Each project in the letting is listed with descriptive information. Click on a project to obtain a tabulation of item bids for each bidder. It includes the unit bid for each item as well as the total item bid. Also shown are the bidder totals and ranking for each project.
| Lead Project: 006-02-0073 | |
| Parish: JEFFERSON, ORLEANS | |
| Routes: US 90, LA 3154 | |
| Description: JEFFERSON HIGHWAY AND HARAHAN SIGNAL IMPROVEMENTS | |
| Type Const: traffic signalization, and related work. | |
| Low Bidder: JACK B. HARPER CONTRACTOR, INC. | |
| Amount: $1,963,884.00 | |
| Estimated Construction Cost: $2,009,449.50 | |
| Federal Number: STP-2604(531) | |
| Lead Project: 014-03-0022 | |
| Parish: ALLEN | |
| Routes: US 165 | |
| Description: KINDER - OBERLIN | |
| Type Const:
grading, drainage structures, lime trmt, subgrade layer, class ii bc, superpave acp (a-1), pccp (alt. a-2), concrete slab span bridge and related work | |
| Low Bidder: GILCHRIST CONSTRUCTION CO. LLC | |
| Amount: $30,166,026.30 | |
| Estimated Construction Cost: $33,380,549.57 | |
| Federal Number: | |
| Lead Project: 014-05-0017 | |
| Parish: RAPIDES | |
| Routes: US 165 | |
| Description: GLENMORA - WOODWORTH | |
| Type Const:
grading, drainage structures, lime trmt, class ii base course, superpave acp (alt. a-1), pccp (alt. a-2), concrete slab span bridge, traffic signalization & related work | |
| Low Bidder: DIAMOND B CONSTRUCTION CO., L.L.C. | |
| Amount: $34,048,137.16 | |
| Estimated Construction Cost: $43,127,562.38 | |
| Federal Number: | |
| Lead Project: 023-11-0026 | |
| Parish: UNION | |
| Routes: US 167 | |
| Description: JUNCTION LA 2 ALT. - LILLIE | |
| Type Const:
grading, drainage structures, lime trmt, subgrade layer, class ii bc, superpave acp (alt. a-1), pccp (alt. a-2), concrete slab span bridges and related work | |
| Low Bidder: EUTAW CONSTRUCTION CO. INC. | |
| Amount: $24,593,663.12 | |
| Estimated Construction Cost: $25,471,175.57 | |
| Federal Number: | |
| REBID | |
| Lead Project: 032-03-0036 | |
| Parish: ST LANDRY | |
| Routes: LA 10, LA 3253 | |
| Description: BAYOU CARRON BRIDGE - BAYOU COURTABLEU BRIDGE (CM) | |
| Type Const:
superpave asphaltic concrete and patching with a 2 course as phaltic surface treatment interlayer, in-place cement stabil ized base course, cold plane & overlay and related work | |
| Low Bidder: GILCHRIST CONSTRUCTION CO. LLC | |
| Amount: $1,099,459.30 | |
| Estimated Construction Cost: $873,085.60 | |
| Federal Number: STP-4905(508) | |
| Lead Project: 102-01-0041 | |
| Parish: CADDO | |
| Routes: LA 511 | |
| Description: WEST 70TH STREET (PINES ROAD TO BUNCOMBE ROAD) | |
| Type Const: grading, pavement patching, superpave asphaltic concrete pavement, and related work. | |
| Low Bidder: BEST-YET BUILDERS, LLC | |
| Amount: $433,198.95 | |
| Estimated Construction Cost: $366,986.85 | |
| Federal Number: STP-0903(530) | |
| Lead Project: 193-06-0033 | |
| Parish: CALCASIEU | |
| Routes: LA 14 | |
| Description: LA 397 - LA 3092 | |
| Type Const:
cold planing asphaltic concrete pavment, superpave asphaltic concrete pavement, pavement patching, and related work. | |
| Low Bidder: BESSETTE DEVELOPMENT CORP. | |
| Amount: $595,290.24 | |
| Estimated Construction Cost: $659,778.15 | |
| Federal Number: STP-1004(520) | |
| Lead Project: 283-08-0150 | |
| Parish: ORLEANS | |
| Routes: | |
| Description: CCC APPR. STRUCTURES REPAINTING - SEG4 CLAIBORNE AVE. INTER. | |
| Type Const: cleaning, painting and waste disposal | |
| Low Bidder: HAMES CONTRACTING INC. | |
| Amount: $5,900,000.00 | |
| Estimated Construction Cost: $6,000,000.00 | |
| Federal Number: | |
| READV | |
| Lead Project: 450-91-0135 | |
| Parish: CALCASIEU | |
| Routes: | |
| Description: INTERSTATE 10 FRONTAGE ROADS (ACROSS 1ST AVENUE RAILROAD) | |
| Type Const:
grading, drainage structures, class ii base course, portland cement concrete pavement, and related work. | |
| Low Bidder: JOHN BAILEY, INC. | |
| Amount: $312,838.22 | |
| Estimated Construction Cost: $377,407.06 | |
| Federal Number: STP-1002(515) | |
| READV | |
| Lead Project: 451-02-0081 | |
| Parish: BOSSIER | |
| Routes: I-20 | |
| Description: INDUSTRIAL DRIVE RAMP AND FRONTAGE ROAD IMPROVEMENTS | |
| Type Const:
grading, drainage structures, superpave asphaltic conc base course, pccp, bridge widening, traffic signalization and related work. | |
| Low Bidder: F. J. BURNELL, INC. | |
| Amount: $3,293,616.94 | |
| Estimated Construction Cost: $4,312,927.65 | |
| Federal Number: | |
| Lead Project: 453-01-0054 | |
| Parish: ST TAMMANY | |
| Routes: I-59 | |
| Description: JCT. I-10 - MISSISSIPPI STATE LINE | |
| Type Const: traffic signing and related work | |
| Low Bidder: UNITED RENTALS HWY TECHNOLOGIES INC | |
| Amount: $395,808.70 | |
| Estimated Construction Cost: $453,697.55 | |
| Federal Number: IM-5204(530) | |
| DBE GOAL FED | |
| Lead Project: 713-60-0008 | |
| Parish: WEBSTER | |
| Routes: | |
| Description: DEMENT AND COX ROAD BRIDGES | |
| Type Const:
grading, class ii base course, superpave asphaltic concrete pavement, concrete slab span bridge and related work. | |
| Low Bidder: F. J. BURNELL, INC. | |
| Amount: $607,913.50 | |
| Estimated Construction Cost: $568,904.00 | |
| Federal Number: BRO-6000(505) | |
| Lead Project: 737-90-0051 | |
| Parish: DISTRICT 62 | |
| Routes: | |
| Description: REPAIR OF GUARDRAIL DAMAGES IN DISTRICT 62 (MO) | |
| Type Const: retainer contract to remove and replace guardrail and relate d work | |
| Low Bidder: TRAFFIC SOLUTIONS, INC. | |
| Amount: $252,538.00 | |
| Estimated Construction Cost: $401,639.00 | |
| Federal Number: | |
| Lead Project: 737-93-0048 | |
| Parish: DISTRICT 03 | |
| Routes: | |
| Description: REPAIR OF GUARDRAIL DAMAGES IN DISTRICT 03 (MO) | |
| Type Const: retainer contract to remove and replace guardrail and relate d work | |
| Low Bidder: UNITED RENTALS HWY TECHNOLOGIES INC | |
| Amount: $322,730.00 | |
| Estimated Construction Cost: $389,450.00 | |
| Federal Number: | |
| Lead Project: 737-94-0040 | |
| Parish: DISTRICT 04 | |
| Routes: | |
| Description: REPAIR OF GUARDRAIL IN DISTRICT 04 (MO) | |
| Type Const:
retainer contract to remove and replace guardrail, breakway cable terminal assemblies (bct) and guardrail end treatment (mest) damages as a result of vehicular damages | |
| Low Bidder: ALPHA SERVICE AND PRODUCTS, INC. | |
| Amount: $476,195.00 | |
| Estimated Construction Cost: $390,642.00 | |
| Federal Number: | |
| Lead Project: 737-99-0820 | |
| Parish: STATEWIDE | |
| Routes: | |
| Description: STATEWIDE IMPACT ATTENUATOR REPAIR OR REPLACEMENT (MO) | |
| Type Const: retainer contract for repair of damaged impact attenuators s tatewide | |
| Low Bidder: JACK B. HARPER CONTRACTOR, INC. | |
| Amount: $1,598,736.00 | |
| Estimated Construction Cost: $1,464,325.00 | |
| Federal Number: | |
| REBID | |
| DBE GOAL FED | |
| Lead Project: 742-26-0070 | |
| Parish: JEFFERSON | |
| Routes: | |
| Description: WEST ESPLANADE AVE PANEL REPLACEMENT (WESTBOUND) | |
| Type Const: concrete panel replacement and related work. | |
| Low Bidder: BARRIERE CONSTRUCTION CO., LLC | |
| Amount: $3,006,677.25 | |
| Estimated Construction Cost: $2,315,682.79 | |
| Federal Number: STP-2604(505) | |
| REBID | |
| DBE GOAL FED | |
| Lead Project: 742-26-0071 | |
| Parish: JEFFERSON | |
| Routes: | |
| Description: WEST ESPLANADE AVEVENUE PANEL REPLACEMENT (EASTBOUND) | |
| Type Const: concrete panel replacement and related work. | |
| Low Bidder: BARRIERE CONSTRUCTION CO., LLC | |
| Amount: $1,996,600.50 | |
| Estimated Construction Cost: $1,415,580.29 | |
| Federal Number: STP-2604(506) | |
| DBE GOAL FED | |
| Lead Project: 852-21-0024 | |
| Parish: ST TAMMANY | |
| Routes: LA 433 | |
| Description: BAYOU LIBERTY BRIDGE AND APPROACHES (BONFOUCA) | |
| Type Const:
removal of bridges, class ii base course, superpave asph conc pavement, swing span bridge, movable bridge machinery, and related work. | |
| Low Bidder: COASTAL BRIDGE CO., L.L.C. | |
| Amount: $6,364,338.66 | |
| Estimated Construction Cost: $5,626,589.65 | |
| Federal Number: BRO-002S(796) | |