| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - JOHN BAILEY, INC. |
|
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-01 |
removal of structures and obstructions
|
lump |
LUMP |
1,000.00 |
1,000.00 |
|
|
|
|
|
|
| 202-02-C |
removal of portland cement concrete pavement
|
39   |
SQYD |
50.00 |
1,950.00 |
|
|
|
|
|
|
| 202-02-D |
removal of concrete walks & drives
|
54   |
SQYD |
10.00 |
540.00 |
|
|
|
|
|
|
| 202-02-F |
removal of concrete combination curb & gutter
|
224.0 |
LNFT |
10.00 |
2,240.00 |
|
|
|
|
|
|
| 202-02-G |
removal of surfacing & stabilized base
|
348.3 |
SQYD |
10.00 |
3,483.00 |
|
|
|
|
|
|
| 202-02-01 |
removal of concrete headwall
|
1   |
EACH |
250.00 |
250.00 |
|
|
|
|
|
|
| 202-02-02 |
removal of signs
|
5   |
EACH |
25.00 |
125.00 |
|
|
|
|
|
|
| 203-01 |
general excavation
|
1,139   |
CUYD |
8.00 |
9,112.00 |
|
|
|
|
|
|
| 203-04 |
embankment
|
262   |
CUYD |
15.00 |
3,930.00 |
|
|
|
|
|
|
| 204-02 |
temporary hay or straw
|
28   |
EACH |
25.00 |
700.00 |
|
|
|
|
|
|
| 204-06 |
temporary silt fencing
|
124   |
LNFT |
15.00 |
1,860.00 |
|
|
|
|
|
|
| 302-02-D |
class ii base course (12" thick)
|
2,337.0 |
SQYD |
30.00 |
70,110.00 |
|
|
|
|
|
|
| 304-01 |
lime
|
22.08 |
TON |
165.00 |
3,643.20 |
|
|
|
|
|
|
| 304-02-E |
lime treatment (type b) (8" thick)
|
2,337   |
SQYD |
6.00 |
14,022.00 |
|
|
|
|
|
|
| 601-01-G |
portland cement concrete pavement (8" thick)
|
2,193.1 |
SQYD |
53.70 |
117,769.47 |
|
|
|
|
|
|
| 701-02-D |
cross drain pipe arch (24" rcp/pcp)
|
42   |
LNFT |
80.00 |
3,360.00 |
|
|
|
|
|
|
| 701-03-F |
storm drain pipe (15" rcp/pcp)
|
72   |
LNFT |
60.00 |
4,320.00 |
|
|
|
|
|
|
| 701-04-A |
storm drain pipe arch (15" rcp/pcp)
|
34   |
LNFT |
70.00 |
2,380.00 |
|
|
|
|
|
|
| 702-02-F |
manholes (mh-01)
|
1   |
EACH |
2,500.00 |
2,500.00 |
|
|
|
|
|
|
| 702-03-C |
catch basins (cb-06)
|
4   |
EACH |
3,500.00 |
14,000.00 |
|
|
|
|
|
|
| 702-04-B |
adjusting catch basins
|
2   |
EACH |
1,500.00 |
3,000.00 |
|
|
|
|
|
|
| 706-01-A |
concrete walk (4" thick)
|
145.0 |
SQYD |
35.00 |
5,075.00 |
|
|
|
|
|
|
| 707-01 |
concrete curb
|
1,295.0 |
LNFT |
10.00 |
12,950.00 |
|
|
|
|
|
|
| 708-01 |
right-of-way monument
|
4   |
EACH |
150.00 |
600.00 |
|
|
|
|
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
8,000.00 |
8,000.00 |
|
|
|
|
|
|
| 717-01 |
seeding
|
77   |
LB |
3.00 |
231.00 |
|
|
|
|
|
|
| 718-01 |
fertilizer
|
257   |
LB |
3.00 |
771.00 |
|
|
|
|
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
7,500.00 |
7,500.00 |
|
|
|
|
|
|
| 729-01 |
sign (type a)
|
8.0 |
SQFT |
25.00 |
200.00 |
|
|
|
|
|
|
| 729-08-B |
mounting (3 1/2" post)
|
2   |
EACH |
75.00 |
150.00 |
|
|
|
|
|
|
| 731-02 |
reflectorized raised pavement markers
|
17   |
EACH |
6.00 |
102.00 |
|
|
|
|
|
|
| 732-01-A |
plastic pavement striping (4" width)
|
1,295   |
LNFT |
3.00 |
3,885.00 |
|
|
|
|
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
0.123 |
MILE |
3,850.00 |
473.55 |
|
|
|
|
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
4,000.00 |
4,000.00 |
|
|
|
|
|
|
| 744-01 |
traffic control management
|
lump |
LUMP |
2,500.00 |
2,500.00 |
|
|
|
|
|
|
| S-001 |
sawcutting (full depth)
|
211   |
INFT |
2.00 |
422.00 |
|
|
|
|
|
|
| S-002 |
cleaning existing ditches
|
273   |
LNFT |
8.00 |
2,184.00 |
|
|
|
|
|
|
| S-003 |
grading right-of-way area
|
lump |
LUMP |
3,500.00 |
3,500.00 |
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
312,838.22 |
|
|
|
|
|
|
|