNFT |
2,000.00 |
2,400,000.00 |
2,025.00 |
2,430,000.00 |
1,750.00 |
2,100,000.00 |
|
|
| 806-01 |
deformed reinforcing steel
|
13,800   |
LB |
1.00 |
13,800.00 |
1.25 |
17,250.00 |
0.80 |
11,040.00 |
|
|
| S-001 |
reconstruct s.f.m. & s.f.m. crossing including tie-ins,
piles & structure, piping, etc. |
lump |
LUMP |
50,000.00 |
50,000.00 |
42,000.00 |
42,000.00 |
38,000.00 |
38,000.00 |
|
|
| S-002 |
remove existing sewer line (10'-12' deep)
|
110   |
LNFT |
25.00 |
2,750.00 |
86.00 |
9,460.00 |
30.00 |
3,300.00 |
|
|
| S-003 |
remove existing water line
|
920.0 |
LNFT |
20.00 |
18,400.00 |
25.00 |
23,000.00 |
20.00 |
18,400.00 |
|
|
| S-004 |
full depth saw cut of concrete/asphalt pavement
|
8,590   |
LNFT |
7.00 |
60,130.00 |
7.00 |
60,130.00 |
15.00 |
128,850.00 |
|
|
| S-005 |
exploratory excavation
|
10   |
EACH |
600.00 |
6,000.00 |
1,500.00 |
15,000.00 |
1,000.00 |
10,000.00 |
|
|
| S-006 |
convert existing catch basin to drop inlet
|
6   |
EACH |
1,500.00 |
9,000.00 |
1,200.00 |
7,200.00 |
2,300.00 |
13,800.00 |
|
|
| S-007 |
site video survey
|
lump |
LUMP |
30,000.00 |
30,000.00 |
31,000.00 |
31,000.00 |
3,400.00 |
3,400.00 |
|
|
| S-008 |
interior video survey
|
16   |
EACH |
300.00 |
4,800.00 |
180.00 |
2,880.00 |
275.00 |
4,400.00 |
|
|
| S-009 |
vibration monitoring
|
450   |
HOUR |
40.00 |
18,000.00 |
30.00 |
13,500.00 |
50.00 |
22,500.00 |
|
|
| S-011 |
signal support (30' strain pole (pile supported))
|
4   |
EACH |
10,669.00 |
42,676.00 |
13,000.00 |
52,000.00 |
12,500.00 |
50,000.00 |
|
|
| S-012 |
sewer manholes
|
2   |
EACH |
6,000.00 |
12,000.00 |
4,100.00 |
8,200.00 |
9,800.00 |
19,600.00 |
|
|
| S-013 |
video inspection of existing sewer lines
|
lump |
LUMP |
20,000.00 |
20,000.00 |
14,000.00 |
14,000.00 |
12,000.00 |
12,000.00 |
|
|
| S-014 |
street name signs (varies x 12")
|
3   |
EACH |
225.00 |
675.00 |
1,500.00 |
4,500.00 |
55.60 |
166.80 |
|
|
| S-015 |
emergency vehicle preemption chassis and phase
selector (2 channel) |
1   |
EACH |
3,200.00 |
3,200.00 |
4,000.00 |
4,000.00 |
3,500.00 |
3,500.00 |
|
|
| S-016 |
emergency vehicle unidirectional detector
|
2   |
EACH |
725.00 |
1,450.00 |
900.00 |
1,800.00 |
800.00 |
1,600.00 |
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | ITEM TOTAL (CONSTRUCTION BID) |
|
|
|
6,226,689.99 |
|
6,489,635.50 |
|
6,579,891.95 |
|
|
| | Number of Days Bid at $15,000 per day. |
|
|
240 |
3,600,000.00 |
310 |
4,650,000.00 |
325 |
4,875,000.00 |
0 |
|
| | TOTAL BID |
|
|
|
9,826,689.99 |
|
11,139,635.50 |
|
11,454,891.95 |
|
|
|