| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - EUTAW CONSTRUCTION CO. INC. |
- 2 - JAMES CONSTRUCTION GROUP LLC |
- 3 - GILCHRIST CONSTRUCTION CO. LLC |
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 201-01 |
clearing and grubbing
|
lump |
lump |
850,000.00 |
850,000.00 |
1,000,000.00 |
1,000,000.00 |
600,000.00 |
600,000.00 |
|
|
| 202-01 |
removal of structures & obstructions
|
lump |
lump |
215,000.00 |
215,000.00 |
110,000.00 |
110,000.00 |
100,000.00 |
100,000.00 |
|
|
| 202-02-C |
removal of portland cement concrete pavement
|
15,478   |
sq m |
5.00 |
77,390.00 |
5.85 |
90,546.30 |
4.00 |
61,912.00 |
|
|
| 202-02-D |
removal of concrete walks & drives
|
1,357   |
sq m |
5.00 |
6,785.00 |
10.00 |
13,570.00 |
5.50 |
7,463.50 |
|
|
| 202-02-E |
removal of concrete curbs
|
193.0 |
ln m |
5.00 |
965.00 |
11.50 |
2,219.50 |
21.00 |
4,053.00 |
|
|
| 202-02-G |
removal of surfacing & stabilized base
|
10,712.0 |
sq m |
3.75 |
40,170.00 |
5.60 |
59,987.20 |
5.50 |
58,916.00 |
|
|
| 202-02-H |
removal of guard rail
|
554   |
ln m |
13.00 |
7,202.00 |
16.00 |
8,864.00 |
18.00 |
9,972.00 |
|
|
| 202-02-01 |
removal of 11.4 m x 7.9 m brick residence (rt. of sta.
75+402) (contains non-friable asbestos) |
1   |
each |
1,000.00 |
1,000.00 |
100.00 |
100.00 |
3,000.00 |
3,000.00 |
|
|
| 202-02-02 |
removal of 17.6 m x 8.6 m brick residence (rt. of sta.
75+722) |
1   |
each |
1,000.00 |
1,000.00 |
100.00 |
100.00 |
5,000.00 |
5,000.00 |
|
|
| 202-02-03 |
removal of 15.7 m x 9.8 m brick residence (rt. of sta.
75+766) (contains non-friable asbestos) |
1   |
each |
1,000.00 |
1,000.00 |
100.00 |
100.00 |
5,000.00 |
5,000.00 |
|
|
| 202-02-04 |
removal of 17.0 m x 8.7 m brick residence (rt. of sta.
75+895) (contains non-friable asbestos) |
1   |
each |
1,000.00 |
1,000.00 |
100.00 |
100.00 |
5,000.00 |
5,000.00 |
|
|
| 202-02-05 |
removal of 15.5 m x 14.0 m commercial metal building
on slab (rt. of sta. 76+028) |
1   |
each |
750.00 |
750.00 |
100.00 |
100.00 |
6,500.00 |
6,500.00 |
|
|
| 202-02-06 |
removal of 18.1m x 9.4 m brick residence (rt. of sta.
76+301) (contains non-friable asbestos) |
1   |
each |
1,000.00 |
1,000.00 |
100.00 |
100.00 |
5,000.00 |
5,000.00 |
|
|
| 202-02-07 |
removal of 4.4 m x 3.2 m metal shed (rt. of sta.
76+301)(contains asbestos transite siding) |
1   |
each |
100.00 |
100.00 |
50.00 |
50.00 |
600.00 |
600.00 |
|
|
| 202-02-08 |
removal of 11.9 m x 8.3 m brick residence (rt. of sta.
76+728) (contains non-friable asbestos) |
1   |
each |
1,000.00 |
1,000.00 |
100.00 |
100.00 |
3,000.00 |
3,000.00 |
|
|
| 202-02-09 |
removal of 10.4 m x 8.0 m wood frame residence on slab
(rt. of sta. 76+748) |
1   |
each |
1,000.00 |
1,000.00 |
100.00 |
100.00 |
3,000.00 |
3,000.00 |
|
|
| 202-02-10 |
removal of 11.9 m x 8.3 m brick residence (rt. of sta.
76+776) |
1   |
each |
1,000.00 |
1,000.00 |
100.00 |
100.00 |
3,000.00 |
3,000.00 |
|
|
| 202-02-11 |
removal of 11.9 m x 8.3 m brick residence (rt. of sta.
76+798) (contains non-friable asbestos) |
1   |
each |
1,000.00 |
1,000.00 |
100.00 |
100.00 |
3,000.00 |
3,000.00 |
|
|
| 202-02-12 |
removal of 11.9 m x 8.3 m brick residence (rt. of sta.
76+827) (contains non-friable asbestos) |
1   |
each |
1,000.00 |
1,000.00 |
100.00 |
100.00 |
3,000.00 |
3,000.00 |
|
|
| 202-02-13 |
removal of 11.9 m x 8.3 m brick residence (rt. of sta.
76+846) (contains non-friable asbestos) |
1   |
each |
1,000.00 |
1,000.00 |
100.00 |
100.00 |
3,000.00 |
3,000.00 |
|
|
| 202-02-14 |
removal of 11.9 m x 8.3 m brick residence (rt. of sta.
76+870) (contains non-friable asbestos) |
1   |
each |
1,000.00 |
1,000.00 |
100.00 |
100.00 |
3,000.00 |
3,000.00 |
|
|
| 202-02-15 |
removal of 15.6 m x 8.3 m brick residence (rt. of sta.
76+893) (contains non-friable asbestos) |
1   |
each |
1,000.00 |
1,000.00 |
100.00 |
100.00 |
4,000.00 |
4,000.00 |
|
|
| 202-02-16 |
removal of 20.9 m x 9.0 m brick residence (rt. of sta.
78+113) |
1   |
each |
1,000.00 |
1,000.00 |
100.00 |
100.00 |
6,000.00 |
6,000.00 |
|
|
| 202-02-17 |
removal of 24.1 m x 9.0 m brick residence (rt. of sta.
78+137) |
1   |
each |
1,000.00 |
1,000.00 |
100.00 |
100.00 |
6,500.00 |
6,500.00 |
|
|
| 202-02-18 |
removal of 23.1 m x 18.1 m metal barn (rt. of sta.
79+137) |
1   |
each |
750.00 |
750.00 |
100.00 |
100.00 |
6,500.00 |
6,500.00 |
|
|
| 202-02-19 |
removal of 12.8 m x 7.4 m wood frame residence on
blocks (rt. of sta. 81+ 844)(cont.non-friable asb.& asb.trans.sid.) |
1   |
each |
100.00 |
100.00 |
100.00 |
100.00 |
3,000.00 |
3,000.00 |
|
|
| 202-02-20 |
removal of 6.5 m x 6.5 m wood frame shed on blocks
(rt. of sta. 82+415) |
1   |
each |
500.00 |
500.00 |
100.00 |
100.00 |
1,500.00 |
1,500.00 |
|
|
| 202-02-21 |
removal of 6.4 m x 4.8 m wood frame shed on blocks
(rt. of sta. 82+661) |
1   |
each |
200.00 |
200.00 |
100.00 |
100.00 |
1,000.00 |
1,000.00 |
|
|
| 202-02-22 |
removal of 19.7 m x 1.5 m wooden footbridge (lt. of
sta. 83+405) |
1   |
each |
100.00 |
100.00 |
100.00 |
100.00 |
1,000.00 |
1,000.00 |
|
|
| 202-02-23 |
removal of 23.2 m x 4.8 m mobile home (lt. of sta.
83+998) |
1   |
each |
100.00 |
100.00 |
1.00 |
1.00 |
4,000.00 |
4,000.00 |
|
|
| 202-02-24 |
removal of 21.1 m x 9.8 m brick residence with pool
(rt. of sta. 84+225) |
1   |
each |
2,500.00 |
2,500.00 |
100.00 |
100.00 |
4,000.00 |
4,000.00 |
|
|
| 202-02-25 |
removal of 21.6 m x 7.6 m brick residence (rt. of sta.
84+300) (contains non-friable asbestos) |
1   |
each |
1,000.00 |
1,000.00 |
100.00 |
100.00 |
5,000.00 |
5,000.00 |
|
|
| 202-02-26 |
removal of 17.2 m x 8.8 m wood frame residence on
piers (rt. of sta. 84+353)(contains non-friable asbestos) |
1   |
each |
1,000.00 |
1,000.00 |
100.00 |
100.00 |
500.00 |
500.00 |
|
|
| 202-02-27 |
removal of 10.7 m x 10.3 m wood frame residence on
blocks (lt. of sta. 84+ 762)(contains asbestos transite siding) |
1   |
each |
1,000.00 |
1,000.00 |
100.00 |
100.00 |
3,500.00 |
3,500.00 |
|
|
| 202-02-28 |
removal of underground propane storage tank (lt. of
sta. 84+762) |
1   |
each |
1,000.00 |
1,000.00 |
1,500.00 |
1,500.00 |
5,500.00 |
5,500.00 |
|
|
| 202-02-29 |
removal of 15.3 m x 12.3 m commercial metal building
(lt. of sta. 84+911) |
1   |
each |
1,000.00 |
1,000.00 |
100.00 |
100.00 |
6,000.00 |
6,000.00 |
|
|
| 202-02-30 |
removal of 31.1 m x 9.4 m brick building (town hall)
(lt. of sta. 84+990) (contains non-friable asbestos) |
1   |
each |
1,000.00 |
1,000.00 |
100.00 |
100.00 |
9,000.00 |
9,000.00 |
|
|
| 202-02-31 |
removal of wet well (rt. of sta. 75+212)
|
1   |
each |
1,000.00 |
1,000.00 |
5,000.00 |
5,000.00 |
1,200.00 |
1,200.00 |
|
|
| 203-01 |
general excavation
|
465,568   |
cu m |
3.00 |
1,396,704.00 |
4.25 |
1,978,664.00 |
5.00 |
2,327,840.00 |
|
|
| 203-02 |
drainage excavation
|
2,480   |
cu m |
3.60 |
8,928.00 |
13.00 |
32,240.00 |
9.00 |
22,320.00 |
|
|
| 203-03 |
muck excavation
|
24,208   |
cu m |
5.00 |
121,040.00 |
5.50 |
133,144.00 |
10.00 |
242,080.00 |
|
|
| 203-04 |
embankment
|
540,904   |
cu m |
4.50 |
2,434,068.00 |
6.30 |
3,407,695.20 |
7.50 |
4,056,780.00 |
|
|
| 203-05-A |
nonplastic embankment (stone)
|
159   |
cu m |
100.00 |
15,900.00 |
265.00 |
42,135.00 |
120.00 |
19,080.00 |
|
|
| 203-09 |
geotextile fabric
|
274   |
sq m |
3.00 |
822.00 |
35.00 |
9,590.00 |
4.00 |
1,096.00 |
|
|
| 204-02 |
temporary hay or straw bales
|
266   |
ea |
6.50 |
1,729.00 |
8.00 |
2,128.00 |
20.00 |
5,320.00 |
|
|
| 204-03 |
temporary slope drains
|
35   |
ln m |
10.00 |
350.00 |
40.00 |
1,400.00 |
50.00 |
1,750.00 |
|
|
| 204-05-A |
temporary sediment check dams (hay)
|
337   |
ea |
65.00 |
21,905.00 |
100.00 |
33,700.00 |
75.00 |
25,275.00 |
|
|
| 204-05-B |
temporary sediment check dams (stone)
|
310   |
ea |
335.00 |
103,850.00 |
500.00 |
155,000.00 |
300.00 |
93,000.00 |
|
|
| 204-06 |
temporary silt fencing
|
10,438   |
ln m |
5.00 |
52,190.00 |
9.20 |
96,029.60 |
6.00 |
62,628.00 |
|
|
| 204-07 |
temporary stone construction entrance
|
2   |
ea |
3,500.00 |
7,000.00 |
5,000.00 |
10,000.00 |
3,000.00 |
6,000.00 |
|
|
| 302-02-C-01 |
class ii base course (250 mm thick)(stone or recycled
pccp) |
2,810.1 |
sq m |
22.00 |
61,822.20 |
22.00 |
61,822.20 |
30.00 |
84,303.00 |
|
|
| 302-02-F-01 |
class ii base course (200 mm thick)(stone or recycled
pccp) |
44,282.6 |
sq m |
20.00 |
885,652.00 |
21.00 |
929,934.60 |
24.50 |
1,084,923.70 |
|
|
| 304-01-A |
lime (side roads)
|
27.87 |
Mg |
160.00 |
4,459.20 |
151.00 |
4,208.37 |
175.00 |
4,877.25 |
|
|
| 304-04-D-01 |
lime treatment (type d) (300 mm thick)(side roads)
|
1,843   |
sq m |
2.40 |
4,423.20 |
0.05 |
92.15 |
9.00 |
16,587.00 |
|
|
| 305-01 |
subgrade layer (200 mm thick)
|
2,500   |
sq m |
8.50 |
21,250.00 |
9.50 |
23,750.00 |
95.00 |
237,500.00 |
|
|
| 401-01 |
aggregate surface course (net section)
|
616.5 |
cu m |
75.00 |
46,237.50 |
50.00 |
30,825.00 |
70.00 |
43,155.00 |
|
|
| 402-01 |
traffic maintenance aggregate (vehicular measurement)
|
2,500.0 |
cu m |
70.00 |
175,000.00 |
70.00 |
175,000.00 |
50.00 |
125,000.00 |
|
|
| 502-01-01 |
superpave asphaltic concrete (side roads and shoulders)
|
11,374.3 |
Mg |
125.00 |
1,421,787.50 |
125.00 |
1,421,787.50 |
100.00 |
1,137,430.00 |
|
|
| 509-01 |
cold planing asphaltic pavement
|
2,638   |
sq m |
5.00 |
13,190.00 |
1.50 |
3,957.00 |
6.00 |
15,828.00 |
|
|
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 66   |
cu m |
1.00 |
- 66.00 |
0.01 |
- 0.66 |
1.00 |
- 66.00 |
|
|
| 701-01-I |
cross drain pipe (600 mm rcp/pcp)
|
307.0 |
ln m |
262.00 |
80,434.00 |
282.00 |
86,574.00 |
350.00 |
107,450.00 |
|
|
| 701-01-M |
cross drain pipe (900 mm rcp/pcp)
|
37.0 |
ln m |
387.00 |
14,319.00 |
428.00 |
15,836.00 |
450.00 |
16,650.00 |
|
|
| 701-01-N |
cross drain pipe (1050 mm rcp)
|
34.5 |
ln m |
500.00 |
17,250.00 |
652.00 |
22,494.00 |
600.00 |
20,700.00 |
|
|
| 701-01-O |
cross drain pipe (1200 mm rcp)
|
174.5 |
ln m |
575.00 |
100,337.50 |
695.00 |
121,277.50 |
590.00 |
102,955.00 |
|
|
| 701-02-D |
cross drain pipe arch (600 mm equiv. rcpa)
|
133.4 |
ln m |
317.00 |
42,287.80 |
342.00 |
45,622.80 |
380.00 |
50,692.00 |
|
|
| 701-02-L |
cross drain pipe arch (1800 mm equiv. rcpa)
|
44.5 |
ln m |
1,165.00 |
51,842.50 |
1,545.00 |
68,752.50 |
1,200.00 |
53,400.00 |
|
|
| 701-05-G |
side drain pipe (450 mm rcp/pcp)
|
395.5 |
ln m |
195.00 |
77,122.50 |
170.00 |
67,235.00 |
135.00 |
53,392.50 |
|
|
| 701-05-G-01 |
side drain pipe (450 mm)(erosion)
|
160.0 |
ln m |
114.50 |
18,320.00 |
145.00 |
23,200.00 |
130.00 |
20,800.00 |
|
|
| 701-05-I |
side drain pipe (600 mm)(rcp/pcp)
|
287.5 |
ln m |
251.00 |
72,162.50 |
268.00 |
77,050.00 |
190.00 |
54,625.00 |
|
|
| 701-05-K |
side drain pipe (750 mm rcp/pcp)
|
247.5 |
ln m |
323.50 |
80,066.25 |
315.00 |
77,962.50 |
265.00 |
65,587.50 |
|
|
| 701-05-M |
side drain pipe (900 mm rcp/pcp)
|
125.0 |
ln m |
392.50 |
49,062.50 |
430.00 |
53,750.00 |
395.00 |
49,375.00 |
|
|
| 701-05-Q |
side drain pipe (1500 mm rcp)
|
27.0 |
ln m |
787.00 |
21,249.00 |
825.00 |
22,275.00 |
900.00 |
24,300.00 |
|
|
| 701-06-E |
side drain pipe arch (750 mm equiv. rcpa)
|
36.0 |
ln m |
368.00 |
13,248.00 |
625.00 |
22,500.00 |
415.00 |
14,940.00 |
|
|
| 701-06-H |
side drain pipe arch (1200 mm equiv. rcpa)
|
27.0 |
ln m |
610.00 |
16,470.00 |
765.00 |
20,655.00 |
660.00 |
17,820.00 |
|
|
| 701-09 |
fabricating pipe fittings
|
6   |
ea |
2,455.00 |
14,730.00 |
2,200.00 |
13,200.00 |
2,500.00 |
15,000.00 |
|
|
| 701-15 |
concrete collar
|
6   |
ea |
750.00 |
4,500.00 |
545.00 |
3,270.00 |
1,650.00 |
9,900.00 |
|
|
| 702-02-A |
manhole (mh-06)
|
1   |
ea |
7,800.00 |
7,800.00 |
5,580.00 |
5,580.00 |
12,500.00 |
12,500.00 |
|
|
| 702-02-G |
manhole (r-cb-36)
|
2   |
ea |
4,500.00 |
9,000.00 |
9,250.00 |
18,500.00 |
6,000.00 |
12,000.00 |
|
|
| 702-03-A |
catch basins (cb-01m)
|
8   |
ea |
2,405.00 |
19,240.00 |
4,200.00 |
33,600.00 |
2,500.00 |
20,000.00 |
|
|
| 702-03-B |
catach basin (cb-02m)
|
5   |
ea |
5,625.00 |
28,125.00 |
7,100.00 |
35,500.00 |
3,500.00 |
17,500.00 |
|
|
| 702-04-A |
adjusting manholes
|
4   |
ea |
2,000.00 |
8,000.00 |
2,000.00 |
8,000.00 |
1,500.00 |
6,000.00 |
|
|
| 702-05-A |
cross drain end treatment (1 barrel, 600 mm rcp/pcp)
|
9   |
ea |
955.00 |
8,595.00 |
725.00 |
6,525.00 |
2,200.00 |
19,800.00 |
|
|
| 702-05-B |
cross drain end treatment (1 barrel, 600 mm eq. rcpa)
|
5   |
ea |
1,185.00 |
5,925.00 |
725.00 |
3,625.00 |
2,200.00 |
11,000.00 |
|
|
| 702-05-C |
cross drain end treatment (1 barrel, 900 mm rcp/pcp)
|
1   |
ea |
2,500.00 |
2,500.00 |
1,125.00 |
1,125.00 |
2,300.00 |
2,300.00 |
|
|
| 702-05-D |
cross drain end treatment (1 barrel, 1050 mm rcp)
|
1   |
ea |
3,700.00 |
3,700.00 |
1,360.00 |
1,360.00 |
4,500.00 |
4,500.00 |
|
|
| 702-05-E |
cross drain end treatment (1 barrel, 1200 mm rcp)
|
3   |
ea |
5,850.00 |
17,550.00 |
1,600.00 |
4,800.00 |
4,800.00 |
14,400.00 |
|
|
| 702-05-F |
cross drain end treatment (1 barrel, 1800 mm eq. rcpa)
|
1   |
ea |
9,850.00 |
9,850.00 |
3,000.00 |
3,000.00 |
6,000.00 |
6,000.00 |
|
|
| 702-06-A |
side drain end treatment (1 barrel, 600 mm rcp/pcp)
|
6   |
ea |
955.00 |
5,730.00 |
725.00 |
4,350.00 |
2,200.00 |
13,200.00 |
|
|
| 702-06-B |
side drain end treatment (2 barrels, 750 mm eq. rcpa)
|
2   |
ea |
2,500.00 |
5,000.00 |
1,300.00 |
2,600.00 |
4,200.00 |
8,400.00 |
|
|
| 702-06-C |
side drain end treatment (2 barrels, 900 mm rcp/pcp)
|
6   |
ea |
2,500.00 |
15,000.00 |
1,900.00 |
11,400.00 |
4,800.00 |
28,800.00 |
|
|
| 702-06-D |
side drain end treatment (1 barrel, 1500 mm rcp)
|
2   |
ea |
6,460.00 |
12,920.00 |
2,300.00 |
4,600.00 |
5,500.00 |
11,000.00 |
|
|
| 702-07-A |
cross drain safety end (type 1)
|
10   |
ea |
1,950.00 |
19,500.00 |
1,925.00 |
19,250.00 |
1,800.00 |
18,000.00 |
|
|
| 702-07-B |
cross drain safety end (type 2)
|
1   |
ea |
3,615.00 |
3,615.00 |
4,750.00 |
4,750.00 |
4,500.00 |
4,500.00 |
|
|
| 702-08-A |
side drain safety end (type 1)
|
10   |
ea |
1,928.00 |
19,280.00 |
1,460.00 |
14,600.00 |
1,800.00 |
18,000.00 |
|
|
| 702-08-B |
side drain safety end (type 2)
|
1   |
ea |
2,985.00 |
2,985.00 |
2,550.00 |
2,550.00 |
4,500.00 |
4,500.00 |
|
|
| 704-01-A |
guard rail (single thrie beam)(950 mm post spacing)
|
19.05 |
ln m |
146.00 |
2,781.30 |
146.00 |
2,781.30 |
160.00 |
3,048.00 |
|
|
| 704-03 |
blocked out guard rail
|
704.87 |
ln m |
50.50 |
35,595.94 |
50.50 |
35,595.94 |
65.00 |
45,816.55 |
|
|
| 704-06-A |
guard rail anchor sections (trailing end)(single thrie
beam) |
1.91 |
ln m |
273.00 |
521.43 |
273.00 |
521.43 |
275.00 |
525.25 |
|
|
| 704-08-B |
guard rail transitions (double thrie beam)
|
121.92 |
ln m |
161.00 |
19,629.12 |
161.00 |
19,629.12 |
180.00 |
21,945.60 |
|
|
| 704-11-A |
guard rail end treatment (flared)
|
17   |
ea |
1,875.00 |
31,875.00 |
1,875.00 |
31,875.00 |
2,100.00 |
35,700.00 |
|
|
| 705-01 |
barbed wire fence
|
4,792   |
ln m |
15.00 |
71,880.00 |
15.00 |
71,880.00 |
18.00 |
86,256.00 |
|
|
| 705-04 |
single swinging driveway gates
|
14   |
ea |
500.00 |
7,000.00 |
500.00 |
7,000.00 |
500.00 |
7,000.00 |
|
|
| 705-05 |
double swinging driveway gates
|
1   |
dbgt |
642.00 |
642.00 |
642.00 |
642.00 |
650.00 |
650.00 |
|
|
| 706-03-C |
incidental concrete paving (150 mm thick)
|
148.4 |
sq m |
75.00 |
11,130.00 |
62.00 |
9,200.80 |
60.00 |
8,904.00 |
|
|
| 708-01 |
right-of-way monument
|
92   |
ea |
95.95 |
8,827.40 |
150.00 |
13,800.00 |
400.00 |
36,800.00 |
|
|
| 708-02 |
right-of-way monument witness post
|
92   |
ea |
95.95 |
8,827.40 |
125.00 |
11,500.00 |
400.00 |
36,800.00 |
|
|
| 711-01-D |
riprap (25 kg, 450 mm thick)
|
5,768   |
sq m |
52.00 |
299,936.00 |
80.00 |
461,440.00 |
65.00 |
374,920.00 |
|
|
| 711-04 |
geotextile fabric
|
5,768   |
sq m |
2.50 |
14,420.00 |
2.30 |
13,266.40 |
3.00 |
17,304.00 |
|
|
| 712-01-A |
concrete cast-in-place revetment (100 mm thick)
|
430   |
sq m |
51.50 |
22,145.00 |
45.00 |
19,350.00 |
75.00 |
32,250.00 |
|
|
| 712-04 |
flexible revetment
|
672   |
sq m |
45.00 |
30,240.00 |
85.00 |
57,120.00 |
60.00 |
40,320.00 |
|
|
| 713-01 |
temporary signs & barricades
|
lump |
lump |
250,000.00 |
250,000.00 |
169,850.00 |
169,850.00 |
160,000.00 |
160,000.00 |
|
|
| 713-04-B |
temporary pavement markings (broken line)(100 mm width)
(3.0 m length) |
3.200 |
km |
246.00 |
787.20 |
450.00 |
1,440.00 |
350.00 |
1,120.00 |
|
|
| 713-05-A |
temporary pavement markings (solid line)(100 mm width)
|
6.400 |
km |
370.00 |
2,368.00 |
650.00 |
4,160.00 |
600.00 |
3,840.00 |
|
|
| 713-05-A-01 |
temporary pavement markings (solid line)(100 mm width)
(type i removable) |
5.000 |
km |
9,400.00 |
47,000.00 |
6,000.00 |
30,000.00 |
9,500.00 |
47,500.00 |
|
|
| 713-08 |
temporary precast concrete barrier (contractor
furnished) |
45   |
ea |
850.00 |
38,250.00 |
750.00 |
33,750.00 |
700.00 |
31,500.00 |
|
|
| 716-01-A |
mulch (vegetative)
|
114.4 |
hctr |
1,500.00 |
171,600.00 |
1,495.00 |
171,028.00 |
600.00 |
68,640.00 |
|
|
| 717-01 |
seeding
|
7,668   |
kg |
14.95 |
114,636.60 |
15.00 |
115,020.00 |
16.00 |
122,688.00 |
|
|
| 718-01 |
fertilizer
|
64,044   |
kg |
0.50 |
32,022.00 |
0.50 |
32,022.00 |
0.75 |
48,033.00 |
|
|
| 718-02 |
agricultural lime
|
375.0 |
Mg |
65.00 |
24,375.00 |
65.00 |
24,375.00 |
40.00 |
15,000.00 |
|
|
| 720-01-A |
erosion control system, slope protection (type a)
|
38,467   |
sq m |
1.50 |
57,700.50 |
1.50 |
57,700.50 |
2.75 |
105,784.25 |
|
|
| 720-01-B |
erosion control system, slope protection (type b)
|
52,073   |
sq m |
1.40 |
72,902.20 |
1.40 |
72,902.20 |
2.25 |
117,164.25 |
|
|
| 720-01-C |
erosion control system, flexible channel liner (type c)
|
9,699   |
sq m |
1.50 |
14,548.50 |
1.50 |
14,548.50 |
2.75 |
26,672.25 |
|
|
| 720-01-D |
erosion control system, flexible channel liner (type d)
|
16,445   |
sq m |
2.65 |
43,579.25 |
2.70 |
44,401.50 |
2.80 |
46,046.00 |
|
|
| 720-01-E |
erosion control system, flexible channel liner (type e)
|
1,320   |
sq m |
2.95 |
3,894.00 |
3.00 |
3,960.00 |
2.80 |
3,696.00 |
|
|
| 722-02 |
project site laboratory (equipped)
|
1   |
ea |
42,500.00 |
42,500.00 |
30,000.00 |
30,000.00 |
50,000.00 |
50,000.00 |
|
|
| 724-01-C |
pavement patching (375 mm minimum thickness)
|
88   |
sq m |
215.00 |
18,920.00 |
190.00 |
16,720.00 |
200.00 |
17,600.00 |
|
|
| 725-01 |
temporary detour roads
|
375.7 |
ln m |
700.00 |
262,990.00 |
700.00 |
262,990.00 |
650.00 |
244,205.00 |
|
|
| 726-01 |
bedding material
|
528.7 |
cu m |
90.00 |
47,583.00 |
75.00 |
39,652.50 |
75.00 |
39,652.50 |
|
|
| 727-01 |
mobilization
|
lump |
lump |
2,000,000.00 |
2,000,000.00 |
2,000,000.00 |
2,000,000.00 |
2,400,000.00 |
2,400,000.00 |
|
|
| 729-16-C |
object marker assembly (type 3)
|
63   |
ea |
68.00 |
4,284.00 |
68.00 |
4,284.00 |
75.00 |
4,725.00 |
|
|
| 731-02 |
reflectorized raised pavement markers
|
2,794   |
ea |
4.50 |
12,573.00 |
6.25 |
17,462.50 |
6.00 |
16,764.00 |
|
|
| 732-01-C |
plastic pavement striping (200 mm width)
|
320   |
ln m |
2.64 |
844.80 |
13.50 |
4,320.00 |
3.00 |
960.00 |
|
|
| 732-01-D |
plastic pavement striping (300 mm width)
|
1,610   |
ln m |
3.96 |
6,375.60 |
9.00 |
14,490.00 |
5.00 |
8,050.00 |
|
|
| 732-01-E |
plastic pavement striping (600 mm width)
|
104   |
ln m |
7.92 |
823.68 |
28.00 |
2,912.00 |
9.00 |
936.00 |
|
|
| 732-02-A |
plastic pavement striping (solid line)(100 mm width)
|
46.709 |
km |
1,388.00 |
64,832.09 |
1,550.00 |
72,398.95 |
1,800.00 |
84,076.20 |
|
|
| 732-04-A |
plastic pavement legends & symbols (arrow)
|
16   |
ea |
150.00 |
2,400.00 |
300.00 |
4,800.00 |
200.00 |
3,200.00 |
|
|
| 732-04-C |
plastic pavement legends & symbols (only)
|
8   |
ea |
150.00 |
1,200.00 |
300.00 |
2,400.00 |
200.00 |
1,600.00 |
|
|
| 732-05 |
removal of existing markings
|
10.017 |
km |
2,500.00 |
25,042.50 |
2,950.00 |
29,550.15 |
6,500.00 |
65,110.50 |
|
|
| 735-01 |
mailboxes
|
2   |
ea |
17.00 |
34.00 |
17.00 |
34.00 |
100.00 |
200.00 |
|
|
| 735-02 |
mailbox supports (single)
|
2   |
ea |
135.00 |
270.00 |
135.00 |
270.00 |
150.00 |
300.00 |
|
|
| 740-01 |
construction layout
|
lump |
lump |
400,000.00 |
400,000.00 |
273,000.00 |
273,000.00 |
480,000.00 |
480,000.00 |
|
|
| 740-02 |
utility oversight and coordination
|
lump |
lump |
38,000.00 |
38,000.00 |
10,000.00 |
10,000.00 |
90,000.00 |
90,000.00 |
|
|
| 742-01-A |
sanitary sewer pipe (100 mm)
|
336   |
ln m |
65.00 |
21,840.00 |
65.00 |
21,840.00 |
70.00 |
23,520.00 |
|
|
| 742-01-C |
sanitary sewer pipe (200 mm)
|
201   |
ln m |
135.00 |
27,135.00 |
135.00 |
27,135.00 |
140.00 |
28,140.00 |
|
|
| 742-02 |
adjusting sanitary sewer house connectons
|
7   |
each |
1,200.00 |
8,400.00 |
1,200.00 |
8,400.00 |
1,300.00 |
9,100.00 |
|
|
| 742-04-E |
casing (300 mm steel)
|
20   |
ln m |
750.00 |
15,000.00 |
750.00 |
15,000.00 |
800.00 |
16,000.00 |
|
|
| 744-01 |
traffic control management
|
lump |
lump |
50,000.00 |
50,000.00 |
12,000.00 |
12,000.00 |
160,000.00 |
160,000.00 |
|
|
| 804-01-C |
precast concrete piles (400 mm)
|
2,058.0 |
ln m |
125.63 |
258,546.54 |
170.00 |
349,860.00 |
170.00 |
349,860.00 |
|
|
| 804-01-D |
precast concrete piles (450 mm)
|
1,378.8 |
ln m |
164.70 |
227,088.36 |
195.00 |
268,866.00 |
220.00 |
303,336.00 |
|
|
| 804-01-F |
precast concrete piles (600 mm)
|
972.0 |
ln m |
377.43 |
366,861.96 |
285.00 |
277,020.00 |
340.00 |
330,480.00 |
|
|
| 804-12 |
loading permanent piles
|
4   |
ea |
7,572.47 |
30,289.88 |
3,000.00 |
12,000.00 |
100.00 |
400.00 |
|
|
| 804-17 |
dynamic monitoring
|
5   |
ea |
1,383.11 |
6,915.55 |
1,225.00 |
6,125.00 |
2,000.00 |
10,000.00 |
|
|
| 805-01-B |
class a concrete (box culvert headwalls)
|
40.75 |
cu m |
1,450.00 |
59,087.50 |
1,555.00 |
63,366.25 |
1,700.00 |
69,275.00 |
|
|
| 805-01-F |
class a concrete (bents)
|
340.49 |
cu m |
775.00 |
263,879.75 |
820.00 |
279,201.80 |
825.00 |
280,904.25 |
|
|
| 805-03 |
class aa concrete
|
1,331.87 |
cu m |
650.00 |
865,715.50 |
500.00 |
665,935.00 |
700.00 |
932,309.00 |
|
|
| 805-08-B |
precast-prestressed concrete girders (type ii)
|
891.00 |
ln m |
315.00 |
280,665.00 |
700.00 |
623,700.00 |
275.00 |
245,025.00 |
|
|
| 805-12-A |
reinforced concrete box culverts (1200 mm x 900 mm)
|
92.00 |
ln m |
850.00 |
78,200.00 |
870.00 |
80,040.00 |
1,200.00 |
110,400.00 |
|
|
| 805-12-E |
reinforced concrete box culverts (1200 mm x 1200 mm)
|
68.00 |
ln m |
850.00 |
57,800.00 |
840.00 |
57,120.00 |
1,200.00 |
81,600.00 |
|
|
| 805-12-G |
reinforced concrete box culverts (1800 mm x 1200 mm)
|
62.00 |
ln m |
1,135.00 |
70,370.00 |
885.00 |
54,870.00 |
1,200.00 |
74,400.00 |
|
|
| 805-12-I |
reinforced concrete box culverts (1500 mm x 1500 mm)
|
143.60 |
ln m |
1,260.00 |
180,936.00 |
1,110.00 |
159,396.00 |
1,300.00 |
186,680.00 |
|
|
| 805-12-M-01 |
reinforced concrete box culverts (1800 mm x 1800 mm)
(extension) |
210.00 |
ln m |
1,595.00 |
334,950.00 |
840.00 |
176,400.00 |
1,400.00 |
294,000.00 |
|
|
| 805-12-Y |
reinforced concrete box culverts (900 mm x 900 mm)
|
87.00 |
ln m |
700.00 |
60,900.00 |
755.00 |
65,685.00 |
1,200.00 |
104,400.00 |
|
|
| 806-01 |
deformed reinforcing steel
|
67,730   |
kg |
2.00 |
135,460.00 |
1.80 |
121,914.00 |
2.40 |
162,552.00 |
|
|
| 806-02 |
deformed reinforcing steel (epoxy coated)
|
121,412   |
kg |
2.50 |
303,530.00 |
2.25 |
273,177.00 |
2.75 |
333,883.00 |
|
|
| 807-06 |
structural metalwork
|
lump |
lump |
30,000.00 |
30,000.00 |
30,000.00 |
30,000.00 |
8,000.00 |
8,000.00 |
|
|
| 810-01 |
concrete railing (barrier)
|
696.00 |
ln m |
200.00 |
139,200.00 |
145.00 |
100,920.00 |
250.00 |
174,000.00 |
|
|
| 813-01 |
concrete approach slabs
|
1,173.60 |
sq m |
210.00 |
246,456.00 |
185.00 |
217,116.00 |
250.00 |
293,400.00 |
|
|
| S-001 |
rumble strips (ground-in)
|
41.9 |
km |
445.00 |
18,645.50 |
205.00 |
8,589.50 |
750.00 |
31,425.00 |
|
|
| S-002 |
plugging existing water wells
|
1   |
each |
5,000.00 |
5,000.00 |
5,000.00 |
5,000.00 |
1,600.00 |
1,600.00 |
|
|
| S-003 |
traffic maintenance asphaltic concrete
|
300.0 |
Mg |
155.00 |
46,500.00 |
320.00 |
96,000.00 |
120.00 |
36,000.00 |
|
|
| S-004 |
pond closure dam (lt. of sta. 82+200)
|
lump |
lump |
50,000.00 |
50,000.00 |
65,000.00 |
65,000.00 |
35,000.00 |
35,000.00 |
|
|
| S-005 |
removal of s. p. 023-11-0032 transition road
|
lump |
lump |
20,000.00 |
20,000.00 |
20,000.00 |
20,000.00 |
15,000.00 |
15,000.00 |
|
|
| S-006 |
removal of s. p. 023-11-0027 transition road
|
lump |
lump |
20,000.00 |
20,000.00 |
20,000.00 |
20,000.00 |
15,000.00 |
15,000.00 |
|
|
| S-007 |
temporary steel sheet pile wall
|
lump |
lump |
60,000.00 |
60,000.00 |
80,000.00 |
80,000.00 |
25,000.00 |
25,000.00 |
|
|
| S-101 |
concrete barrier rail transition (flared)
|
19.20 |
ln m |
250.00 |
4,800.00 |
400.00 |
7,680.00 |
200.00 |
3,840.00 |
|
|
| S-102 |
retroreflective sheeting panels
|
lump |
lump |
2,000.00 |
2,000.00 |
2,000.00 |
2,000.00 |
5,000.00 |
5,000.00 |
|
|
| | SUBTOTAL GENERAL |
|
|
|
17,614,529.20 |
|
19,362,309.60 |
|
21,287,142.05 |
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| ALTERNATE A |
pavement alternates
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| ALTERNATE A1 |
superpave asphaltic concrete pavement
|
|
|
|
|
|
|
|
|
|
|
| 302-02-A-01 |
class ii base course (150 mm thick)(soil cement)
|
100,950.9 |
sq m |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
|
|
| 302-02-E-01 |
class ii base course (100 mm thick)(stone or recycled
pccp) |
93,932.4 |
sq m |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
|
|
| 304-01 |
lime
|
771.38 |
Mg |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
|
|
| 304-04-D |
lime treatment (type d) (300 mm thick)
|
51,017   |
sq m |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
|
|
| 502-01 |
superpave asphaltic concrete
|
28,055.8 |
Mg |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
|
|
| 502-01-A |
superpave asphaltic concrete drives, turnouts and
miscellaneous |
5,546.5 |
Mg |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
|
|
| 732-03-A |
plastic pavement striping (broken line)(100 mm width)
|
21.288 |
km |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
|
|
| 732-03-A-01 |
plastic pvmt striping(broken line)(100mmwidth)
preformed marking tape (type v) |
1.144 |
km |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| ALTERNATE A2 |
portland cement concrete pavement
|
|
|
|
|
|
|
|
|
|
|
| 302-02-A-01 |
class ii base course (150 mm thick)(soil cement)
|
100,950.9 |
sq m |
8.35 |
842,940.02 |
7.00 |
706,656.30 |
10.00 |
1,009,509.00 |
|
|
| 302-02-E-01 |
class ii base course (100 mm thick)(stone or recycled
pccp) |
93,932.4 |
sq m |
11.00 |
1,033,256.40 |
9.00 |
845,391.60 |
13.00 |
1,221,121.20 |
|
|
| 304-01 |
lime
|
771.38 |
Mg |
160.00 |
123,420.80 |
151.00 |
116,478.38 |
140.00 |
107,993.20 |
|
|
| 304-04-D |
lime treatment (type d) (300 mm thick)
|
51,017   |
sq m |
2.40 |
122,440.80 |
0.05 |
2,550.85 |
1.50 |
76,525.50 |
|
|
| 502-01-A |
superpave asphaltic concrete drives, turnouts and
miscellaneous |
355.7 |
Mg |
165.00 |
58,690.50 |
160.00 |
56,912.00 |
150.00 |
53,355.00 |
|
|
| 601-01-G |
portland cement concrete pavement (200 mm thick)
|
79,207.2 |
sq m |
48.00 |
3,801,945.60 |
43.00 |
3,405,909.60 |
50.00 |
3,960,360.00 |
|
|
| 601-02-G |
portland cement concrete pavement (200 mm thick)
(crossovers & turnouts) |
14,725.2 |
sq m |
62.00 |
912,962.40 |
60.00 |
883,512.00 |
68.00 |
1,001,313.60 |
|
|
| 601-04 |
portland cement concrete pavement coring
|
119   |
ea |
100.00 |
11,900.00 |
100.00 |
11,900.00 |
100.00 |
11,900.00 |
|
|
| 732-03-A |
plastic pavement striping (broken line)(100 mm width)
|
0.554 |
km |
500.00 |
277.00 |
695.00 |
385.03 |
600.00 |
332.40 |
|
|
| 732-03-A-01 |
plastic pvmt striping(broken line)(100mmwidth)
preformed marking tape (type v) |
21.878 |
km |
3,259.00 |
71,300.40 |
3,450.00 |
75,479.10 |
2,600.00 |
56,882.80 |
|
|
| | SUBTOTAL ALT A2 |
|
|
|
6,979,133.92 |
|
6,105,174.86 |
|
7,499,292.70 |
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | ITEM TOTAL (CONSTRUCTION BID) |
|
|
|
24,593,663.11 |
|
25,467,484.46 |
|
28,786,434.75 |
|
|
| | Number of Days Bid at $1,000 per day. |
|
|
700 |
700,000.00 |
915 |
915,000.00 |
905 |
905,000.00 |
|
|
| | Life Cycle Cost |
|
|
|
592,900.00 |
|
592,900.00 |
|
592,900.00 |
|
|
| | TOTAL BID |
|
|
|
25,886,563.11 |
|
26,975,384.46 |
|
30,284,334.75 |
|
|
|