| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - BARRIERE CONSTRUCTION CO., LLC |
- 2 - HARD ROCK CONSTRUCTION CO. |
- 3 - BOH BROS. CONSTRUCTION CO., LLC. |
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-01 |
removal of structures and obstructions
|
lump |
lump |
10,000.00 |
10,000.00 |
10,000.00 |
10,000.00 |
11,000.00 |
11,000.00 |
|
|
| 202-02-D |
removal of concrete walks & drives
|
536   |
SQYD |
15.00 |
8,040.00 |
20.00 |
10,720.00 |
6.00 |
3,216.00 |
|
|
| 202-02-E |
removal of concrete curb
|
51.2 |
LNFT |
6.50 |
332.80 |
20.00 |
1,024.00 |
25.00 |
1,280.00 |
|
|
| 402-01 |
traffic maintenance aggregate (vehicular measurement)
|
90.0 |
CUYD |
90.00 |
8,100.00 |
100.00 |
9,000.00 |
60.00 |
5,400.00 |
|
|
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
1.0 |
TON |
300.00 |
300.00 |
500.00 |
500.00 |
800.00 |
800.00 |
|
|
| 602-02-A |
cleaning and resealing existing longitudinal pavement
joints |
20,881   |
LNFT |
3.00 |
62,643.00 |
4.00 |
83,524.00 |
3.00 |
62,643.00 |
|
|
| 602-02-B |
cleaning and resealing existing transverse pavement
joints |
41,769   |
LNFT |
3.50 |
146,191.50 |
0.00 |
0.00 |
7.50 |
313,267.50 |
|
|
| 602-03 |
cleaning and sealing random cracks
|
15,000   |
LNFT |
5.50 |
82,500.00 |
4.00 |
60,000.00 |
5.25 |
78,750.00 |
|
|
| 701-03-F |
storm drain pipe (15" rcp/pcp)
|
388   |
LNFT |
115.00 |
44,620.00 |
200.00 |
77,600.00 |
135.00 |
52,380.00 |
|
|
| 701-03-G-01 |
storm drain pipe (18" cmp only)(outfall)
|
130   |
LNFT |
145.00 |
18,850.00 |
200.00 |
26,000.00 |
140.00 |
18,200.00 |
|
|
| 701-03-H-01 |
storm drain pipe (21" cmp only)(outfall)
|
330   |
LNFT |
150.00 |
49,500.00 |
200.00 |
66,000.00 |
150.00 |
49,500.00 |
|
|
| 702-03-A |
catch basins (cb-01) with type c grate
|
13   |
EACH |
2,900.00 |
37,700.00 |
4,000.00 |
52,000.00 |
4,900.00 |
63,700.00 |
|
|
| 702-04-A |
adjusting manholes
|
13   |
EACH |
450.00 |
5,850.00 |
500.00 |
6,500.00 |
1,000.00 |
13,000.00 |
|
|
| 702-04-B |
adjusting catch basins
|
6   |
EACH |
1,200.00 |
7,200.00 |
1,000.00 |
6,000.00 |
1,200.00 |
7,200.00 |
|
|
| 706-01-A |
concrete walk (4" thick)
|
525.6 |
SQYD |
50.00 |
26,280.00 |
100.00 |
52,560.00 |
75.00 |
39,420.00 |
|
|
| 706-02-C |
concrete drive (6" thick)
|
33.1 |
SQYD |
70.00 |
2,317.00 |
100.00 |
3,310.00 |
100.00 |
3,310.00 |
|
|
| 707-01 |
concrete curb
|
508.0 |
LNFT |
35.00 |
17,780.00 |
20.00 |
10,160.00 |
10.00 |
5,080.00 |
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
50,000.00 |
50,000.00 |
75,000.00 |
75,000.00 |
30,000.00 |
30,000.00 |
|
|
| 713-04-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
0.750 |
MILE |
350.00 |
262.50 |
1,000.00 |
750.00 |
1,500.00 |
1,125.00 |
|
|
| 713-05-A |
temporary pavement markings (solid line)(4" width)
|
1.125 |
MILE |
1,800.00 |
2,025.00 |
1,000.00 |
1,125.00 |
1,700.00 |
1,912.50 |
|
|
| 726-01 |
bedding material
|
542.3 |
CUYD |
55.00 |
29,826.50 |
60.00 |
32,538.00 |
70.00 |
37,961.00 |
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
170,000.00 |
170,000.00 |
200,000.00 |
200,000.00 |
164,000.00 |
164,000.00 |
|
|
| 731-02 |
reflectorized raised pavement markers (class iv)
|
417   |
EACH |
6.00 |
2,502.00 |
5.00 |
2,085.00 |
5.50 |
2,293.50 |
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
6.901 |
MILE |
2,800.00 |
19,322.80 |
2,000.00 |
13,802.00 |
2,400.00 |
16,562.40 |
|
|
| 732-02-C |
plastic pavement striping (solid line) (8" width)
|
0.049 |
MILE |
5,600.00 |
274.40 |
5,000.00 |
246.00 |
5,000.00 |
245.00 |
|
|
| 732-02-D |
plastic pavement striping (solid line) (12" width)
|
0.055 |
MILE |
8,300.00 |
456.50 |
7,000.00 |
385.00 |
8,000.00 |
440.00 |
|
|
| 732-02-E |
plastic pavement striping (solid line) (24" width)
|
0.087 |
MILE |
16,000.00 |
1,392.00 |
14,000.00 |
1,218.00 |
15,000.00 |
1,305.00 |
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
4.342 |
MILE |
1,100.00 |
4,776.20 |
1,000.00 |
4,342.00 |
1,000.00 |
4,342.00 |
|
|
| 732-04-A |
plastic pavement legends & symbols (left turn arrow)
|
8   |
EACH |
200.00 |
1,600.00 |
200.00 |
1,600.00 |
180.00 |
1,440.00 |
|
|
| 732-04-C |
plastic pavement legends & symbols (only)
|
4   |
EACH |
220.00 |
880.00 |
200.00 |
800.00 |
200.00 |
800.00 |
|
|
| 732-05 |
removal of existing markings
|
9.134 |
MILE |
5,700.00 |
52,063.80 |
6,000.00 |
54,804.00 |
6,000.00 |
54,804.00 |
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
20,000.00 |
20,000.00 |
25,000.00 |
25,000.00 |
10,000.00 |
10,000.00 |
|
|
| 744-01 |
traffic control management
|
lump |
LUMP |
13,000.00 |
13,000.00 |
68,000.00 |
68,000.00 |
5,000.00 |
5,000.00 |
|
|
| 812-01-A |
treated timber (land and fresh water)
|
5.23 |
MFBM |
5,000.00 |
26,150.00 |
1,000.00 |
5,230.00 |
800.00 |
4,184.00 |
|
|
| S-001 |
pccp panel replacement (9" thick pccp)(3" granular
base)(barrier or mountable curb included) |
4,378   |
SQYD |
110.00 |
481,580.00 |
97.00 |
424,666.00 |
120.00 |
525,360.00 |
|
|
| S-002 |
pccp panel replacement (9" thick pccp)(24" granular
base on geotextile fabric)(barrier or mountable curb included) |
4,378   |
SQYD |
120.00 |
525,360.00 |
117.00 |
512,226.00 |
130.00 |
569,140.00 |
|
|
| S-003 |
full depth saw cutting
|
3,781.0 |
LNFT |
4.50 |
17,014.50 |
10.00 |
37,810.00 |
8.00 |
30,248.00 |
|
|
| S-004 |
integral detectable warning system on walking surfaces
|
44   |
EACH |
250.00 |
11,000.00 |
200.00 |
8,800.00 |
250.00 |
11,000.00 |
|
|
| S-005 |
catch basins (jefferson parish standard type ii)
|
7   |
EACH |
2,200.00 |
15,400.00 |
3,000.00 |
21,000.00 |
3,500.00 |
24,500.00 |
|
|
| S-006 |
construction photographs and inventory
|
lump |
LUMP |
6,000.00 |
6,000.00 |
5,000.00 |
5,000.00 |
10,000.00 |
10,000.00 |
|
|
| S-007 |
pccp panel replacement surcharge
|
3,502   |
SQYD |
5.00 |
17,510.00 |
8.00 |
28,016.00 |
9.00 |
31,518.00 |
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | ITEM TOTAL (CONSTRUCTION BID) |
|
|
|
1,996,600.50 |
|
1,999,341.00 |
|
2,266,326.90 |
|
|
| | Number of Days Bid at $1,000 per day. |
|
|
115 |
115,000.00 |
115 |
115,000.00 |
115 |
115,000.00 |
0 |
|
| | TOTAL BID |
|
|
|
2,111,600.50 |
|
2,114,341.00 |
|
2,381,326.90 |
|
|
|