| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - COASTAL BRIDGE CO., L.L.C. |
- 2 - JAMES CONSTRUCTION GROUP LLC |
- 3 - SHAVERS-WHITTLE CONSTRUCTION INC |
- 4 - ROSIEK CONSTRUCTION CO INC |
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 201-01 |
clearing & grubbing
|
lump |
LUMP |
10,000.00 |
10,000.00 |
50,000.00 |
50,000.00 |
45,000.00 |
45,000.00 |
300,000.00 |
300,000.00 |
| 202-01 |
removal of structures & obstructions
|
lump |
LUMP |
10,000.00 |
10,000.00 |
5,000.00 |
5,000.00 |
50,000.00 |
50,000.00 |
100,000.00 |
100,000.00 |
| 202-02-A-01 |
removal of bridge(23'x212' pontoon bridge and
approaches) |
1   |
EACH |
50,000.00 |
50,000.00 |
150,000.00 |
150,000.00 |
95,000.00 |
95,000.00 |
150,000.00 |
150,000.00 |
| 202-02-A-02 |
removal of bridge (remaining swing bridge substructure)
|
1   |
EACH |
75,000.00 |
75,000.00 |
40,000.00 |
40,000.00 |
85,000.00 |
85,000.00 |
100,000.00 |
100,000.00 |
| 202-02-G |
removal of surfacing & stabilized base
|
1,636.4 |
SQYD |
8.00 |
13,091.20 |
12.00 |
19,636.80 |
25.00 |
40,910.00 |
10.00 |
16,364.00 |
| 202-02-H |
removal of guard rail
|
550   |
LNFT |
6.00 |
3,300.00 |
4.00 |
2,200.00 |
15.00 |
8,250.00 |
6.00 |
3,300.00 |
| 202-02-I |
removal of existing embankment
|
110   |
CUYD |
20.00 |
2,200.00 |
70.00 |
7,700.00 |
20.00 |
2,200.00 |
55.00 |
6,050.00 |
| 203-06 |
excavation & embankment
|
lump |
LUMP |
20,000.00 |
20,000.00 |
69,000.00 |
69,000.00 |
75,000.00 |
75,000.00 |
50,000.00 |
50,000.00 |
| 204-06 |
temporary silt fencing
|
1,250   |
LNFT |
3.00 |
3,750.00 |
4.50 |
5,625.00 |
2.50 |
3,125.00 |
4.00 |
5,000.00 |
| 302-02-D-01 |
class ii base course (12" thick)(crushed stone or
recycled pccp) |
799.3 |
SQYD |
100.00 |
79,930.00 |
55.00 |
43,961.50 |
60.00 |
47,958.00 |
35.00 |
27,975.50 |
| 304-01 |
lime
|
4.75 |
TON |
600.00 |
2,850.00 |
150.00 |
712.50 |
200.00 |
950.00 |
135.00 |
641.25 |
| 304-04-D |
lime treatment (type d) (12" thick)
|
340   |
SQYD |
10.00 |
3,400.00 |
15.00 |
5,100.00 |
3.50 |
1,190.00 |
15.00 |
5,100.00 |
| 402-01 |
traffic maintenance aggregate (vehicular measurement)
|
100.0 |
CUYD |
80.00 |
8,000.00 |
75.00 |
7,500.00 |
50.00 |
5,000.00 |
100.00 |
10,000.00 |
| 502-01 |
superpave asphaltic concrete
|
213.6 |
TON |
200.00 |
42,720.00 |
262.00 |
55,963.20 |
300.00 |
64,080.00 |
262.00 |
55,963.20 |
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
60.0 |
TON |
200.00 |
12,000.00 |
262.00 |
15,720.00 |
300.00 |
18,000.00 |
262.00 |
15,720.00 |
| 701-06-B |
side drain pipe arch (18" equiv.)
|
84   |
LNFT |
60.00 |
5,040.00 |
90.00 |
7,560.00 |
45.00 |
3,780.00 |
50.00 |
4,200.00 |
| 704-08-B |
guard rail transitions (double thrie beam)
|
100.0 |
LNFT |
80.00 |
8,000.00 |
60.00 |
6,000.00 |
70.00 |
7,000.00 |
52.00 |
5,200.00 |
| 704-11-B |
guard rail end treatment (tangent)
|
4   |
EACH |
3,300.00 |
13,200.00 |
2,600.00 |
10,400.00 |
3,300.00 |
13,200.00 |
2,300.00 |
9,200.00 |
| 705-06-A |
chain link fence (4-foot height)
|
292   |
LNFT |
25.00 |
7,300.00 |
20.00 |
5,840.00 |
20.00 |
5,840.00 |
17.00 |
4,964.00 |
| 705-07-A |
4-foot single gates for chain link fence (4-foot
height) |
1   |
EACH |
850.00 |
850.00 |
700.00 |
700.00 |
600.00 |
600.00 |
600.00 |
600.00 |
| 705-08-A-01 |
10-foot double gates for chain link fence (4-foot
height) |
1   |
DBGT |
1,600.00 |
1,600.00 |
1,500.00 |
1,500.00 |
1,000.00 |
1,000.00 |
1,000.00 |
1,000.00 |
| 705-08-A-02 |
16-foot double gates for chain link fence (4-foot
height) |
1   |
DBGT |
1,600.00 |
1,600.00 |
2,500.00 |
2,500.00 |
1,200.00 |
1,200.00 |
2,000.00 |
2,000.00 |
| 708-01 |
right-of-way monument
|
19   |
EACH |
300.00 |
5,700.00 |
150.00 |
2,850.00 |
175.00 |
3,325.00 |
150.00 |
2,850.00 |
| 708-02 |
right-of-way monument witness post
|
19   |
EACH |
150.00 |
2,850.00 |
100.00 |
1,900.00 |
155.00 |
2,945.00 |
120.00 |
2,280.00 |
| 712-04 |
flexible revetment
|
41   |
SQYD |
85.00 |
3,485.00 |
100.00 |
4,100.00 |
200.00 |
8,200.00 |
120.00 |
4,920.00 |
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
50,000.00 |
50,000.00 |
60,000.00 |
60,000.00 |
150,000.00 |
150,000.00 |
150,000.00 |
150,000.00 |
| 713-05-A-01 |
temporary pavement markings (solid line)(4" width)
(type i removable) |
0.558 |
MILE |
17,000.00 |
9,486.00 |
15,000.00 |
8,370.00 |
18,000.00 |
10,044.00 |
15,000.00 |
8,370.00 |
| 713-08 |
temporary precast concrete barrier (contractor
furnished) |
46   |
EACH |
1,000.00 |
46,000.00 |
1,200.00 |
55,200.00 |
1,600.00 |
73,600.00 |
925.00 |
42,550.00 |
| 720-01-A |
erosion control system, slope protection (type a)
|
249   |
SQYD |
7.00 |
1,743.00 |
4.00 |
996.00 |
11.50 |
2,863.50 |
5.00 |
1,245.00 |
| 722-01 |
project site laboratory
|
1   |
EACH |
10,000.00 |
10,000.00 |
10,000.00 |
10,000.00 |
150,000.00 |
150,000.00 |
15,000.00 |
15,000.00 |
| 727-01 |
mobilization
|
lump |
LUMP |
465,000.00 |
465,000.00 |
990,000.00 |
990,000.00 |
845,000.00 |
845,000.00 |
1,150,000.00 |
1,150,000.00 |
| 729-16-C |
object marker assembly (type 3)
|
4   |
EACH |
80.00 |
320.00 |
75.00 |
300.00 |
100.00 |
400.00 |
70.00 |
280.00 |
| 730-09 |
electrical system
|
lump |
LUMP |
900,000.00 |
900,000.00 |
960,000.00 |
960,000.00 |
1,260,000.00 |
1,260,000.00 |
1,200,000.00 |
1,200,000.00 |
| 731-02 |
reflectorized raised pavement markers
|
111   |
EACH |
7.50 |
832.50 |
6.00 |
666.00 |
7.00 |
777.00 |
6.00 |
666.00 |
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
0.524 |
MILE |
4,000.00 |
2,096.00 |
2,600.00 |
1,362.40 |
3,500.00 |
1,834.00 |
2,700.00 |
1,414.80 |
| 732-05 |
removal of existing markings
|
0.148 |
MILE |
8,000.00 |
1,184.00 |
7,300.00 |
1,080.40 |
10,000.00 |
1,480.00 |
7,200.00 |
1,065.60 |
| 739-01 |
hydro-seeding
|
1.00 |
ACRE |
3,000.00 |
3,000.00 |
1,800.00 |
1,800.00 |
1,850.00 |
1,850.00 |
6,100.00 |
6,100.00 |
| 740-01 |
construction layout
|
lump |
LUMP |
60,000.00 |
60,000.00 |
100,000.00 |
100,000.00 |
325,000.00 |
325,000.00 |
400,000.00 |
400,000.00 |
| 744-01 |
traffic control management
|
lump |
LUMP |
20,000.00 |
20,000.00 |
5,000.00 |
5,000.00 |
35,000.00 |
35,000.00 |
200,000.00 |
200,000.00 |
| 804-01-C |
precast concrete piles (16")
|
2,988   |
LNFT |
60.00 |
179,280.00 |
65.00 |
194,220.00 |
72.00 |
215,136.00 |
130.00 |
388,440.00 |
| 804-01-F |
precast concrete piles (24")
|
2,904   |
LNFT |
100.00 |
290,400.00 |
125.00 |
363,000.00 |
130.00 |
377,520.00 |
170.00 |
493,680.00 |
| 804-02-B |
treated timber piles (coastal treatment)
|
8,520   |
LNFT |
19.25 |
164,010.00 |
30.00 |
255,600.00 |
45.00 |
383,400.00 |
25.00 |
213,000.00 |
| 804-05 |
precast concrete test piles
|
1   |
EACH |
25,000.00 |
25,000.00 |
50,000.00 |
50,000.00 |
65,000.00 |
65,000.00 |
15,000.00 |
15,000.00 |
| 804-09 |
loading test piles
|
1   |
EACH |
10,000.00 |
10,000.00 |
20,000.00 |
20,000.00 |
25,000.00 |
25,000.00 |
40,000.00 |
40,000.00 |
| 804-10 |
reloading test piles
|
1   |
EACH |
100.00 |
100.00 |
2,000.00 |
2,000.00 |
1.00 |
1.00 |
5,000.00 |
5,000.00 |
| 804-11 |
redriving test piles
|
1   |
EACH |
100.00 |
100.00 |
1,000.00 |
1,000.00 |
1.00 |
1.00 |
1,500.00 |
1,500.00 |
| 804-12 |
loading permanent piles
|
1   |
EACH |
100.00 |
100.00 |
1,000.00 |
1,000.00 |
1.00 |
1.00 |
50,000.00 |
50,000.00 |
| 804-17 |
dynamic monitoring
|
3   |
EACH |
4,000.00 |
12,000.00 |
1,500.00 |
4,500.00 |
1,200.00 |
3,600.00 |
2,500.00 |
7,500.00 |
| 805-02-F |
class a(m) concrete (bents)
|
410.13 |
CUYD |
850.00 |
348,610.50 |
1,000.00 |
410,130.00 |
2,250.00 |
922,792.50 |
2,000.00 |
820,260.00 |
| 805-04 |
class aa(m) concrete
|
439.40 |
CUYD |
850.00 |
373,490.00 |
850.00 |
373,490.00 |
1,800.00 |
790,920.00 |
2,000.00 |
878,800.00 |
| 806-01 |
deformed reinforcing steel
|
156,696   |
LB |
1.00 |
156,696.00 |
1.00 |
156,696.00 |
1.00 |
156,696.00 |
1.50 |
235,044.00 |
| 807-06 |
structural metalwork
|
lump |
LUMP |
950,000.00 |
950,000.00 |
1,800,000.00 |
1,800,000.00 |
1,500,000.00 |
1,500,000.00 |
1,400,000.00 |
1,400,000.00 |
| 809-01 |
movable bridge machinery
|
lump |
LUMP |
780,000.00 |
780,000.00 |
1,750,000.00 |
1,750,000.00 |
1,000,000.00 |
1,000,000.00 |
1,300,000.00 |
1,300,000.00 |
| 809-02 |
traffic barriers
|
lump |
LUMP |
160,000.00 |
160,000.00 |
400,000.00 |
400,000.00 |
300,000.00 |
300,000.00 |
350,000.00 |
350,000.00 |
| 809-03 |
operating house
|
lump |
LUMP |
250,000.00 |
250,000.00 |
680,000.00 |
680,000.00 |
498,000.00 |
498,000.00 |
500,000.00 |
500,000.00 |
| 810-01 |
concrete railing (barrier)
|
485.60 |
LNFT |
50.00 |
24,280.00 |
55.00 |
26,708.00 |
150.00 |
72,840.00 |
200.00 |
97,120.00 |
| 810-02 |
steel railing
|
247.33 |
LNFT |
372.00 |
92,006.76 |
550.00 |
136,031.50 |
545.00 |
134,794.85 |
300.00 |
74,199.00 |
| 810-03 |
pipe railing
|
253.34 |
LNFT |
80.00 |
20,267.20 |
175.00 |
44,334.50 |
230.00 |
58,268.20 |
130.00 |
32,934.20 |
| 812-01-B |
treated timber (coastal treatment)
|
27.70 |
MFBM |
6,400.00 |
177,280.00 |
7,200.00 |
199,440.00 |
14,500.00 |
401,650.00 |
4,600.00 |
127,420.00 |
| 813-01 |
concrete approach slabs
|
146.67 |
SQYD |
200.00 |
29,334.00 |
220.00 |
32,267.40 |
430.00 |
63,068.10 |
200.00 |
29,334.00 |
| 813-02 |
concrete approach slabs (pile supported)
|
220.00 |
SQYD |
363.00 |
79,860.00 |
300.00 |
66,000.00 |
750.00 |
165,000.00 |
600.00 |
132,000.00 |
| S-001 |
geogrid
|
999.3 |
SQYD |
5.00 |
4,996.50 |
6.00 |
5,995.80 |
13.00 |
12,990.90 |
8.00 |
7,994.40 |
| S-002 |
dynamic analysis
|
3   |
EACH |
3,000.00 |
9,000.00 |
800.00 |
2,400.00 |
2,000.00 |
6,000.00 |
1,800.00 |
5,400.00 |
| S-003 |
solar panel traffic signals
|
2   |
EACH |
46,000.00 |
92,000.00 |
50,000.00 |
100,000.00 |
50,000.00 |
100,000.00 |
35,000.00 |
70,000.00 |
| S-004 |
impact attenuators (construction zone)
|
4   |
EACH |
20,000.00 |
80,000.00 |
22,000.00 |
88,000.00 |
20,000.00 |
80,000.00 |
16,500.00 |
66,000.00 |
| S-005 |
movable bridge operation
|
lump |
LUMP |
100,000.00 |
100,000.00 |
50,000.00 |
50,000.00 |
50,000.00 |
50,000.00 |
200,000.00 |
200,000.00 |
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
6,364,338.66 |
|
9,929,057.00 |
|
10,829,281.05 |
|
11,600,644.95 |
|