| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - BARRIERE CONSTRUCTION CO., LLC |
- 2 - HARD ROCK CONSTRUCTION CO. |
- 3 - BOH BROS. CONSTRUCTION CO., LLC. |
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-01 |
removal of structures & obstructions
|
lump |
LUMP |
FREE |
FREE |
10,000.00 |
10,000.00 |
5,000.00 |
5,000.00 |
|
|
| 202-02-D |
removal of concrete walks & drives
|
477   |
SQYD |
12.00 |
5,724.00 |
20.00 |
9,540.00 |
6.00 |
2,862.00 |
|
|
| 202-02-E |
removal of concrete curbs
|
249.0 |
LNFT |
6.50 |
1,618.50 |
20.00 |
4,980.00 |
5.00 |
1,245.00 |
|
|
| 402-01 |
traffic maintenance aggregate (vehicular measurement)
|
50.0 |
CUYD |
90.00 |
4,500.00 |
100.00 |
5,000.00 |
75.00 |
3,750.00 |
|
|
| 602-02-A |
cleaning and resealing existing longitudinal pavement
joints |
19,841   |
LNFT |
3.00 |
59,523.00 |
4.00 |
79,364.00 |
3.00 |
59,523.00 |
|
|
| 602-02-B |
cleaning and resealing existing transverse pavement
joints |
39,671   |
LNFT |
3.50 |
138,848.50 |
0.00 |
0.00 |
5.50 |
218,190.50 |
|
|
| 602-03 |
cleaning and sealing random cracks
|
14,878   |
LNFT |
5.50 |
81,829.00 |
4.00 |
59,512.00 |
5.50 |
81,829.00 |
|
|
| 701-03-F |
storm drain pipe (15" rcp/pcp)
|
18   |
LNFT |
115.00 |
2,070.00 |
200.00 |
3,600.00 |
150.00 |
2,700.00 |
|
|
| 701-03-G-01 |
storm drain pipe (18" cmp only)(outfall)
|
351   |
LNFT |
145.00 |
50,895.00 |
150.00 |
52,650.00 |
160.00 |
56,160.00 |
|
|
| 702-03-A |
catch basins (cb-01)
|
13   |
EACH |
2,900.00 |
37,700.00 |
4,000.00 |
52,000.00 |
4,900.00 |
63,700.00 |
|
|
| 702-04-A |
adjusting manholes
|
20   |
EACH |
450.00 |
9,000.00 |
500.00 |
10,000.00 |
800.00 |
16,000.00 |
|
|
| 702-04-B |
adjusting catch basins
|
54   |
EACH |
1,000.00 |
54,000.00 |
1,000.00 |
54,000.00 |
1,000.00 |
54,000.00 |
|
|
| 706-01-A |
concrete walk (4" thick)
|
476.7 |
SQYD |
50.00 |
23,835.00 |
100.00 |
47,670.00 |
85.00 |
40,519.50 |
|
|
| 706-02-C |
concrete drive (6" thick)
|
31.0 |
SQYD |
60.00 |
1,860.00 |
100.00 |
3,100.00 |
100.00 |
3,100.00 |
|
|
| 707-01 |
concrete curb (barrier or mountable)
|
249.0 |
LNFT |
35.00 |
8,715.00 |
20.00 |
4,980.00 |
10.00 |
2,490.00 |
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
50,000.00 |
50,000.00 |
100,000.00 |
100,000.00 |
30,000.00 |
30,000.00 |
|
|
| 713-04-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
1.578 |
MILE |
350.00 |
552.30 |
1,000.00 |
1,578.00 |
1,500.00 |
2,367.00 |
|
|
| 713-05-A |
temporary pavement markings (solid line)(4" width)
|
2.225 |
MILE |
850.00 |
1,891.25 |
1,000.00 |
2,225.00 |
750.00 |
1,668.75 |
|
|
| 726-01 |
bedding material
|
304.9 |
CUYD |
55.00 |
16,769.50 |
60.00 |
18,294.00 |
80.00 |
24,392.00 |
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
135,000.00 |
135,000.00 |
300,000.00 |
300,000.00 |
250,000.00 |
250,000.00 |
|
|
| 731-02 |
reflectorized raised pavement markers
|
450   |
EACH |
6.00 |
2,700.00 |
5.00 |
2,250.00 |
5.50 |
2,475.00 |
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
5.775 |
MILE |
2,800.00 |
16,170.00 |
2,000.00 |
11,550.00 |
2,500.00 |
14,437.50 |
|
|
| 732-02-C |
plastic pavement striping (solid line) (8" width)
|
0.049 |
MILE |
5,600.00 |
274.40 |
5,000.00 |
245.00 |
5,000.00 |
245.00 |
|
|
| 732-02-D |
plastic pavement striping (solid line) (12" width)
|
0.073 |
MILE |
8,300.00 |
605.90 |
7,000.00 |
511.00 |
7,000.00 |
511.00 |
|
|
| 732-02-E |
plastic pavement striping (solid line) (24" width)
|
0.087 |
MILE |
16,000.00 |
1,392.00 |
14,000.00 |
1,219.40 |
15,000.00 |
1,305.00 |
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
2.505 |
MILE |
1,100.00 |
2,755.50 |
1,000.00 |
2,505.00 |
1,000.00 |
2,505.00 |
|
|
| 732-04-A |
plastic pavement legends & symbols (arrow)
|
4   |
EACH |
200.00 |
800.00 |
200.00 |
800.00 |
180.00 |
720.00 |
|
|
| 732-04-C |
plastic pavement legends & symbols (only)
|
4   |
EACH |
220.00 |
880.00 |
200.00 |
800.00 |
200.00 |
800.00 |
|
|
| 732-05 |
removal of existing markings
|
7.492 |
MILE |
5,700.00 |
42,704.40 |
6,000.00 |
44,952.00 |
6,000.00 |
44,952.00 |
|
|
| 736-09 |
loop detector
|
105   |
LNFT |
17.00 |
1,785.00 |
15.00 |
1,575.00 |
16.00 |
1,680.00 |
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
40,000.00 |
40,000.00 |
79,000.00 |
79,000.00 |
5,000.00 |
5,000.00 |
|
|
| 744-01 |
traffic control management
|
lump |
LUMP |
15,000.00 |
15,000.00 |
100,000.00 |
100,000.00 |
5,000.00 |
5,000.00 |
|
|
| 812-01-A |
treated timber (land and fresh water)
|
0.24 |
MFBM |
6,600.00 |
1,584.00 |
1,000.00 |
240.00 |
800.00 |
192.00 |
|
|
| S-001 |
pccp panel replacement (9" thick pccp)(3" granular
base)(barrier or mountable curb included) |
9,255   |
SQYD |
110.00 |
1,018,050.00 |
95.00 |
879,225.00 |
110.00 |
1,018,050.00 |
|
|
| S-002 |
pccp panel replacement (9" thick pccp)(24" granular
base on geotextile fabric)(barrier or mountable curb included) |
9,255   |
SQYD |
120.00 |
1,110,600.00 |
115.00 |
1,064,325.00 |
120.00 |
1,110,600.00 |
|
|
| S-003 |
full depth saw cutting
|
2,450.0 |
LNFT |
4.50 |
11,025.00 |
10.00 |
24,500.00 |
8.00 |
19,600.00 |
|
|
| S-004 |
integral detectable warning system on walking surfaces
|
48   |
EACH |
250.00 |
12,000.00 |
200.00 |
9,600.00 |
250.00 |
12,000.00 |
|
|
| S-006 |
construction photographs and inventory
|
lump |
LUMP |
7,000.00 |
7,000.00 |
6,000.00 |
6,000.00 |
10,000.00 |
10,000.00 |
|
|
| S-007 |
pccp panel replacement surcharge
|
7,404   |
SQYD |
5.00 |
37,020.00 |
8.00 |
59,232.00 |
9.00 |
66,636.00 |
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | ITEM TOTAL (CONSTRUCTION BID) |
|
|
|
3,006,677.25 |
|
3,107,022.40 |
|
3,236,205.25 |
|
|
| | Number of Days Bid at $1,000 per day. |
|
|
150 |
150,000.00 |
150 |
150,000.00 |
150 |
150,000.00 |
0 |
|
| | TOTAL BID |
|
|
|
3,156,677.25 |
|
3,257,022.40 |
|
3,386,205.25 |
|
|
|