Letting of 9/27/2006 LA DOTD Headquarters


 
go back
Go Back
DBE GOAL FED
Lead Project: 852-21-0024
Parish: ST TAMMANY
Routes: LA 433
Description: BAYOU LIBERTY BRIDGE AND APPROACHES (BONFOUCA)
Type Const: removal of bridges, class ii base course, superpave asph conc pavement, swing span
bridge, movable bridge machinery, and related work.
Estimated Construction Cost: $5,626,589.65
 
RankLicenseBidderConstruction Bid
1 00481 COASTAL BRIDGE CO., L.L.C. $6,364,338.66
2 34567 JAMES CONSTRUCTION GROUP LLC $9,929,057.00
3 36827 SHAVERS-WHITTLE CONSTRUCTION INC $10,829,281.05
4 07779 ROSIEK CONSTRUCTION CO INC $11,600,644.95
 
Item Number Item Description Quantity Unit of Measure - 1 -
COASTAL BRIDGE CO., L.L.C.
- 2 -
JAMES CONSTRUCTION GROUP LLC
- 3 -
SHAVERS-WHITTLE CONSTRUCTION INC
- 4 -
ROSIEK CONSTRUCTION CO INC
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
201-01 clearing & grubbing lump      LUMP 10,000.00 10,000.00 50,000.00 50,000.00 45,000.00 45,000.00 300,000.00 300,000.00
202-01 removal of structures & obstructions lump      LUMP 10,000.00 10,000.00 5,000.00 5,000.00 50,000.00 50,000.00 100,000.00 100,000.00
202-02-A-01 removal of bridge(23'x212' pontoon bridge and
approaches)
1      EACH 50,000.00 50,000.00 150,000.00 150,000.00 95,000.00 95,000.00 150,000.00 150,000.00
202-02-A-02 removal of bridge (remaining swing bridge substructure) 1      EACH 75,000.00 75,000.00 40,000.00 40,000.00 85,000.00 85,000.00 100,000.00 100,000.00
202-02-G removal of surfacing & stabilized base 1,636.4    SQYD 8.00 13,091.20 12.00 19,636.80 25.00 40,910.00 10.00 16,364.00
202-02-H removal of guard rail 550      LNFT 6.00 3,300.00 4.00 2,200.00 15.00 8,250.00 6.00 3,300.00
202-02-I removal of existing embankment 110      CUYD 20.00 2,200.00 70.00 7,700.00 20.00 2,200.00 55.00 6,050.00
203-06 excavation & embankment lump      LUMP 20,000.00 20,000.00 69,000.00 69,000.00 75,000.00 75,000.00 50,000.00 50,000.00
204-06 temporary silt fencing 1,250      LNFT 3.00 3,750.00 4.50 5,625.00 2.50 3,125.00 4.00 5,000.00
302-02-D-01 class ii base course (12" thick)(crushed stone or
recycled pccp)
799.3    SQYD 100.00 79,930.00 55.00 43,961.50 60.00 47,958.00 35.00 27,975.50
304-01 lime 4.75   TON 600.00 2,850.00 150.00 712.50 200.00 950.00 135.00 641.25
304-04-D lime treatment (type d) (12" thick) 340      SQYD 10.00 3,400.00 15.00 5,100.00 3.50 1,190.00 15.00 5,100.00
402-01 traffic maintenance aggregate (vehicular measurement) 100.0    CUYD 80.00 8,000.00 75.00 7,500.00 50.00 5,000.00 100.00 10,000.00
502-01 superpave asphaltic concrete 213.6    TON 200.00 42,720.00 262.00 55,963.20 300.00 64,080.00 262.00 55,963.20
502-01-A superpave asphaltic concrete, drives, turnouts and
miscellaneous
60.0    TON 200.00 12,000.00 262.00 15,720.00 300.00 18,000.00 262.00 15,720.00
701-06-B side drain pipe arch (18" equiv.) 84      LNFT 60.00 5,040.00 90.00 7,560.00 45.00 3,780.00 50.00 4,200.00
704-08-B guard rail transitions (double thrie beam) 100.0    LNFT 80.00 8,000.00 60.00 6,000.00 70.00 7,000.00 52.00 5,200.00
704-11-B guard rail end treatment (tangent) 4      EACH 3,300.00 13,200.00 2,600.00 10,400.00 3,300.00 13,200.00 2,300.00 9,200.00
705-06-A chain link fence (4-foot height) 292      LNFT 25.00 7,300.00 20.00 5,840.00 20.00 5,840.00 17.00 4,964.00
705-07-A 4-foot single gates for chain link fence (4-foot
height)
1      EACH 850.00 850.00 700.00 700.00 600.00 600.00 600.00 600.00
705-08-A-01 10-foot double gates for chain link fence (4-foot
height)
1      DBGT 1,600.00 1,600.00 1,500.00 1,500.00 1,000.00 1,000.00 1,000.00 1,000.00
705-08-A-02 16-foot double gates for chain link fence (4-foot
height)
1      DBGT 1,600.00 1,600.00 2,500.00 2,500.00 1,200.00 1,200.00 2,000.00 2,000.00
708-01 right-of-way monument 19      EACH 300.00 5,700.00 150.00 2,850.00 175.00 3,325.00 150.00 2,850.00
708-02 right-of-way monument witness post 19      EACH 150.00 2,850.00 100.00 1,900.00 155.00 2,945.00 120.00 2,280.00
712-04 flexible revetment 41      SQYD 85.00 3,485.00 100.00 4,100.00 200.00 8,200.00 120.00 4,920.00
713-01 temporary signs & barricades lump      LUMP 50,000.00 50,000.00 60,000.00 60,000.00 150,000.00 150,000.00 150,000.00 150,000.00
713-05-A-01 temporary pavement markings (solid line)(4" width)
(type i removable)
0.558  MILE 17,000.00 9,486.00 15,000.00 8,370.00 18,000.00 10,044.00 15,000.00 8,370.00
713-08 temporary precast concrete barrier (contractor
furnished)
46      EACH 1,000.00 46,000.00 1,200.00 55,200.00 1,600.00 73,600.00 925.00 42,550.00
720-01-A erosion control system, slope protection (type a) 249      SQYD 7.00 1,743.00 4.00 996.00 11.50 2,863.50 5.00 1,245.00
722-01 project site laboratory 1      EACH 10,000.00 10,000.00 10,000.00 10,000.00 150,000.00 150,000.00 15,000.00 15,000.00
727-01 mobilization lump      LUMP 465,000.00 465,000.00 990,000.00 990,000.00 845,000.00 845,000.00 1,150,000.00 1,150,000.00
729-16-C object marker assembly (type 3) 4      EACH 80.00 320.00 75.00 300.00 100.00 400.00 70.00 280.00
730-09 electrical system lump      LUMP 900,000.00 900,000.00 960,000.00 960,000.00 1,260,000.00 1,260,000.00 1,200,000.00 1,200,000.00
731-02 reflectorized raised pavement markers 111      EACH 7.50 832.50 6.00 666.00 7.00 777.00 6.00 666.00
732-02-A plastic pavement striping (solid line) (4" width) 0.524  MILE 4,000.00 2,096.00 2,600.00 1,362.40 3,500.00 1,834.00 2,700.00 1,414.80
732-05 removal of existing markings 0.148  MILE 8,000.00 1,184.00 7,300.00 1,080.40 10,000.00 1,480.00 7,200.00 1,065.60
739-01 hydro-seeding 1.00   ACRE 3,000.00 3,000.00 1,800.00 1,800.00 1,850.00 1,850.00 6,100.00 6,100.00
740-01 construction layout lump      LUMP 60,000.00 60,000.00 100,000.00 100,000.00 325,000.00 325,000.00 400,000.00 400,000.00
744-01 traffic control management lump      LUMP 20,000.00 20,000.00 5,000.00 5,000.00 35,000.00 35,000.00 200,000.00 200,000.00
804-01-C precast concrete piles (16") 2,988      LNFT 60.00 179,280.00 65.00 194,220.00 72.00 215,136.00 130.00 388,440.00
804-01-F precast concrete piles (24") 2,904      LNFT 100.00 290,400.00 125.00 363,000.00 130.00 377,520.00 170.00 493,680.00
804-02-B treated timber piles (coastal treatment) 8,520      LNFT 19.25 164,010.00 30.00 255,600.00 45.00 383,400.00 25.00 213,000.00
804-05 precast concrete test piles 1      EACH 25,000.00 25,000.00 50,000.00 50,000.00 65,000.00 65,000.00 15,000.00 15,000.00
804-09 loading test piles 1      EACH 10,000.00 10,000.00 20,000.00 20,000.00 25,000.00 25,000.00 40,000.00 40,000.00
804-10 reloading test piles 1      EACH 100.00 100.00 2,000.00 2,000.00 1.00 1.00 5,000.00 5,000.00
804-11 redriving test piles 1      EACH 100.00 100.00 1,000.00 1,000.00 1.00 1.00 1,500.00 1,500.00
804-12 loading permanent piles 1      EACH 100.00 100.00 1,000.00 1,000.00 1.00 1.00 50,000.00 50,000.00
804-17 dynamic monitoring 3      EACH 4,000.00 12,000.00 1,500.00 4,500.00 1,200.00 3,600.00 2,500.00 7,500.00
805-02-F class a(m) concrete (bents) 410.13   CUYD 850.00 348,610.50 1,000.00 410,130.00 2,250.00 922,792.50 2,000.00 820,260.00
805-04 class aa(m) concrete 439.40   CUYD 850.00 373,490.00 850.00 373,490.00 1,800.00 790,920.00 2,000.00 878,800.00
806-01 deformed reinforcing steel 156,696      LB 1.00 156,696.00 1.00 156,696.00 1.00 156,696.00 1.50 235,044.00
807-06 structural metalwork lump      LUMP 950,000.00 950,000.00 1,800,000.00 1,800,000.00 1,500,000.00 1,500,000.00 1,400,000.00 1,400,000.00
809-01 movable bridge machinery lump      LUMP 780,000.00 780,000.00 1,750,000.00 1,750,000.00 1,000,000.00 1,000,000.00 1,300,000.00 1,300,000.00
809-02 traffic barriers lump      LUMP 160,000.00 160,000.00 400,000.00 400,000.00 300,000.00 300,000.00 350,000.00 350,000.00
809-03 operating house lump      LUMP 250,000.00 250,000.00 680,000.00 680,000.00 498,000.00 498,000.00 500,000.00 500,000.00
810-01 concrete railing (barrier) 485.60   LNFT 50.00 24,280.00 55.00 26,708.00 150.00 72,840.00 200.00 97,120.00
810-02 steel railing 247.33   LNFT 372.00 92,006.76 550.00 136,031.50 545.00 134,794.85 300.00 74,199.00
810-03 pipe railing 253.34   LNFT 80.00 20,267.20 175.00 44,334.50 230.00 58,268.20 130.00 32,934.20
812-01-B treated timber (coastal treatment) 27.70   MFBM 6,400.00 177,280.00 7,200.00 199,440.00 14,500.00 401,650.00 4,600.00 127,420.00
813-01 concrete approach slabs 146.67   SQYD 200.00 29,334.00 220.00 32,267.40 430.00 63,068.10 200.00 29,334.00
813-02 concrete approach slabs (pile supported) 220.00   SQYD 363.00 79,860.00 300.00 66,000.00 750.00 165,000.00 600.00 132,000.00
S-001 geogrid 999.3    SQYD 5.00 4,996.50 6.00 5,995.80 13.00 12,990.90 8.00 7,994.40
S-002 dynamic analysis 3      EACH 3,000.00 9,000.00 800.00 2,400.00 2,000.00 6,000.00 1,800.00 5,400.00
S-003 solar panel traffic signals 2      EACH 46,000.00 92,000.00 50,000.00 100,000.00 50,000.00 100,000.00 35,000.00 70,000.00
S-004 impact attenuators (construction zone) 4      EACH 20,000.00 80,000.00 22,000.00 88,000.00 20,000.00 80,000.00 16,500.00 66,000.00
S-005 movable bridge operation lump      LUMP 100,000.00 100,000.00 50,000.00 50,000.00 50,000.00 50,000.00 200,000.00 200,000.00
                       
 CONTRACTOR TOTAL       6,364,338.66   9,929,057.00   10,829,281.05   11,600,644.95