| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - BEST-YET BUILDERS, LLC |
- 2 - BENTON & BROWN, LLC. |
- 3 - MADDEN CONTRACTING CO., INC. |
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-02-D |
removal of concrete walks & drives
|
9   |
SQYD |
13.50 |
121.50 |
50.00 |
450.00 |
56.00 |
504.00 |
|
|
| 203-08 |
borrow (vehicular measurement)
|
400   |
CUYD |
15.00 |
6,000.00 |
20.00 |
8,000.00 |
20.00 |
8,000.00 |
|
|
| 502-01 |
superpave asphaltic concrete
|
3,983.7 |
TON |
75.00 |
298,777.50 |
75.00 |
298,777.50 |
88.80 |
353,752.56 |
|
|
| 502-01-A |
superpave asphaltic concrete, drives, turnouts, and
miscellaneous |
130.0 |
TON |
75.00 |
9,750.00 |
75.00 |
9,750.00 |
242.40 |
31,512.00 |
|
|
| 706-01-A |
concrete walk (4" thick)
|
9.0 |
SQYD |
45.00 |
405.00 |
175.00 |
1,575.00 |
75.00 |
675.00 |
|
|
| 712-01-A |
concrete cast-in-place revetment (4" thick)
|
25   |
SQYD |
48.00 |
1,200.00 |
125.00 |
3,125.00 |
75.00 |
1,875.00 |
|
|
| 712-04 |
flexible revetment
|
20   |
SQYD |
75.00 |
1,500.00 |
150.00 |
3,000.00 |
85.00 |
1,700.00 |
|
|
| 713-01 |
temporary signs and barricades
|
lump |
LUMP |
5,000.00 |
5,000.00 |
25,000.00 |
25,000.00 |
52,000.00 |
52,000.00 |
|
|
| 713-03-D |
temporary pavement markings (12" width)
|
132   |
LNFT |
0.62 |
81.84 |
1.00 |
132.00 |
0.56 |
73.92 |
|
|
| 713-03-E |
temporary pavement markings (24" width)
|
562   |
LNFT |
1.85 |
1,039.70 |
2.00 |
1,124.00 |
1.68 |
944.16 |
|
|
| 713-04-A |
temporary pavement markings (broken line) (4" width)
(4' length) |
1.030 |
MILE |
0.01 |
0.01 |
350.00 |
360.50 |
625.00 |
643.75 |
|
|
| 713-04-B |
temporary pavement markings (broken line) (4" width)
(10' length) |
0.583 |
MILE |
349.00 |
203.47 |
375.00 |
218.63 |
317.00 |
184.81 |
|
|
| 713-05-A |
temporary pavement markings (solid line) (4" width)
|
2.432 |
MILE |
699.00 |
1,699.97 |
725.00 |
1,763.20 |
633.00 |
1,539.46 |
|
|
| 713-06-A |
temporary pavement legends and symbols (arrow)
|
6   |
EACH |
60.00 |
360.00 |
65.00 |
390.00 |
54.00 |
324.00 |
|
|
| 713-06-C |
temporary pavement legends and symbols (only)
|
6   |
EACH |
60.00 |
360.00 |
65.00 |
390.00 |
54.00 |
324.00 |
|
|
| 716-01-A |
mulch (vegetative)
|
0.90 |
ACRE |
600.00 |
540.00 |
1,600.00 |
1,440.00 |
3,000.00 |
2,700.00 |
|
|
| 724-01-B |
pavement patching (12" minimum thickness)
|
550   |
SQYD |
65.00 |
35,750.00 |
65.00 |
35,750.00 |
88.10 |
48,455.00 |
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
20,000.00 |
20,000.00 |
41,000.00 |
41,000.00 |
52,000.00 |
52,000.00 |
|
|
| 731-02 |
reflectorized raised pavement markers
|
286   |
EACH |
5.99 |
1,713.14 |
6.50 |
1,859.00 |
5.40 |
1,544.40 |
|
|
| 732-01-D |
plastic pavement striping (12" width)
|
132   |
LNFT |
1.30 |
171.60 |
1.50 |
198.00 |
1.17 |
154.44 |
|
|
| 732-01-E |
plastic pavement striping (24" width)
|
562   |
LNFT |
3.86 |
2,169.32 |
4.00 |
2,248.00 |
3.51 |
1,972.62 |
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
2.432 |
MILE |
3,200.00 |
7,782.40 |
2,700.00 |
6,566.40 |
2,365.00 |
5,751.68 |
|
|
| 732-03-A |
plastic pavement striping (broken line) (4" width)
|
0.583 |
MILE |
765.00 |
446.00 |
800.00 |
466.40 |
694.00 |
404.60 |
|
|
| 732-04-A |
plastic pavement legends and symbols (arrow)
|
6   |
EACH |
160.00 |
960.00 |
200.00 |
1,200.00 |
145.00 |
870.00 |
|
|
| 732-04-C |
plastic pavement legends and symbols (only)
|
6   |
EACH |
170.00 |
1,020.00 |
200.00 |
1,200.00 |
155.00 |
930.00 |
|
|
| 739-01 |
hydro-seeding
|
0.90 |
AC |
1,275.00 |
1,147.50 |
1,600.00 |
1,440.00 |
2,000.00 |
1,800.00 |
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
5,000.00 |
5,000.00 |
10,000.00 |
10,000.00 |
17,200.00 |
17,200.00 |
|
|
| 744-01 |
traffic control management
|
lump |
LUMP |
10,000.00 |
10,000.00 |
10,000.00 |
10,000.00 |
10,000.00 |
10,000.00 |
|
|
| S-001 |
surface preparation
|
lump |
LUMP |
20,000.00 |
20,000.00 |
10,000.00 |
10,000.00 |
30,000.00 |
30,000.00 |
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
433,198.95 |
|
477,423.63 |
|
627,835.40 |
|
|
|