Letting of 9/27/2006 LA DOTD Headquarters


 
go back
Go Back
 
Lead Project: 023-11-0026
Parish: UNION
Routes: US 167
Description: JUNCTION LA 2 ALT. - LILLIE
Type Const: grading, drainage structures, lime trmt, subgrade layer, class ii bc, superpave
acp (alt. a-1), pccp (alt. a-2), concrete slab span bridges and related work
Estimated Construction Cost: $25,471,175.57
Maximum Number of Days Allowed for Construction: 915
Calculated Daily User Cost: $1,000.00
 
RankLicenseBidderConstruction Bid Bidder's Proposed
Contract Time
  Life Cycle
Cost  
Total Bid
1 39670 EUTAW CONSTRUCTION CO. INC. $24,593,663.12 700 $592,900 $25,886,563.11
2 34567 JAMES CONSTRUCTION GROUP LLC $25,467,484.46 915 $592,900 $26,975,384.46
3 12312 GILCHRIST CONSTRUCTION CO. LLC $28,786,434.75 905 $592,900 $30,284,334.75
 
Item Number Item Description Quantity Unit of Measure - 1 -
EUTAW CONSTRUCTION CO. INC.
- 2 -
JAMES CONSTRUCTION GROUP LLC
- 3 -
GILCHRIST CONSTRUCTION CO. LLC

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
201-01 clearing and grubbing lump      lump 850,000.00 850,000.00 1,000,000.00 1,000,000.00 600,000.00 600,000.00    
202-01 removal of structures & obstructions lump      lump 215,000.00 215,000.00 110,000.00 110,000.00 100,000.00 100,000.00    
202-02-C removal of portland cement concrete pavement 15,478      sq m 5.00 77,390.00 5.85 90,546.30 4.00 61,912.00    
202-02-D removal of concrete walks & drives 1,357      sq m 5.00 6,785.00 10.00 13,570.00 5.50 7,463.50    
202-02-E removal of concrete curbs 193.0    ln m 5.00 965.00 11.50 2,219.50 21.00 4,053.00    
202-02-G removal of surfacing & stabilized base 10,712.0    sq m 3.75 40,170.00 5.60 59,987.20 5.50 58,916.00    
202-02-H removal of guard rail 554      ln m 13.00 7,202.00 16.00 8,864.00 18.00 9,972.00    
202-02-01 removal of 11.4 m x 7.9 m brick residence (rt. of sta.
75+402) (contains non-friable asbestos)
1      each 1,000.00 1,000.00 100.00 100.00 3,000.00 3,000.00    
202-02-02 removal of 17.6 m x 8.6 m brick residence (rt. of sta.
75+722)
1      each 1,000.00 1,000.00 100.00 100.00 5,000.00 5,000.00    
202-02-03 removal of 15.7 m x 9.8 m brick residence (rt. of sta.
75+766) (contains non-friable asbestos)
1      each 1,000.00 1,000.00 100.00 100.00 5,000.00 5,000.00    
202-02-04 removal of 17.0 m x 8.7 m brick residence (rt. of sta.
75+895) (contains non-friable asbestos)
1      each 1,000.00 1,000.00 100.00 100.00 5,000.00 5,000.00    
202-02-05 removal of 15.5 m x 14.0 m commercial metal building
on slab (rt. of sta. 76+028)
1      each 750.00 750.00 100.00 100.00 6,500.00 6,500.00    
202-02-06 removal of 18.1m x 9.4 m brick residence (rt. of sta.
76+301) (contains non-friable asbestos)
1      each 1,000.00 1,000.00 100.00 100.00 5,000.00 5,000.00    
202-02-07 removal of 4.4 m x 3.2 m metal shed (rt. of sta.
76+301)(contains asbestos transite siding)
1      each 100.00 100.00 50.00 50.00 600.00 600.00    
202-02-08 removal of 11.9 m x 8.3 m brick residence (rt. of sta.
76+728) (contains non-friable asbestos)
1      each 1,000.00 1,000.00 100.00 100.00 3,000.00 3,000.00    
202-02-09 removal of 10.4 m x 8.0 m wood frame residence on slab
(rt. of sta. 76+748)
1      each 1,000.00 1,000.00 100.00 100.00 3,000.00 3,000.00    
202-02-10 removal of 11.9 m x 8.3 m brick residence (rt. of sta.
76+776)
1      each 1,000.00 1,000.00 100.00 100.00 3,000.00 3,000.00    
202-02-11 removal of 11.9 m x 8.3 m brick residence (rt. of sta.
76+798) (contains non-friable asbestos)
1      each 1,000.00 1,000.00 100.00 100.00 3,000.00 3,000.00    
202-02-12 removal of 11.9 m x 8.3 m brick residence (rt. of sta.
76+827) (contains non-friable asbestos)
1      each 1,000.00 1,000.00 100.00 100.00 3,000.00 3,000.00    
202-02-13 removal of 11.9 m x 8.3 m brick residence (rt. of sta.
76+846) (contains non-friable asbestos)
1      each 1,000.00 1,000.00 100.00 100.00 3,000.00 3,000.00    
202-02-14 removal of 11.9 m x 8.3 m brick residence (rt. of sta.
76+870) (contains non-friable asbestos)
1      each 1,000.00 1,000.00 100.00 100.00 3,000.00 3,000.00    
202-02-15 removal of 15.6 m x 8.3 m brick residence (rt. of sta.
76+893) (contains non-friable asbestos)
1      each 1,000.00 1,000.00 100.00 100.00 4,000.00 4,000.00    
202-02-16 removal of 20.9 m x 9.0 m brick residence (rt. of sta.
78+113)
1      each 1,000.00 1,000.00 100.00 100.00 6,000.00 6,000.00    
202-02-17 removal of 24.1 m x 9.0 m brick residence (rt. of sta.
78+137)
1      each 1,000.00 1,000.00 100.00 100.00 6,500.00 6,500.00    
202-02-18 removal of 23.1 m x 18.1 m metal barn (rt. of sta.
79+137)
1      each 750.00 750.00 100.00 100.00 6,500.00 6,500.00    
202-02-19 removal of 12.8 m x 7.4 m wood frame residence on
blocks (rt. of sta. 81+ 844)(cont.non-friable
asb.& asb.trans.sid.)
1      each 100.00 100.00 100.00 100.00 3,000.00 3,000.00    
202-02-20 removal of 6.5 m x 6.5 m wood frame shed on blocks
(rt. of sta. 82+415)
1      each 500.00 500.00 100.00 100.00 1,500.00 1,500.00    
202-02-21 removal of 6.4 m x 4.8 m wood frame shed on blocks
(rt. of sta. 82+661)
1      each 200.00 200.00 100.00 100.00 1,000.00 1,000.00    
202-02-22 removal of 19.7 m x 1.5 m wooden footbridge (lt. of
sta. 83+405)
1      each 100.00 100.00 100.00 100.00 1,000.00 1,000.00    
202-02-23 removal of 23.2 m x 4.8 m mobile home (lt. of sta.
83+998)
1      each 100.00 100.00 1.00 1.00 4,000.00 4,000.00    
202-02-24 removal of 21.1 m x 9.8 m brick residence with pool
(rt. of sta. 84+225)
1      each 2,500.00 2,500.00 100.00 100.00 4,000.00 4,000.00    
202-02-25 removal of 21.6 m x 7.6 m brick residence (rt. of sta.
84+300) (contains non-friable asbestos)
1      each 1,000.00 1,000.00 100.00 100.00 5,000.00 5,000.00    
202-02-26 removal of 17.2 m x 8.8 m wood frame residence on
piers (rt. of sta. 84+353)(contains non-friable
asbestos)
1      each 1,000.00 1,000.00 100.00 100.00 500.00 500.00    
202-02-27 removal of 10.7 m x 10.3 m wood frame residence on
blocks (lt. of sta. 84+ 762)(contains asbestos
transite siding)
1      each 1,000.00 1,000.00 100.00 100.00 3,500.00 3,500.00    
202-02-28 removal of underground propane storage tank (lt. of
sta. 84+762)
1      each 1,000.00 1,000.00 1,500.00 1,500.00 5,500.00 5,500.00    
202-02-29 removal of 15.3 m x 12.3 m commercial metal building
(lt. of sta. 84+911)
1      each 1,000.00 1,000.00 100.00 100.00 6,000.00 6,000.00    
202-02-30 removal of 31.1 m x 9.4 m brick building (town hall)
(lt. of sta. 84+990) (contains non-friable
asbestos)
1      each 1,000.00 1,000.00 100.00 100.00 9,000.00 9,000.00    
202-02-31 removal of wet well (rt. of sta. 75+212) 1      each 1,000.00 1,000.00 5,000.00 5,000.00 1,200.00 1,200.00    
203-01 general excavation 465,568      cu m 3.00 1,396,704.00 4.25 1,978,664.00 5.00 2,327,840.00    
203-02 drainage excavation 2,480      cu m 3.60 8,928.00 13.00 32,240.00 9.00 22,320.00    
203-03 muck excavation 24,208      cu m 5.00 121,040.00 5.50 133,144.00 10.00 242,080.00    
203-04 embankment 540,904      cu m 4.50 2,434,068.00 6.30 3,407,695.20 7.50 4,056,780.00    
203-05-A nonplastic embankment (stone) 159      cu m 100.00 15,900.00 265.00 42,135.00 120.00 19,080.00    
203-09 geotextile fabric 274      sq m 3.00 822.00 35.00 9,590.00 4.00 1,096.00    
204-02 temporary hay or straw bales 266      ea 6.50 1,729.00 8.00 2,128.00 20.00 5,320.00    
204-03 temporary slope drains 35      ln m 10.00 350.00 40.00 1,400.00 50.00 1,750.00    
204-05-A temporary sediment check dams (hay) 337      ea 65.00 21,905.00 100.00 33,700.00 75.00 25,275.00    
204-05-B temporary sediment check dams (stone) 310      ea 335.00 103,850.00 500.00 155,000.00 300.00 93,000.00    
204-06 temporary silt fencing 10,438      ln m 5.00 52,190.00 9.20 96,029.60 6.00 62,628.00    
204-07 temporary stone construction entrance 2      ea 3,500.00 7,000.00 5,000.00 10,000.00 3,000.00 6,000.00    
302-02-C-01 class ii base course (250 mm thick)(stone or recycled
pccp)
2,810.1    sq m 22.00 61,822.20 22.00 61,822.20 30.00 84,303.00    
302-02-F-01 class ii base course (200 mm thick)(stone or recycled
pccp)
44,282.6    sq m 20.00 885,652.00 21.00 929,934.60 24.50 1,084,923.70    
304-01-A lime (side roads) 27.87   Mg 160.00 4,459.20 151.00 4,208.37 175.00 4,877.25    
304-04-D-01 lime treatment (type d) (300 mm thick)(side roads) 1,843      sq m 2.40 4,423.20 0.05 92.15 9.00 16,587.00    
305-01 subgrade layer (200 mm thick) 2,500      sq m 8.50 21,250.00 9.50 23,750.00 95.00 237,500.00    
401-01 aggregate surface course (net section) 616.5    cu m 75.00 46,237.50 50.00 30,825.00 70.00 43,155.00    
402-01 traffic maintenance aggregate (vehicular measurement) 2,500.0    cu m 70.00 175,000.00 70.00 175,000.00 50.00 125,000.00    
502-01-01 superpave asphaltic concrete (side roads and shoulders) 11,374.3    Mg 125.00 1,421,787.50 125.00 1,421,787.50 100.00 1,137,430.00    
509-01 cold planing asphaltic pavement 2,638      sq m 5.00 13,190.00 1.50 3,957.00 6.00 15,828.00    
509-02 contractor retained reclaimed asphaltic pavement - 66      cu m 1.00 - 66.00 0.01 - 0.66 1.00 - 66.00    
701-01-I cross drain pipe (600 mm rcp/pcp) 307.0    ln m 262.00 80,434.00 282.00 86,574.00 350.00 107,450.00    
701-01-M cross drain pipe (900 mm rcp/pcp) 37.0    ln m 387.00 14,319.00 428.00 15,836.00 450.00 16,650.00    
701-01-N cross drain pipe (1050 mm rcp) 34.5    ln m 500.00 17,250.00 652.00 22,494.00 600.00 20,700.00    
701-01-O cross drain pipe (1200 mm rcp) 174.5    ln m 575.00 100,337.50 695.00 121,277.50 590.00 102,955.00    
701-02-D cross drain pipe arch (600 mm equiv. rcpa) 133.4    ln m 317.00 42,287.80 342.00 45,622.80 380.00 50,692.00    
701-02-L cross drain pipe arch (1800 mm equiv. rcpa) 44.5    ln m 1,165.00 51,842.50 1,545.00 68,752.50 1,200.00 53,400.00    
701-05-G side drain pipe (450 mm rcp/pcp) 395.5    ln m 195.00 77,122.50 170.00 67,235.00 135.00 53,392.50    
701-05-G-01 side drain pipe (450 mm)(erosion) 160.0    ln m 114.50 18,320.00 145.00 23,200.00 130.00 20,800.00    
701-05-I side drain pipe (600 mm)(rcp/pcp) 287.5    ln m 251.00 72,162.50 268.00 77,050.00 190.00 54,625.00    
701-05-K side drain pipe (750 mm rcp/pcp) 247.5    ln m 323.50 80,066.25 315.00 77,962.50 265.00 65,587.50    
701-05-M side drain pipe (900 mm rcp/pcp) 125.0    ln m 392.50 49,062.50 430.00 53,750.00 395.00 49,375.00    
701-05-Q side drain pipe (1500 mm rcp) 27.0    ln m 787.00 21,249.00 825.00 22,275.00 900.00 24,300.00    
701-06-E side drain pipe arch (750 mm equiv. rcpa) 36.0    ln m 368.00 13,248.00 625.00 22,500.00 415.00 14,940.00    
701-06-H side drain pipe arch (1200 mm equiv. rcpa) 27.0    ln m 610.00 16,470.00 765.00 20,655.00 660.00 17,820.00    
701-09 fabricating pipe fittings 6      ea 2,455.00 14,730.00 2,200.00 13,200.00 2,500.00 15,000.00    
701-15 concrete collar 6      ea 750.00 4,500.00 545.00 3,270.00 1,650.00 9,900.00    
702-02-A manhole (mh-06) 1      ea 7,800.00 7,800.00 5,580.00 5,580.00 12,500.00 12,500.00    
702-02-G manhole (r-cb-36) 2      ea 4,500.00 9,000.00 9,250.00 18,500.00 6,000.00 12,000.00    
702-03-A catch basins (cb-01m) 8      ea 2,405.00 19,240.00 4,200.00 33,600.00 2,500.00 20,000.00    
702-03-B catach basin (cb-02m) 5      ea 5,625.00 28,125.00 7,100.00 35,500.00 3,500.00 17,500.00    
702-04-A adjusting manholes 4      ea 2,000.00 8,000.00 2,000.00 8,000.00 1,500.00 6,000.00    
702-05-A cross drain end treatment (1 barrel, 600 mm rcp/pcp) 9      ea 955.00 8,595.00 725.00 6,525.00 2,200.00 19,800.00    
702-05-B cross drain end treatment (1 barrel, 600 mm eq. rcpa) 5      ea 1,185.00 5,925.00 725.00 3,625.00 2,200.00 11,000.00    
702-05-C cross drain end treatment (1 barrel, 900 mm rcp/pcp) 1      ea 2,500.00 2,500.00 1,125.00 1,125.00 2,300.00 2,300.00    
702-05-D cross drain end treatment (1 barrel, 1050 mm rcp) 1      ea 3,700.00 3,700.00 1,360.00 1,360.00 4,500.00 4,500.00    
702-05-E cross drain end treatment (1 barrel, 1200 mm rcp) 3      ea 5,850.00 17,550.00 1,600.00 4,800.00 4,800.00 14,400.00    
702-05-F cross drain end treatment (1 barrel, 1800 mm eq. rcpa) 1      ea 9,850.00 9,850.00 3,000.00 3,000.00 6,000.00 6,000.00    
702-06-A side drain end treatment (1 barrel, 600 mm rcp/pcp) 6      ea 955.00 5,730.00 725.00 4,350.00 2,200.00 13,200.00    
702-06-B side drain end treatment (2 barrels, 750 mm eq. rcpa) 2      ea 2,500.00 5,000.00 1,300.00 2,600.00 4,200.00 8,400.00    
702-06-C side drain end treatment (2 barrels, 900 mm rcp/pcp) 6      ea 2,500.00 15,000.00 1,900.00 11,400.00 4,800.00 28,800.00    
702-06-D side drain end treatment (1 barrel, 1500 mm rcp) 2      ea 6,460.00 12,920.00 2,300.00 4,600.00 5,500.00 11,000.00    
702-07-A cross drain safety end (type 1) 10      ea 1,950.00 19,500.00 1,925.00 19,250.00 1,800.00 18,000.00    
702-07-B cross drain safety end (type 2) 1      ea 3,615.00 3,615.00 4,750.00 4,750.00 4,500.00 4,500.00    
702-08-A side drain safety end (type 1) 10      ea 1,928.00 19,280.00 1,460.00 14,600.00 1,800.00 18,000.00    
702-08-B side drain safety end (type 2) 1      ea 2,985.00 2,985.00 2,550.00 2,550.00 4,500.00 4,500.00    
704-01-A guard rail (single thrie beam)(950 mm post spacing) 19.05   ln m 146.00 2,781.30 146.00 2,781.30 160.00 3,048.00    
704-03 blocked out guard rail 704.87   ln m 50.50 35,595.94 50.50 35,595.94 65.00 45,816.55    
704-06-A guard rail anchor sections (trailing end)(single thrie
beam)
1.91   ln m 273.00 521.43 273.00 521.43 275.00 525.25    
704-08-B guard rail transitions (double thrie beam) 121.92   ln m 161.00 19,629.12 161.00 19,629.12 180.00 21,945.60    
704-11-A guard rail end treatment (flared) 17      ea 1,875.00 31,875.00 1,875.00 31,875.00 2,100.00 35,700.00    
705-01 barbed wire fence 4,792      ln m 15.00 71,880.00 15.00 71,880.00 18.00 86,256.00    
705-04 single swinging driveway gates 14      ea 500.00 7,000.00 500.00 7,000.00 500.00 7,000.00    
705-05 double swinging driveway gates 1      dbgt 642.00 642.00 642.00 642.00 650.00 650.00    
706-03-C incidental concrete paving (150 mm thick) 148.4    sq m 75.00 11,130.00 62.00 9,200.80 60.00 8,904.00    
708-01 right-of-way monument 92      ea 95.95 8,827.40 150.00 13,800.00 400.00 36,800.00    
708-02 right-of-way monument witness post 92      ea 95.95 8,827.40 125.00 11,500.00 400.00 36,800.00    
711-01-D riprap (25 kg, 450 mm thick) 5,768      sq m 52.00 299,936.00 80.00 461,440.00 65.00 374,920.00    
711-04 geotextile fabric 5,768      sq m 2.50 14,420.00 2.30 13,266.40 3.00 17,304.00    
712-01-A concrete cast-in-place revetment (100 mm thick) 430      sq m 51.50 22,145.00 45.00 19,350.00 75.00 32,250.00    
712-04 flexible revetment 672      sq m 45.00 30,240.00 85.00 57,120.00 60.00 40,320.00    
713-01 temporary signs & barricades lump      lump 250,000.00 250,000.00 169,850.00 169,850.00 160,000.00 160,000.00    
713-04-B temporary pavement markings (broken line)(100 mm width)
(3.0 m length)
3.200  km 246.00 787.20 450.00 1,440.00 350.00 1,120.00    
713-05-A temporary pavement markings (solid line)(100 mm width) 6.400  km 370.00 2,368.00 650.00 4,160.00 600.00 3,840.00    
713-05-A-01 temporary pavement markings (solid line)(100 mm width)
(type i removable)
5.000  km 9,400.00 47,000.00 6,000.00 30,000.00 9,500.00 47,500.00    
713-08 temporary precast concrete barrier (contractor
furnished)
45      ea 850.00 38,250.00 750.00 33,750.00 700.00 31,500.00    
716-01-A mulch (vegetative) 114.4    hctr 1,500.00 171,600.00 1,495.00 171,028.00 600.00 68,640.00    
717-01 seeding 7,668      kg 14.95 114,636.60 15.00 115,020.00 16.00 122,688.00    
718-01 fertilizer 64,044      kg 0.50 32,022.00 0.50 32,022.00 0.75 48,033.00    
718-02 agricultural lime 375.0    Mg 65.00 24,375.00 65.00 24,375.00 40.00 15,000.00    
720-01-A erosion control system, slope protection (type a) 38,467      sq m 1.50 57,700.50 1.50 57,700.50 2.75 105,784.25    
720-01-B erosion control system, slope protection (type b) 52,073      sq m 1.40 72,902.20 1.40 72,902.20 2.25 117,164.25    
720-01-C erosion control system, flexible channel liner (type c) 9,699      sq m 1.50 14,548.50 1.50 14,548.50 2.75 26,672.25    
720-01-D erosion control system, flexible channel liner (type d) 16,445      sq m 2.65 43,579.25 2.70 44,401.50 2.80 46,046.00    
720-01-E erosion control system, flexible channel liner (type e) 1,320      sq m 2.95 3,894.00 3.00 3,960.00 2.80 3,696.00    
722-02 project site laboratory (equipped) 1      ea 42,500.00 42,500.00 30,000.00 30,000.00 50,000.00 50,000.00    
724-01-C pavement patching (375 mm minimum thickness) 88      sq m 215.00 18,920.00 190.00 16,720.00 200.00 17,600.00    
725-01 temporary detour roads 375.7    ln m 700.00 262,990.00 700.00 262,990.00 650.00 244,205.00    
726-01 bedding material 528.7    cu m 90.00 47,583.00 75.00 39,652.50 75.00 39,652.50    
727-01 mobilization lump      lump 2,000,000.00 2,000,000.00 2,000,000.00 2,000,000.00 2,400,000.00 2,400,000.00    
729-16-C object marker assembly (type 3) 63      ea 68.00 4,284.00 68.00 4,284.00 75.00 4,725.00    
731-02 reflectorized raised pavement markers 2,794      ea 4.50 12,573.00 6.25 17,462.50 6.00 16,764.00    
732-01-C plastic pavement striping (200 mm width) 320      ln m 2.64 844.80 13.50 4,320.00 3.00 960.00    
732-01-D plastic pavement striping (300 mm width) 1,610      ln m 3.96 6,375.60 9.00 14,490.00 5.00 8,050.00    
732-01-E plastic pavement striping (600 mm width) 104      ln m 7.92 823.68 28.00 2,912.00 9.00 936.00    
732-02-A plastic pavement striping (solid line)(100 mm width) 46.709  km 1,388.00 64,832.09 1,550.00 72,398.95 1,800.00 84,076.20    
732-04-A plastic pavement legends & symbols (arrow) 16      ea 150.00 2,400.00 300.00 4,800.00 200.00 3,200.00    
732-04-C plastic pavement legends & symbols (only) 8      ea 150.00 1,200.00 300.00 2,400.00 200.00 1,600.00    
732-05 removal of existing markings 10.017  km 2,500.00 25,042.50 2,950.00 29,550.15 6,500.00 65,110.50    
735-01 mailboxes 2      ea 17.00 34.00 17.00 34.00 100.00 200.00    
735-02 mailbox supports (single) 2      ea 135.00 270.00 135.00 270.00 150.00 300.00    
740-01 construction layout lump      lump 400,000.00 400,000.00 273,000.00 273,000.00 480,000.00 480,000.00    
740-02 utility oversight and coordination lump      lump 38,000.00 38,000.00 10,000.00 10,000.00 90,000.00 90,000.00    
742-01-A sanitary sewer pipe (100 mm) 336      ln m 65.00 21,840.00 65.00 21,840.00 70.00 23,520.00    
742-01-C sanitary sewer pipe (200 mm) 201      ln m 135.00 27,135.00 135.00 27,135.00 140.00 28,140.00    
742-02 adjusting sanitary sewer house connectons 7      each 1,200.00 8,400.00 1,200.00 8,400.00 1,300.00 9,100.00    
742-04-E casing (300 mm steel) 20      ln m 750.00 15,000.00 750.00 15,000.00 800.00 16,000.00    
744-01 traffic control management lump      lump 50,000.00 50,000.00 12,000.00 12,000.00 160,000.00 160,000.00    
804-01-C precast concrete piles (400 mm) 2,058.0    ln m 125.63 258,546.54 170.00 349,860.00 170.00 349,860.00    
804-01-D precast concrete piles (450 mm) 1,378.8    ln m 164.70 227,088.36 195.00 268,866.00 220.00 303,336.00    
804-01-F precast concrete piles (600 mm) 972.0    ln m 377.43 366,861.96 285.00 277,020.00 340.00 330,480.00    
804-12 loading permanent piles 4      ea 7,572.47 30,289.88 3,000.00 12,000.00 100.00 400.00    
804-17 dynamic monitoring 5      ea 1,383.11 6,915.55 1,225.00 6,125.00 2,000.00 10,000.00    
805-01-B class a concrete (box culvert headwalls) 40.75   cu m 1,450.00 59,087.50 1,555.00 63,366.25 1,700.00 69,275.00    
805-01-F class a concrete (bents) 340.49   cu m 775.00 263,879.75 820.00 279,201.80 825.00 280,904.25    
805-03 class aa concrete 1,331.87   cu m 650.00 865,715.50 500.00 665,935.00 700.00 932,309.00    
805-08-B precast-prestressed concrete girders (type ii) 891.00   ln m 315.00 280,665.00 700.00 623,700.00 275.00 245,025.00    
805-12-A reinforced concrete box culverts (1200 mm x 900 mm) 92.00   ln m 850.00 78,200.00 870.00 80,040.00 1,200.00 110,400.00    
805-12-E reinforced concrete box culverts (1200 mm x 1200 mm) 68.00   ln m 850.00 57,800.00 840.00 57,120.00 1,200.00 81,600.00    
805-12-G reinforced concrete box culverts (1800 mm x 1200 mm) 62.00   ln m 1,135.00 70,370.00 885.00 54,870.00 1,200.00 74,400.00    
805-12-I reinforced concrete box culverts (1500 mm x 1500 mm) 143.60   ln m 1,260.00 180,936.00 1,110.00 159,396.00 1,300.00 186,680.00    
805-12-M-01 reinforced concrete box culverts (1800 mm x 1800 mm)
(extension)
210.00   ln m 1,595.00 334,950.00 840.00 176,400.00 1,400.00 294,000.00    
805-12-Y reinforced concrete box culverts (900 mm x 900 mm) 87.00   ln m 700.00 60,900.00 755.00 65,685.00 1,200.00 104,400.00    
806-01 deformed reinforcing steel 67,730      kg 2.00 135,460.00 1.80 121,914.00 2.40 162,552.00    
806-02 deformed reinforcing steel (epoxy coated) 121,412      kg 2.50 303,530.00 2.25 273,177.00 2.75 333,883.00    
807-06 structural metalwork lump      lump 30,000.00 30,000.00 30,000.00 30,000.00 8,000.00 8,000.00    
810-01 concrete railing (barrier) 696.00   ln m 200.00 139,200.00 145.00 100,920.00 250.00 174,000.00    
813-01 concrete approach slabs 1,173.60   sq m 210.00 246,456.00 185.00 217,116.00 250.00 293,400.00    
S-001 rumble strips (ground-in) 41.9    km 445.00 18,645.50 205.00 8,589.50 750.00 31,425.00    
S-002 plugging existing water wells 1      each 5,000.00 5,000.00 5,000.00 5,000.00 1,600.00 1,600.00    
S-003 traffic maintenance asphaltic concrete 300.0    Mg 155.00 46,500.00 320.00 96,000.00 120.00 36,000.00    
S-004 pond closure dam (lt. of sta. 82+200) lump      lump 50,000.00 50,000.00 65,000.00 65,000.00 35,000.00 35,000.00    
S-005 removal of s. p. 023-11-0032 transition road lump      lump 20,000.00 20,000.00 20,000.00 20,000.00 15,000.00 15,000.00    
S-006 removal of s. p. 023-11-0027 transition road lump      lump 20,000.00 20,000.00 20,000.00 20,000.00 15,000.00 15,000.00    
S-007 temporary steel sheet pile wall lump      lump 60,000.00 60,000.00 80,000.00 80,000.00 25,000.00 25,000.00    
S-101 concrete barrier rail transition (flared) 19.20   ln m 250.00 4,800.00 400.00 7,680.00 200.00 3,840.00    
S-102 retroreflective sheeting panels lump      lump 2,000.00 2,000.00 2,000.00 2,000.00 5,000.00 5,000.00    
 SUBTOTAL GENERAL       17,614,529.20   19,362,309.60   21,287,142.05    
                       
ALTERNATE A pavement alternates                    
                       
ALTERNATE A1 superpave asphaltic concrete pavement                    
302-02-A-01 class ii base course (150 mm thick)(soil cement) 100,950.9    sq m 0.00 0.00 0.00 0.00 0.00 0.00    
302-02-E-01 class ii base course (100 mm thick)(stone or recycled
pccp)
93,932.4    sq m 0.00 0.00 0.00 0.00 0.00 0.00    
304-01 lime 771.38   Mg 0.00 0.00 0.00 0.00 0.00 0.00    
304-04-D lime treatment (type d) (300 mm thick) 51,017      sq m 0.00 0.00 0.00 0.00 0.00 0.00    
502-01 superpave asphaltic concrete 28,055.8    Mg 0.00 0.00 0.00 0.00 0.00 0.00    
502-01-A superpave asphaltic concrete drives, turnouts and
miscellaneous
5,546.5    Mg 0.00 0.00 0.00 0.00 0.00 0.00    
732-03-A plastic pavement striping (broken line)(100 mm width) 21.288  km 0.00 0.00 0.00 0.00 0.00 0.00    
732-03-A-01 plastic pvmt striping(broken line)(100mmwidth)
preformed marking tape (type v)
1.144  km 0.00 0.00 0.00 0.00 0.00 0.00    
                       
ALTERNATE A2 portland cement concrete pavement                    
302-02-A-01 class ii base course (150 mm thick)(soil cement) 100,950.9    sq m 8.35 842,940.02 7.00 706,656.30 10.00 1,009,509.00    
302-02-E-01 class ii base course (100 mm thick)(stone or recycled
pccp)
93,932.4    sq m 11.00 1,033,256.40 9.00 845,391.60 13.00 1,221,121.20    
304-01 lime 771.38   Mg 160.00 123,420.80 151.00 116,478.38 140.00 107,993.20    
304-04-D lime treatment (type d) (300 mm thick) 51,017      sq m 2.40 122,440.80 0.05 2,550.85 1.50 76,525.50    
502-01-A superpave asphaltic concrete drives, turnouts and
miscellaneous
355.7    Mg 165.00 58,690.50 160.00 56,912.00 150.00 53,355.00    
601-01-G portland cement concrete pavement (200 mm thick) 79,207.2    sq m 48.00 3,801,945.60 43.00 3,405,909.60 50.00 3,960,360.00    
601-02-G portland cement concrete pavement (200 mm thick)
(crossovers & turnouts)
14,725.2    sq m 62.00 912,962.40 60.00 883,512.00 68.00 1,001,313.60    
601-04 portland cement concrete pavement coring 119      ea 100.00 11,900.00 100.00 11,900.00 100.00 11,900.00    
732-03-A plastic pavement striping (broken line)(100 mm width) 0.554  km 500.00 277.00 695.00 385.03 600.00 332.40    
732-03-A-01 plastic pvmt striping(broken line)(100mmwidth)
preformed marking tape (type v)
21.878  km 3,259.00 71,300.40 3,450.00 75,479.10 2,600.00 56,882.80    
 SUBTOTAL ALT A2       6,979,133.92   6,105,174.86   7,499,292.70    
                       
 ITEM TOTAL (CONSTRUCTION BID)       24,593,663.11   25,467,484.46   28,786,434.75    
 Number of Days Bid at $1,000 per day.     700 700,000.00 915 915,000.00 905 905,000.00    
 Life Cycle Cost       592,900.00   592,900.00   592,900.00    
 TOTAL BID       25,886,563.11   26,975,384.46   30,284,334.75    