Lead Project: 193-06-0033
Parish: CALCASIEU
Routes: LA 14
Description: LA 397 - LA 3092
Type Const: cold planing asphaltic concrete pavment, superpave asphaltic concrete pavement,
pavement patching, and related work.
Estimated Construction Cost: $659,778.15
 
RankLicenseBidderConstruction Bid
1 14096 BESSETTE DEVELOPMENT CORP. $595,290.24
2 00183 R. E. HEIDT CONSTRUCTION CO., INC. $600,416.39
3 34356 PRAIRIE CONTRACTORS INC. $665,240.03
 
Item Number Item Description Quantity Unit of Measure - 1 -
BESSETTE DEVELOPMENT CORP.
- 2 -
R. E. HEIDT CONSTRUCTION CO., INC.
- 3 -
PRAIRIE CONTRACTORS INC.

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
401-02 aggregate surface course (adjusted vehicular
measurement)
679      CUYD 52.00 35,308.00 46.00 31,234.00 36.00 24,444.00    
502-01 superpave asphaltic concrete 4,950.0    TON 77.00 381,150.00 83.00 410,850.00 76.00 376,200.00    
502-01-A superpave asphaltic concrete, drives, turnouts and
miscellaneous
600.1    TON 82.50 49,508.25 96.00 57,609.60 100.00 60,010.00    
509-01 cold planing asphaltic pavement 41,397      SQYD 0.95 39,327.15 0.53 21,940.41 1.75 72,444.75    
509-02 contractor retained reclaimed asphaltic pavement - 1,304      CUYD 1.00 - 1,304.00 12.00 - 15,648.00 0.01 - 13.04    
713-01 temporary signs & barricades lump      LUMP 4,200.00 4,200.00 4,305.00 4,305.00 22,000.00 22,000.00    
713-03-E temporary pavement markings (24" width) 48      LNFT 0.65 31.20 0.96 46.08 0.01 0.48    
713-04-A temporary pavement markings (broken line)(4" width)(4'
length)
6.160  MILE 350.00 2,156.00 136.00 837.76 400.00 2,464.00    
713-04-B temporary pavement markings (broken line)(4" width)
(10' length)
5.514  MILE 325.00 1,792.05 310.00 1,709.34 0.01 0.06    
713-05-A temporary pavement markings (solid line)(4" width) 14.096  MILE 649.50 9,155.35 551.00 7,766.90 0.01 0.14    
713-06-D temporary pavement legends and symbols (rr crossing) 4      EACH 220.00 880.00 158.00 632.00 0.01 0.04    
724-01-B pavement patching (12" minimum thickness) 200      SQYD 67.75 13,550.00 84.00 16,800.00 70.00 14,000.00    
727-01 mobilization lump      LUMP 12,500.00 12,500.00 22,440.00 22,440.00 31,000.00 31,000.00    
729-16-B object marker assembly (type 2) 14      EACH 90.00 1,260.00 53.00 742.00 70.00 980.00    
731-02 reflectorized raised pavement markers 407      EACH 4.90 1,994.30 5.40 2,197.80 5.00 2,035.00    
732-01-E plastic pavement striping (24" width) 36      LNFT 3.25 117.00 3.25 117.00 3.00 108.00    
732-02-A plastic pavement striping (solid line) (4" width) 7.048  MILE 2,440.00 17,197.12 2,258.00 15,914.38 3,000.00 21,144.00    
732-03-A plastic pavement striping (broken line)(4" width) 2.757  MILE 867.00 2,390.32 788.00 2,172.52 800.00 2,205.60    
732-04-D plastic pavement legends & symbols (rr crossing) 2      EACH 435.00 870.00 446.25 892.50 400.00 800.00    
735-01 mailboxes 42      EACH 1.25 52.50 1.05 44.10 1.00 42.00    
735-02 mailbox supports (single) 29      EACH 145.00 4,205.00 139.00 4,031.00 125.00 3,625.00    
735-03 mailbox supports (double) 10      EACH 190.00 1,900.00 184.00 1,840.00 175.00 1,750.00    
740-01 construction layout lump      LUMP 6,200.00 6,200.00 4,284.00 4,284.00 10,000.00 10,000.00    
744-01 traffic control management lump      LUMP 10,850.00 10,850.00 7,658.00 7,658.00 20,000.00 20,000.00    
                       
 CONTRACTOR TOTAL       595,290.24   600,416.39   665,240.03    