Lead Project: 053-09-0074
Parish: CADDO
Routes: LA 1
Description: SHREVEPORT ITS IMMEDIATE TERM PHASE 3, TRAFFIC SIGNAL SYSTEM
Type Const: traffic signalization and related work.
Estimated Construction Cost: $1,535,347.50
Maximum Number of Days Allowed for Construction: 300
Calculated Daily User Cost: $3,000.00
 
RankLicenseBidderConstruction Bid Bidder's Proposed
Contract Time
Total Bid
1 13082 WYE ELECTRIC, INC. $1,907,887.50 280 $2,747,887.50
2 01165 ERNEST P. BREAUX ELECTRICAL, INC. $1,971,620.05 300 $2,871,620.05
3 01692 TOOMER ELECTRICAL CO., INC. $2,520,231.80 300 $3,420,231.80
 
Item Number Item Description Quantity Unit of Measure - 1 -
WYE ELECTRIC, INC.
- 2 -
ERNEST P. BREAUX ELECTRICAL, INC.
- 3 -
TOOMER ELECTRICAL CO., INC.

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
202-02-I removal of existing traffic signal equipment lump      LUMP 50,000.00 50,000.00 40,635.00 40,635.00 22,000.00 22,000.00    
713-01 temporary signs & barricades lump      LUMP 10,000.00 10,000.00 14,025.00 14,025.00 37,000.00 37,000.00    
727-01 mobilization lump      LUMP 10,000.00 10,000.00 13,690.00 13,690.00 277,250.00 277,250.00    
729-01 sign (type a) 745.0    SQFT 40.00 29,800.00 55.00 40,975.00 85.00 63,325.00    
736-01 trenching and backfilling 1,750      LNFT 3.00 5,250.00 8.30 14,525.00 5.00 8,750.00    
736-03-A jacked or bored conduit (2" hdpe) 190      LNFT 19.00 3,610.00 11.05 2,099.50 7.65 1,453.50    
736-03-B jacked or bored conduit (3" hdpe) 2,085      LNFT 22.00 45,870.00 15.60 32,526.00 14.80 30,858.00    
736-04-A signal support (10' pedestal pole) 1      EACH 1,100.00 1,100.00 1,515.00 1,515.00 1,827.00 1,827.00    
736-04-B signal support (wood pole) 5      EACH 1,000.00 5,000.00 3,865.00 19,325.00 1,415.00 7,075.00    
736-04-C signal support (25' mast arm pole) 1      EACH 8,940.00 8,940.00 6,380.00 6,380.00 7,387.00 7,387.00    
736-04-D signal support (30' mast arm pole) 3      EACH 9,040.00 27,120.00 6,645.00 19,935.00 7,640.00 22,920.00    
736-04-E signal support (35' mast arm pole) 2      EACH 10,050.00 20,100.00 7,275.00 14,550.00 8,245.00 16,490.00    
736-04-F signal support (40' mast arm pole) 5      EACH 10,400.00 52,000.00 8,175.00 40,875.00 8,796.00 43,980.00    
736-04-G signal support (45' mast arm pole) 4      EACH 11,000.00 44,000.00 9,095.00 36,380.00 9,185.00 36,740.00    
736-04-H signal support (30' x 35' double mast arm pole) 1      EACH 11,600.00 11,600.00 8,340.00 8,340.00 10,057.00 10,057.00    
736-04-I signal support (35' x 40' double mast arm pole) 1      EACH 12,800.00 12,800.00 10,000.00 10,000.00 11,000.00 11,000.00    
736-05-B signal head (3 section, 12" led lens) (r, y, g) 75      EACH 1,100.00 82,500.00 900.00 67,500.00 1,020.00 76,500.00    
736-05-C signal head (3 section, 12" led lens) (r, l.t. y, l.t.
g)
7      EACH 1,050.00 7,350.00 830.00 5,810.00 948.00 6,636.00    
736-05-D signal head (3 section, 12" led lens) (r, r.t. y, r.t.
g)
1      EACH 1,050.00 1,050.00 830.00 830.00 948.00 948.00    
736-05-E signal head (5 section, 12" led lens) (r, l.t. y, y,
l.t. g, g)
17      EACH 1,650.00 28,050.00 1,510.00 25,670.00 1,645.00 27,965.00    
736-05-F signal head (5 section, 12" led lens) (r, y, r.t. y, g,
r.t. g)
1      EACH 1,650.00 1,650.00 1,510.00 1,510.00 1,645.00 1,645.00    
736-05-G signal head (4 section, 12" led lens) (r, y, l.t. g, g) 1      EACH 1,550.00 1,550.00 1,350.00 1,350.00 1,485.00 1,485.00    
736-05-H signal head (4 section, 12" led lens) (r, y, g, r.t. g) 1      EACH 1,550.00 1,550.00 1,350.00 1,350.00 1,485.00 1,485.00    
736-05-I signal head (3 section, 12" led lens) (r, y, g (arrow
up))
6      EACH 1,050.00 6,300.00 835.00 5,010.00 954.00 5,724.00    
736-05-J signal head pedestrian (1 section, 16" x 18", led lens,
symbol type)
36      EACH 800.00 28,800.00 715.00 25,740.00 870.00 31,320.00    
736-05-L signal head (1 section, 12" led lens) (g (arrow up)) 1      EACH 700.00 700.00 550.00 550.00 670.00 670.00    
736-06 signal service 11      EACH 800.00 8,800.00 1,350.00 14,850.00 2,638.00 29,018.00    
736-08-A signal controller (ts-2, type 2, 8 phase fully
actuated, type 6 cabinet)
11      EACH 18,000.00 198,000.00 20,746.00 228,206.00 17,590.00 193,490.00    
736-09 loop detector 1,495      LNFT 12.00 17,940.00 13.55 20,257.25 10.85 16,220.75    
736-10-A undergrougn junction box (type d) 3      EACH 300.00 900.00 800.00 2,400.00 568.00 1,704.00    
736-10-B underground junction box (type f) 41      EACH 450.00 18,450.00 1,100.00 45,100.00 765.00 31,365.00    
736-10-C underground junction box (type h) 11      EACH 900.00 9,900.00 1,675.00 18,425.00 1,316.00 14,476.00    
736-11-A conduit (1/2" hdpe) 105      LNFT 1.50 157.50 2.00 210.00 1.70 178.50    
736-11-B conduit (2" hdpe) 1,375      LNFT 3.00 4,125.00 3.45 4,743.75 4.50 6,187.50    
736-11-C conduit (3" hdpe) 630      LNFT 4.50 2,835.00 7.10 4,473.00 5.00 3,150.00    
736-12-A conductor (6c, signal) 6,625      LNFT 2.00 13,250.00 2.15 14,243.75 1.50 9,937.50    
736-12-B conductor (10c, signal) 9,995      LNFT 2.50 24,987.50 2.90 28,985.50 2.05 20,489.75    
736-12-C conductor (2c, pedestrian push button) 4,155      LNFT 1.50 6,232.50 1.20 4,986.00 1.10 4,570.50    
736-12-D conductor (2c, shielded loop) 1,690      LNFT 1.00 1,690.00 0.75 1,267.50 1.10 1,859.00    
736-12-E conductor (3c, power) 1,710      LNFT 4.50 7,695.00 4.40 7,524.00 3.98 6,805.80    
740-01 construction layout lump      LUMP 8,000.00 8,000.00 24,850.00 24,850.00 8,082.00 8,082.00    
744-01 traffic control management lump      LUMP 50,000.00 50,000.00 26,120.00 26,120.00 52,030.00 52,030.00    
S-001 advanced computerized traffic management system lump      LUMP 220,000.00 220,000.00 205,000.00 205,000.00 213,784.00 213,784.00    
S-002 video detection device and connection 28      EACH 7,000.00 196,000.00 6,500.00 182,000.00 6,040.00 169,120.00    
S-003 video detection system 8      EACH 5,000.00 40,000.00 3,035.00 24,280.00 3,600.00 28,800.00    
S-004 pedestrian push buttons 36      EACH 125.00 4,500.00 480.00 17,280.00 300.00 10,800.00    
S-005 bridge mounted conduit 2,120      LNFT 60.00 127,200.00 77.00 163,240.00 83.00 175,960.00    
S-102 conduit duct bank nonmetallic-2(cdbn-2) 15,400      LNFT 12.00 184,800.00 11.00 169,400.00 26.40 406,560.00    
S-202 fiber optic trunk cable, 48 fiber, single mode 35,030      LNFT 2.50 87,575.00 3.86 135,215.80 2.50 87,575.00    
S-210 aerial slack storage bracket, 10" 9      EACH 200.00 1,800.00 232.00 2,088.00 817.00 7,353.00    
S-233 fiber optic drop cable, 12 fiber, single mode 600      LNFT 2.50 1,500.00 1.60 960.00 1.90 1,140.00    
S-243 fiber optic splice closure, type m 11      EACH 750.00 8,250.00 875.00 9,625.00 1,950.00 21,450.00    
S-261 preterminated patch panel, 12f, sc duplex sm 11      EACH 750.00 8,250.00 760.00 8,360.00 992.00 10,912.00    
S-269 fusion splice 230      EACH 32.00 7,360.00 55.00 12,650.00 197.00 45,310.00    
S-280 patch cord, single mode 2f, sc-lc 1 meter 22      EACH 200.00 4,400.00 162.00 3,564.00 234.00 5,148.00    
S-291 ethernet switch 11      EACH 3,000.00 33,000.00 2,595.00 28,545.00 2,905.00 31,955.00    
S-299 testing lump      LUMP 20,000.00 20,000.00 15,950.00 15,950.00 36,590.00 36,590.00    
S-303 pull box type gg (24" x 36" x 36") 6      EACH 1,500.00 9,000.00 1,580.00 9,480.00 1,834.00 11,004.00    
S-306 pull box type hh (30" x 48" x 36") 47      EACH 1,800.00 84,600.00 1,835.00 86,245.00 2,228.00 104,716.00    
                       
 ITEM TOTAL (CONSTRUCTION BID)       1,907,887.50   1,971,620.05   2,520,231.80    
 Number of Days Bid at $3,000 per day.     280 840,000.00 300 900,000.00 300 900,000.00 0  
 TOTAL BID       2,747,887.50   2,871,620.05   3,420,231.80    