Lead Project: 032-03-0036
Parish: ST LANDRY
Routes: LA 10, LA 3253
Description: BAYOU CARRON BRIDGE - BAYOU COURTABLEU BRIDGE (CM)
Type Const: superpave asphaltic concrete and patching with a 2 course as phaltic surface treatment
interlayer, in-place cement stabil ized base course, cold plane & overlay and related work
Estimated Construction Cost: $873,085.60
 
RankLicenseBidderConstruction Bid
1 12312 GILCHRIST CONSTRUCTION CO. LLC $1,099,459.30
2 34356 PRAIRIE CONTRACTORS INC. $1,144,825.35
3 04089 H & S CONSTRUCTION CO., INC. $1,146,411.40
4 08815 W. E. MCDONALD & SON, LLC. $1,173,867.57
 
Item Number Item Description Quantity Unit of Measure - 1 -
GILCHRIST CONSTRUCTION CO. LLC
- 2 -
PRAIRIE CONTRACTORS INC.
- 3 -
H & S CONSTRUCTION CO., INC.
- 4 -
W. E. MCDONALD & SON, LLC.
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
202-02-D removal of concrete walks and drives 150      SQYD 5.00 750.00 100.00 15,000.00 50.00 7,500.00 35.00 5,250.00
303-01-B in-place cement stabilized base course (8 1/2" thick) 8,301      SQYD 13.20 109,573.20 15.00 124,515.00 23.00 190,923.00 18.00 149,418.00
502-01 superpave asphaltic concrete 3,859.1    TON 120.00 463,092.00 90.00 347,319.00 110.00 424,501.00 90.00 347,319.00
502-01-A superpave asphaltic concrete, drives, turnouts and
miscellaneous
1,175.0    TON 175.00 205,625.00 25.00 29,375.00 135.00 158,625.00 25.00 29,375.00
507-01-B asphaltic surface treatment (2 applications) 10,152      SQYD 3.00 30,456.00 7.50 76,140.00 7.00 71,064.00 7.50 76,140.00
509-01 cold planing asphaltic pavement 11,315      SQYD 3.00 33,945.00 4.15 46,957.25 10.00 113,150.00 4.15 46,957.25
509-02 contractor retained reclaimed asphaltic pavement - 424      CUYD 0.01 - 4.24 0.01 - 4.24 0.01 - 4.24 0.01 - 4.24
702-04-A adjusting manholes 6      EACH 900.00 5,400.00 2,000.00 12,000.00 155.00 930.00 2,000.00 12,000.00
702-04-B adjusting catch basins 4      EACH 1,700.00 6,800.00 4,000.00 16,000.00 2,300.00 9,200.00 4,000.00 16,000.00
702-04-D adjusting valve cover 4      EACH 500.00 2,000.00 300.00 1,200.00 150.00 600.00 300.00 1,200.00
713-01 temporary signs & barricades lump      LUMP 15,000.00 15,000.00 150,000.00 150,000.00 30,000.00 30,000.00 75,000.00 75,000.00
713-03-D temporary pavement markings (12" width) 120      LNFT 1.00 120.00 1.00 120.00 1.00 120.00 0.75 90.00
713-04-A temporary pavement markings (broken line)(4" width)(4'
length)
2.782  MILE 312.18 868.48 600.00 1,669.20 850.00 2,364.70 350.00 973.70
713-04-B temporary pavement markings (broken line)(4" width)
(10' length)
1.176  MILE 405.00 476.28 1.00 1.18 415.00 488.04 350.00 411.60
713-05-A temporary pavement markings (solid line)(4" width) 7.464  MILE 931.72 6,954.36 1.00 7.46 1,000.00 7,464.00 750.00 5,598.00
713-07-A temporary reflectorized raised pavement markers (tabs) 177      EACH 1.56 276.12 3.00 531.00 2.50 442.50 2.00 354.00
724-01-B pavement patching (12" minimum thickness) 500      SQYD 140.00 70,000.00 205.00 102,500.00 98.00 49,000.00 205.00 102,500.00
727-01 mobilization lump      LUMP 50,000.00 50,000.00 150,000.00 150,000.00 35,000.00 35,000.00 145,000.00 145,000.00
729-16-B object marker assembly (type 2) 4      EACH 90.00 360.00 200.00 800.00 115.00 460.00 200.00 800.00
731-02 reflectorized raised pavement markers 200      EACH 6.00 1,200.00 6.00 1,200.00 7.00 1,400.00 5.50 1,100.00
732-01-D plastic pavement striping (12" width) 60      LNFT 1.00 60.00 5.00 300.00 1.25 75.00 1.00 60.00
732-02-A plastic pavement striping (solid line) (4" width) 5.063  MILE 2,900.00 14,682.70 3,500.00 17,720.50 3,100.00 15,695.30 2,500.00 12,657.50
732-03-A plastic pavement striping (broken line)(4" width) 0.687  MILE 1,200.00 824.40 2,000.00 1,374.00 1,300.00 893.10 972.00 667.76
740-01 construction layout lump      LUMP 10,000.00 10,000.00 100.00 100.00 4,500.00 4,500.00 50,000.00 50,000.00
744-01 traffic control management lump      LUMP 51,000.00 51,000.00 30,000.00 30,000.00 4,520.00 4,520.00 75,000.00 75,000.00
S-001 surface preparation lump      LUMP 20,000.00 20,000.00 20,000.00 20,000.00 17,500.00 17,500.00 20,000.00 20,000.00
                       
 CONTRACTOR TOTAL       1,099,459.30   1,144,825.35   1,146,411.40   1,173,867.57