Lead Project: 049-01-0016
Parish: DESOTO
Routes: LA 5
Description: L.M. 3.046 - NORTH JCT. LA 3015
Type Const: asphaltic surface treatment, striping, mobilization, signs a nd barricades
Estimated Construction Cost: $1,354,343.75
 
RankLicenseBidderConstruction Bid
1 14422 T. L. WALLACE CONSTRUCTION, INC. $1,110,415.70
2 35378 P.R. PARKER COMPANY INC $1,129,890.85
3 30339 MISSOURI PETROLEUM PRODUCTS CO. LLC $1,272,209.80
 
Item Number Item Description Quantity Unit of Measure - 1 -
T. L. WALLACE CONSTRUCTION, INC.
- 2 -
P.R. PARKER COMPANY INC
- 3 -
MISSOURI PETROLEUM PRODUCTS CO. LLC

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
507-01-A asphaltic surface treatment (1 application) 557,355      SQYD 1.48 824,885.40 1.45 808,164.75 1.76 980,944.80    
713-01 temporary signs & barricades lump      LUMP 40,000.00 40,000.00 22,000.00 22,000.00 19,000.00 19,000.00    
713-07-A temporary reflectorized raised pavement markers (tabs) 5,451      EACH 1.00 5,451.00 1.40 7,631.40 0.50 2,725.50    
724-01-B pavement patching (12" minimum thickness) 300      SQYD 150.00 45,000.00 45.00 13,500.00 175.00 52,500.00    
727-01 mobilization lump      LUMP 20,000.00 20,000.00 110,000.00 110,000.00 42,000.00 42,000.00    
731-02 reflectorized raised pavement markers 5,451      EACH 4.50 24,529.50 4.50 24,529.50 4.50 24,529.50    
732-04-D plastic pavement legends & symbols (rr crossing) 4      EACH 400.00 1,600.00 400.00 1,600.00 450.00 1,800.00    
737-01-A painted traffic striping (solid line)(4" width) 239.980  MILE 540.00 129,589.20 540.00 129,589.20 550.00 131,989.00    
737-02-A painted traffic striping (broken line)(4" width) 40.740  MILE 300.00 12,222.00 300.00 12,222.00 350.00 14,259.00    
737-03-E painted traffic striping (solid line)(24" width) 154      LNFT 0.90 138.60 1.00 154.00 3.00 462.00    
744-01 traffic control management lump      LUMP 7,000.00 7,000.00 500.00 500.00 2,000.00 2,000.00    
                       
 CONTRACTOR TOTAL       1,110,415.70   1,129,890.85   1,272,209.80    