Lead Project: 006-02-0073
Parish: JEFFERSON, ORLEANS
Routes: US 90, LA 3154
Description: JEFFERSON HIGHWAY AND HARAHAN SIGNAL IMPROVEMENTS
Type Const: traffic signalization, and related work.
Estimated Construction Cost: $2,009,449.50
 
RankLicenseBidderConstruction Bid
1 27043 JACK B. HARPER CONTRACTOR, INC. $1,963,884.00
2 01692 TOOMER ELECTRICAL CO., INC. $2,001,024.89
 
Item Number Item Description Quantity Unit of Measure - 1 -
JACK B. HARPER CONTRACTOR, INC.
- 2 -
TOOMER ELECTRICAL CO., INC.

 

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
202-02-I removal of existing traffic signal equipment lump      LUMP 24,875.00 24,875.00 13,040.00 13,040.00        
706-03-A incidental concrete paving (4" thick) 372.0    SQYD 97.50 36,270.00 77.00 28,644.00        
713-01 temporary signs & barricades lump      LUMP 18,000.00 18,000.00 22,215.00 22,215.00        
727-01 mobilization lump      LUMP 125,000.00 125,000.00 73,250.00 73,250.00        
729-01 sign (type a) 585.8    SQFT 60.00 35,148.00 47.50 27,825.50        
730-08 electrical service point (existing pole) 9      EACH 1,265.00 11,385.00 1,135.00 10,215.00        
732-01-C plastic pavement striping (8" width) 3,370      LNFT 1.00 3,370.00 1.00 3,370.00        
732-01-D plastic pavement striping (12" width) 3,515      LNFT 1.50 5,272.50 1.48 5,202.20        
732-01-E plastic pavement striping (24" width) 1,575      LNFT 3.25 5,118.75 3.80 5,985.00        
732-03-A plastic pavement striping (broken line)(4" width) 0.070  MILE 1,000.00 70.00 1,177.00 82.39        
732-04-A plastic pavement legends & symbols (arrow) 44      EACH 175.00 7,700.00 206.00 9,064.00        
732-04-B plastic pavement legends & symbols (double arrow) 3      EACH 195.00 585.00 230.00 690.00        
732-04-C plastic pavement legends & symbols (only) 29      EACH 205.00 5,945.00 242.00 7,018.00        
736-01 trenching and backfilling 2,078      LNFT 4.75 9,870.50 4.00 8,312.00        
736-03-A jacked or bored conduit (2" hdpe) 425      LNFT 12.00 5,100.00 17.40 7,395.00        
736-03-B jacked or bored conduit (3" hdpe) 2,835      LNFT 15.00 42,525.00 34.00 96,390.00        
736-03-C jacked or bored conduit (4" multiduct with 3-1 1/2"
conduits, schedule 80)
22,748      LNFT 21.00 477,708.00 23.25 528,891.00        
736-04-A signal support (10' pedestal pole) 12      EACH 1,450.00 17,400.00 1,677.00 20,124.00        
736-04-B signal support (20' mast arm pole) 4      EACH 6,450.00 25,800.00 5,758.00 23,032.00        
736-04-C signal support (25' mast arm pole) 5      EACH 6,670.00 33,350.00 3,135.00 15,675.00        
736-04-D signal support (30' mast arm pole) 3      EACH 6,925.00 20,775.00 6,388.00 19,164.00        
736-04-E signal support (35' mast arm pole) 3      EACH 7,550.00 22,650.00 7,071.00 21,213.00        
736-04-F signal support (40' mast arm pole) 1      EACH 8,550.00 8,550.00 7,900.00 7,900.00        
736-04-G signal support (50' mast arm pole) 6      EACH 10,625.00 63,750.00 9,964.00 59,784.00        
736-04-H signal support (55' mast arm pole) 3      EACH 10,980.00 32,940.00 10,330.00 30,990.00        
736-04-I signal support (30' x 30' double mast arm pole) 1      EACH 7,985.00 7,985.00 7,738.00 7,738.00        
736-04-J signal support (30' x 35' double mast arm pole) 2      EACH 8,150.00 16,300.00 7,967.00 15,934.00        
736-04-K signal support (30' x 45' double mast arm pole) 1      EACH 9,000.00 9,000.00 8,830.00 8,830.00        
736-04-L signal support (40' x 55' double mast arm pole) 1      EACH 12,150.00 12,150.00 11,600.00 11,600.00        
736-05-B signal head (3-section, 12" led) (r, y, g) 75      EACH 890.00 66,750.00 875.00 65,625.00        
736-05-C signal head (3-section, 12" led) (r, l.t. y, l.t. g) 15      EACH 750.00 11,250.00 690.00 10,350.00        
736-05-D signal head (3-section, 12" led) (r, r.t. y, r.t. g) 4      EACH 750.00 3,000.00 690.00 2,760.00        
736-05-E signal head (4-section, 12" led) (r, y, l.t. g, g) 1      EACH 1,125.00 1,125.00 1,106.00 1,106.00        
736-05-F signal head (pedestrian led) 72      EACH 550.00 39,600.00 640.00 46,080.00        
736-06 signal service (new pedestal) 4      EACH 1,525.00 6,100.00 1,727.00 6,908.00        
736-08-A signal controller (8 phase nema ts-2 type 2 ntcip
compliant controller with ts-1 cabinet on new
controller base)
9      EACH 20,250.00 182,250.00 16,276.00 146,484.00        
736-08-B signal controller (8 phase nema ts-2 type 2 ntcip
compliant controller with ts-1 cabinet on
existing controller base)
1      EACH 18,975.00 18,975.00 14,900.00 14,900.00        
736-09 loop detector 4,236      LNFT 10.00 42,360.00 11.50 48,714.00        
736-10-A underground junction box (type e) 5      EACH 390.00 1,950.00 450.00 2,250.00        
736-10-B underground junction box (type f) 123      EACH 455.00 55,965.00 532.00 65,436.00        
736-10-C underground junction box (type h) 9      EACH 880.00 7,920.00 874.00 7,866.00        
736-11-A conduit (2" hdpe) 1,691      LNFT 4.00 6,764.00 3.00 5,073.00        
736-11-B conduit (3" hdpe) 530      LNFT 6.00 3,180.00 5.85 3,100.50        
736-12-A conductor (2c) shielded loop lead-in 985      LNFT 1.25 1,231.25 1.10 1,083.50        
736-12-B conductor (2c) pedestrian push button 8,670      LNFT 1.25 10,837.50 1.10 9,537.00        
736-12-C conductor (3c) controller power 880      LNFT 6.00 5,280.00 4.15 3,652.00        
736-12-D conductor (6c) signal 11,300      LNFT 2.50 28,250.00 1.46 16,498.00        
736-12-E conductor (10c) signal 6,620      LNFT 2.75 18,205.00 2.03 13,438.60        
736-12-F conductor (6 pair interconnect) 23,365      LNFT 2.90 67,758.50 1.88 43,926.20        
740-01 construction layout lump      LUMP 15,000.00 15,000.00 16,098.00 16,098.00        
744-01 traffic control management lump      LUMP 25,000.00 25,000.00 57,024.00 57,024.00        
S-001 testing of existing loop detector 35      LNFT 100.00 3,500.00 86.60 3,031.00        
S-002 video detection device and connection 25      EACH 6,250.00 156,250.00 5,798.00 144,950.00        
S-003 video detection system 6      EACH 3,695.00 22,170.00 3,922.00 23,532.00        
S-004 communication tower 2      EACH 19,250.00 38,500.00 55,846.00 111,692.00        
S-005 antenna 2      EACH 3,800.00 7,600.00 2,430.00 4,860.00        
S-006 radio communcation system 2      EACH 10,500.00 21,000.00 8,102.00 16,204.00        
S-007 pedestrian push buttons 71      EACH 95.00 6,745.00 219.00 15,549.00        
S-008 pulling conductors through existing conduit at an
intersection
3      EACH 1,325.00 3,975.00 692.00 2,076.00        
S-009 splicing of new cable to existing cable at an
intersection
8      EACH 100.00 800.00 206.00 1,648.00        
                       
 CONTRACTOR TOTAL       1,963,884.00   2,001,024.89        