| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - GILCHRIST CONSTRUCTION CO. LLC |
- 2 - H & S CONSTRUCTION CO., INC. |
- 3 - AUSTIN BRIDGE & ROAD, LP |
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 201-01 |
clearing & grubbing
|
lump |
LUMP |
600,000.00 |
600,000.00 |
985,000.00 |
985,000.00 |
1,100,000.00 |
1,100,000.00 |
|
|
| 202-01 |
removal of structures & obstructions
|
lump |
LUMP |
50,000.00 |
50,000.00 |
150,000.00 |
150,000.00 |
23,000.00 |
23,000.00 |
|
|
| 202-02-B-01 |
removal of concrete box culverts (sta. 254+80; 4-9' x
9' x 85') |
1   |
EACH |
10,000.00 |
10,000.00 |
5,000.00 |
5,000.00 |
67,000.00 |
67,000.00 |
|
|
| 202-02-B-02 |
removal of concrete box culverts (sta. 284+21; 2-9' x
9' x 65') |
1   |
EACH |
10,000.00 |
10,000.00 |
4,000.00 |
4,000.00 |
26,000.00 |
26,000.00 |
|
|
| 202-02-D |
removal of concrete walks & drives
|
2,643   |
SQYD |
5.50 |
14,536.50 |
8.00 |
21,144.00 |
28.00 |
74,004.00 |
|
|
| 202-02-E |
removal of concrete curbs
|
1,295.2 |
LNFT |
7.50 |
9,714.00 |
8.00 |
10,361.60 |
23.00 |
29,789.60 |
|
|
| 202-02-G |
removal of surfacing & stabilized base
|
27,332.0 |
SQYD |
4.00 |
109,328.00 |
6.00 |
163,992.00 |
3.90 |
106,594.80 |
|
|
| 202-02-H |
removal of guard rail (lt. of sta. 555+12)
|
524   |
LNFT |
5.00 |
2,620.00 |
8.00 |
4,192.00 |
11.00 |
5,764.00 |
|
|
| 202-02-I |
removal of ornamental fence (lt. of sta. 393+26.54 to
sta. 403+38.13) |
1,121   |
LNFT |
15.00 |
16,815.00 |
10.00 |
11,210.00 |
56.00 |
62,776.00 |
|
|
| 202-02-J |
removal of above ground propane storage tank (lt. of
sta. 219+94) |
1   |
EACH |
1,000.00 |
1,000.00 |
100.00 |
100.00 |
1,000.00 |
1,000.00 |
|
|
| 202-02-01 |
removal of 40' x 35' railroad caboose with wooden
addition (lt. of sta. 220+00) |
1   |
EACH |
5,000.00 |
5,000.00 |
2,000.00 |
2,000.00 |
4,000.00 |
4,000.00 |
|
|
| 202-02-02 |
removal of 62' x 39' wood frame & metal shed on piers
(lt. of sta. 233+15) |
1   |
EACH |
5,000.00 |
5,000.00 |
500.00 |
500.00 |
7,000.00 |
7,000.00 |
|
|
| 202-02-03 |
removal of dilapidated school bus (lt. of sta. 235+05)
|
1   |
EACH |
500.00 |
500.00 |
500.00 |
500.00 |
280.00 |
280.00 |
|
|
| 202-02-04 |
removal of 14' x 75' mobile home (lt. of sta. 242+57)
|
1   |
EACH |
2,000.00 |
2,000.00 |
100.00 |
100.00 |
1,000.00 |
1,000.00 |
|
|
| 202-02-05 |
removal of 12' x 56' mobile home (lt. of sta. 243+58)
|
1   |
EACH |
2,000.00 |
2,000.00 |
100.00 |
100.00 |
1,000.00 |
1,000.00 |
|
|
| 202-02-06 |
removal of 18' x 20' metal shed (lt. of sta. 269+92)
|
1   |
EACH |
500.00 |
500.00 |
100.00 |
100.00 |
390.00 |
390.00 |
|
|
| 202-02-07 |
removal of 30' x 40' wood frame builing on piers (lt.
of sta. 270+00) |
1   |
EACH |
3,500.00 |
3,500.00 |
100.00 |
100.00 |
3,000.00 |
3,000.00 |
|
|
| 202-02-08 |
removal of 14' x 20' metal shed (lt. of sta. 270+12)
|
1   |
EACH |
400.00 |
400.00 |
100.00 |
100.00 |
340.00 |
340.00 |
|
|
| 202-02-09 |
removal of 14' x 20' metal shed (lt. of sta. 270+78)
|
1   |
EACH |
400.00 |
400.00 |
100.00 |
100.00 |
340.00 |
340.00 |
|
|
| 202-02-10 |
removal of 35' x 60' wood frame building on piers (lt.
of sta. 278+00) |
1   |
EACH |
6,000.00 |
6,000.00 |
1,000.00 |
1,000.00 |
6,000.00 |
6,000.00 |
|
|
| 202-02-11 |
removal of 30' x 70' brick residence on slab (lt. of
sta. 294+00) (contains non-friable asbestos) |
1   |
EACH |
6,000.00 |
6,000.00 |
6,500.00 |
6,500.00 |
33,000.00 |
33,000.00 |
|
|
| 202-02-12 |
removal of 44' x 16' wood frame residence on piers
(lt. of sta. 303+00) |
1   |
EACH |
2,500.00 |
2,500.00 |
1,500.00 |
1,500.00 |
2,000.00 |
2,000.00 |
|
|
| 202-02-13 |
removal of 22' x 18' metal shed (lt. of sta. 303+50)
|
1   |
EACH |
2,000.00 |
2,000.00 |
100.00 |
100.00 |
4,500.00 |
4,500.00 |
|
|
| 202-02-14 |
removal of 66' x 29' brick residence on slab (lt. of
sta. 304+00) |
1   |
EACH |
6,000.00 |
6,000.00 |
6,000.00 |
6,000.00 |
5,000.00 |
5,000.00 |
|
|
| 202-02-15 |
removal of 40' x 25' wood frame residence on slab (lt.
of sta. 305+50) (contains non-friable asbestos) |
1   |
EACH |
4,500.00 |
4,500.00 |
3,000.00 |
3,000.00 |
16,000.00 |
16,000.00 |
|
|
| 202-02-16 |
removal of 26' x 12' wood frame shed (lt. of sta.
306+00) |
1   |
EACH |
1,000.00 |
1,000.00 |
100.00 |
100.00 |
880.00 |
880.00 |
|
|
| 202-02-17 |
removal of 15' x 25' wood frame cabins on piers (lt.
of sta. 313+00) |
4   |
EACH |
2,000.00 |
8,000.00 |
10.00 |
40.00 |
110.00 |
440.00 |
|
|
| 202-02-18 |
removal of 135' x 30' metal gas station canopy (lt. of
sta. 325+50) |
1   |
EACH |
4,000.00 |
4,000.00 |
5,000.00 |
5,000.00 |
5,000.00 |
5,000.00 |
|
|
| 202-02-19 |
removal of sewer treatment plant (lt. of sta. 389+00)
|
1   |
EACH |
2,000.00 |
2,000.00 |
3,000.00 |
3,000.00 |
1,000.00 |
1,000.00 |
|
|
| 202-02-20 |
removal of sewer treatment plant (lt. of sta. 393+00)
|
1   |
EACH |
1,500.00 |
1,500.00 |
3,000.00 |
3,000.00 |
1,000.00 |
1,000.00 |
|
|
| 202-02-21 |
removal of 28' x 30' storage building (lt. of sta
458+00) |
1   |
EACH |
2,000.00 |
2,000.00 |
100.00 |
100.00 |
950.00 |
950.00 |
|
|
| 202-02-22 |
removal of 17' x 8' metal shed (lt. of sta. 458+00)
|
1   |
EACH |
1,000.00 |
1,000.00 |
100.00 |
100.00 |
160.00 |
160.00 |
|
|
| 202-02-23 |
removal of 90' x 50' wood frame residence on slab (lt.
of sta. 459+50) |
1   |
EACH |
10,000.00 |
10,000.00 |
7,500.00 |
7,500.00 |
13,000.00 |
13,000.00 |
|
|
| 202-02-24 |
removal of 45' x 78' brick residence on slab (lt. of
sta. 572+00) (contains non-friable asbestos) |
1   |
EACH |
8,500.00 |
8,500.00 |
4,500.00 |
4,500.00 |
56,000.00 |
56,000.00 |
|
|
| 202-02-25 |
removal of 90' x 38' tin building on slab (lt. of sta.
575+00) |
1   |
EACH |
7,000.00 |
7,000.00 |
6,500.00 |
6,500.00 |
8,000.00 |
8,000.00 |
|
|
| 202-02-26 |
removal of 22' x 33' wood frame residence on piers
(lt. of sta. 595+00) |
1   |
EACH |
4,000.00 |
4,000.00 |
500.00 |
500.00 |
2,000.00 |
2,000.00 |
|
|
| 202-02-27 |
removal of 18' x 58' wood frame residence on piers
(lt. of sta. 597+50) |
1   |
EACH |
4,500.00 |
4,500.00 |
500.00 |
500.00 |
3,000.00 |
3,000.00 |
|
|
| 202-02-28 |
removal of 60' x 60' wood frame residence on piers
(lt. of sta. 599+50) (contains non-friable asbestos) |
1   |
EACH |
9,000.00 |
9,000.00 |
500.00 |
500.00 |
57,000.00 |
57,000.00 |
|
|
| 202-02-29 |
removal of 30' x 50' wood frame residence on piers
(lt. of sta. 601+00) |
1   |
EACH |
5,000.00 |
5,000.00 |
500.00 |
500.00 |
4,000.00 |
4,000.00 |
|
|
| 202-03-01 |
relocation of assorted shrubbery (lt. of sta.
348+00 to sta. 363+50) |
120   |
EACH |
25.00 |
3,000.00 |
100.00 |
12,000.00 |
230.00 |
27,600.00 |
|
|
| 202-03-02 |
relocation of gate (lt. of sta. 542+08)
|
1   |
EACH |
2,000.00 |
2,000.00 |
4,000.00 |
4,000.00 |
2,500.00 |
2,500.00 |
|
|
| 203-01 |
general excavation
|
104,521   |
CUYD |
3.85 |
402,405.85 |
5.75 |
600,995.75 |
4.20 |
438,988.20 |
|
|
| 203-02 |
drainage excavation
|
11,587   |
CUYD |
7.75 |
89,799.25 |
14.00 |
162,218.00 |
7.00 |
81,109.00 |
|
|
| 203-03 |
muck excavation
|
21,000   |
CUYD |
7.00 |
147,000.00 |
9.00 |
189,000.00 |
8.00 |
168,000.00 |
|
|
| 203-04 |
embankment
|
231,197   |
CUYD |
9.00 |
2,080,773.00 |
11.00 |
2,543,167.00 |
14.00 |
3,236,758.00 |
|
|
| 203-09 |
geotexile fabric
|
3,652   |
SQYD |
1.60 |
5,843.20 |
2.00 |
7,304.00 |
2.70 |
9,860.40 |
|
|
| 204-02 |
temporary hay or straw bales
|
742   |
EACH |
20.00 |
14,840.00 |
7.50 |
5,565.00 |
9.00 |
6,678.00 |
|
|
| 204-05-A |
temporary sediment check dams (hay)
|
10   |
EACH |
200.00 |
2,000.00 |
125.00 |
1,250.00 |
110.00 |
1,100.00 |
|
|
| 204-05-B |
temporary sediment check dams (stone)
|
25   |
EACH |
700.00 |
17,500.00 |
1,000.00 |
25,000.00 |
110.00 |
2,750.00 |
|
|
| 204-06 |
temporary silt fencing
|
3,247   |
LNFT |
2.00 |
6,494.00 |
1.45 |
4,708.15 |
2.30 |
7,468.10 |
|
|
| 204-07 |
temporary stone construction entrance
|
8   |
EACH |
2,000.00 |
16,000.00 |
3,000.00 |
24,000.00 |
3,000.00 |
24,000.00 |
|
|
| 304-05 |
lime treatment (type e)
|
1,154.00 |
TON |
50.00 |
57,700.00 |
130.00 |
150,020.00 |
250.00 |
288,500.00 |
|
|
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
423   |
CUYD |
125.00 |
52,875.00 |
80.00 |
33,840.00 |
92.00 |
38,916.00 |
|
|
| 402-01 |
traffic maintenance aggregate (vehicular measurement)
|
450.0 |
CUYD |
75.00 |
33,750.00 |
100.00 |
45,000.00 |
92.00 |
41,400.00 |
|
|
| 701-01-F |
cross drain pipe (15" rcp/pcp)
|
2,363   |
LNFT |
82.00 |
193,766.00 |
80.00 |
189,040.00 |
59.00 |
139,417.00 |
|
|
| 701-01-I |
cross drain pipe (24" rcp/pcp)
|
164   |
LNFT |
100.00 |
16,400.00 |
90.00 |
14,760.00 |
79.00 |
12,956.00 |
|
|
| 701-01-K |
cross drain pipe (30" rcp/pcp)
|
253   |
LNFT |
125.00 |
31,625.00 |
100.00 |
25,300.00 |
96.00 |
24,288.00 |
|
|
| 701-01-M |
cross drain pipe (36" rcp/pcp)
|
156   |
LNFT |
130.00 |
20,280.00 |
150.00 |
23,400.00 |
120.00 |
18,720.00 |
|
|
| 701-01-N |
cross drain pipe (42" rcp/pcp)
|
288   |
LNFT |
150.00 |
43,200.00 |
175.00 |
50,400.00 |
170.00 |
48,960.00 |
|
|
| 701-02-G |
cross drain pipe arch (42" equiv. rcpa)
|
78   |
LNFT |
250.00 |
19,500.00 |
220.00 |
17,160.00 |
160.00 |
12,480.00 |
|
|
| 701-03-F |
storm drain pipe (15" rcp/pcp)
|
806   |
LNFT |
80.00 |
64,480.00 |
50.00 |
40,300.00 |
59.00 |
47,554.00 |
|
|
| 701-03-G |
storm drain pipe (18" rcp/pcp)
|
204   |
LNFT |
55.00 |
11,220.00 |
60.00 |
12,240.00 |
62.00 |
12,648.00 |
|
|
| 701-03-I |
storm drain pipe (24" rcp/pcp)
|
4,823   |
LNFT |
65.00 |
313,495.00 |
70.00 |
337,610.00 |
79.00 |
381,017.00 |
|
|
| 701-03-K |
storm drain pipe (30" rcp/pcp)
|
6,050   |
LNFT |
80.00 |
484,000.00 |
80.00 |
484,000.00 |
96.00 |
580,800.00 |
|
|
| 701-03-M |
storm drain pipe (36" rcp/pcp)
|
128   |
LNFT |
150.00 |
19,200.00 |
110.00 |
14,080.00 |
120.00 |
15,360.00 |
|
|
| 701-03-N |
storm drain pipe (42" rcp/pcp)
|
6,451   |
LNFT |
110.00 |
709,610.00 |
120.00 |
774,120.00 |
170.00 |
1,096,670.00 |
|
|
| 701-03-O |
storm drain pipe (48" rcp/pcp)
|
1,797   |
LNFT |
130.00 |
233,610.00 |
180.00 |
323,460.00 |
190.00 |
341,430.00 |
|
|
| 701-04-G |
storm drain pipe arch (42" equiv. rcpa)
|
2,373   |
LNFT |
140.00 |
332,220.00 |
140.00 |
332,220.00 |
160.00 |
379,680.00 |
|
|
| 701-05-F |
side drain pipe (15" rcp/pcp)
|
160   |
LNFT |
50.00 |
8,000.00 |
50.00 |
8,000.00 |
59.00 |
9,440.00 |
|
|
| 701-05-G |
side drain pipe (18" rcp/pcp)
|
1,171   |
LNFT |
72.00 |
84,312.00 |
60.00 |
70,260.00 |
62.00 |
72,602.00 |
|
|
| 701-05-I |
side drain pipe (24" rcp/pcp)
|
636   |
LNFT |
75.00 |
47,700.00 |
70.00 |
44,520.00 |
79.00 |
50,244.00 |
|
|
| 701-05-I-01 |
side drain pipe (24")(erosion)
|
130   |
LNFT |
62.00 |
8,060.00 |
70.00 |
9,100.00 |
79.00 |
10,270.00 |
|
|
| 701-05-K |
side drain pipe (30" rcp/pcp)
|
168   |
LNFT |
125.00 |
21,000.00 |
80.00 |
13,440.00 |
96.00 |
16,128.00 |
|
|
| 701-05-K-01 |
side drain pipe (30")(erosion)
|
44   |
LNFT |
82.00 |
3,608.00 |
80.00 |
3,520.00 |
96.00 |
4,224.00 |
|
|
| 701-05-M-01 |
side drain pipe (36")(erosion)
|
96   |
LNFT |
120.00 |
11,520.00 |
90.00 |
8,640.00 |
120.00 |
11,520.00 |
|
|
| 701-15 |
concrete collar
|
1   |
EACH |
1,200.00 |
1,200.00 |
1,200.00 |
1,200.00 |
1,000.00 |
1,000.00 |
|
|
| 702-02-B |
manholes (r-cb-11)
|
3   |
EACH |
3,200.00 |
9,600.00 |
3,000.00 |
9,000.00 |
14,000.00 |
42,000.00 |
|
|
| 702-02-C |
manholes (r-cb-11 mod)
|
2   |
EACH |
4,500.00 |
9,000.00 |
5,000.00 |
10,000.00 |
14,000.00 |
28,000.00 |
|
|
| 702-02-G |
manholes (special detail)
|
12   |
EACH |
9,000.00 |
108,000.00 |
8,000.00 |
96,000.00 |
14,000.00 |
168,000.00 |
|
|
| 702-03-A |
catch basins (cb-01)
|
53   |
EACH |
3,000.00 |
159,000.00 |
3,000.00 |
159,000.00 |
3,000.00 |
159,000.00 |
|
|
| 702-03-B |
catch basins (cb-02)
|
2   |
EACH |
3,600.00 |
7,200.00 |
4,000.00 |
8,000.00 |
7,000.00 |
14,000.00 |
|
|
| 702-03-C |
catch basins (cb-06)
|
2   |
EACH |
6,200.00 |
12,400.00 |
4,000.00 |
8,000.00 |
7,000.00 |
14,000.00 |
|
|
| 702-03-I |
catch basins (special detail)
|
32   |
EACH |
10,000.00 |
320,000.00 |
10,000.00 |
320,000.00 |
12,000.00 |
384,000.00 |
|
|
| 704-01-B |
guard rail (single thrie beam)(6'-3" post spacing)
|
146.0 |
LNFT |
35.00 |
5,110.00 |
31.50 |
4,599.00 |
35.00 |
5,110.00 |
|
|
| 704-03 |
blocked out guard rail
|
1,401.3 |
LNFT |
16.00 |
22,420.80 |
15.50 |
21,720.15 |
17.00 |
23,822.10 |
|
|
| 704-06 |
guard rail anchor sections (trailing end)
|
12.5 |
LNFT |
70.00 |
875.00 |
67.00 |
837.50 |
75.00 |
937.50 |
|
|
| 704-08-B |
guard rail transitions (double thrie beam)
|
150.0 |
LNFT |
55.00 |
8,250.00 |
49.00 |
7,350.00 |
55.00 |
8,250.00 |
|
|
| 704-11-A |
guard rail end treatment (flared)
|
4   |
EACH |
2,000.00 |
8,000.00 |
1,850.00 |
7,400.00 |
20,000.00 |
80,000.00 |
|
|
| 705-01 |
barbed wire fence
|
11,676   |
LNFT |
5.50 |
64,218.00 |
6.00 |
70,056.00 |
6.00 |
70,056.00 |
|
|
| 705-02 |
combination mesh & barbed wire fence
|
1,291   |
LNFT |
6.00 |
7,746.00 |
8.00 |
10,328.00 |
6.00 |
7,746.00 |
|
|
| 705-06-A |
chain link fence (4-foot height)
|
302   |
LNFT |
13.00 |
3,926.00 |
15.00 |
4,530.00 |
20.00 |
6,040.00 |
|
|
| 705-06-C |
chain link fence (6-foot height)
|
1,881   |
LNFT |
22.00 |
41,382.00 |
21.00 |
39,501.00 |
24.00 |
45,144.00 |
|
|
| 705-09 |
rebuilt fence
|
787   |
LNFT |
30.00 |
23,610.00 |
20.00 |
15,740.00 |
51.00 |
40,137.00 |
|
|
| 706-02-C |
concrete drive (6" thick)
|
2,732.8 |
SQYD |
55.00 |
150,304.00 |
45.00 |
122,976.00 |
43.00 |
117,510.40 |
|
|
| 706-03-C |
incidental concrete paving (6" thick)
|
50.3 |
SQYD |
180.00 |
9,054.00 |
45.00 |
2,263.50 |
96.00 |
4,828.80 |
|
|
| 708-01 |
right-of-way monument
|
116   |
EACH |
350.00 |
40,600.00 |
180.00 |
20,880.00 |
210.00 |
24,360.00 |
|
|
| 708-02 |
right-of-way monument witness post
|
116   |
EACH |
350.00 |
40,600.00 |
180.00 |
20,880.00 |
210.00 |
24,360.00 |
|
|
| 709-01 |
steel cattle guard
|
1   |
EACH |
13,000.00 |
13,000.00 |
14,000.00 |
14,000.00 |
9,000.00 |
9,000.00 |
|
|
| 711-01-D |
riprap (55 lb, 18" thick)
|
4,775   |
SQYD |
60.00 |
286,500.00 |
55.00 |
262,625.00 |
73.00 |
348,575.00 |
|
|
| 711-04 |
geotextile fabric
|
4,775   |
SQYD |
2.00 |
9,550.00 |
2.00 |
9,550.00 |
2.30 |
10,982.50 |
|
|
| 712-04 |
flexible revetment
|
1,150   |
SQYD |
55.00 |
63,250.00 |
50.00 |
57,500.00 |
45.00 |
51,750.00 |
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
200,000.00 |
200,000.00 |
185,000.00 |
185,000.00 |
250,000.00 |
250,000.00 |
|
|
| 713-05-A-01 |
temporary pavement markings (solid line)(4" width)
(type i removable) |
6.873 |
MILE |
16,000.00 |
109,968.00 |
15,000.00 |
103,095.00 |
10,000.00 |
68,730.00 |
|
|
| 713-09 |
temporary precast concrete barrier (department
furnished) |
52   |
EACH |
350.00 |
18,200.00 |
180.00 |
9,360.00 |
320.00 |
16,640.00 |
|
|
| 716-01-A |
mulch (vegetative)
|
133.00 |
ACRE |
650.00 |
86,450.00 |
650.00 |
86,450.00 |
680.00 |
90,440.00 |
|
|
| 717-01 |
seeding
|
3,990   |
LB |
6.50 |
25,935.00 |
7.50 |
29,925.00 |
9.00 |
35,910.00 |
|
|
| 718-01 |
fertilizer
|
133,000   |
LB |
0.40 |
53,200.00 |
0.25 |
33,250.00 |
0.35 |
46,550.00 |
|
|
| 720-01-B |
erosion control system, slope protection (type b)
|
3,659   |
SQYD |
1.10 |
4,024.90 |
1.10 |
4,024.90 |
2.80 |
10,245.20 |
|
|
| 720-01-C |
erosion control system, flexible channel liner (type c)
|
425   |
SQYD |
2.60 |
1,105.00 |
2.50 |
1,062.50 |
3.10 |
1,317.50 |
|
|
| 721-01 |
asphalt mulch
|
4,423   |
GAL |
1.60 |
7,076.80 |
2.50 |
11,057.50 |
2.30 |
10,172.90 |
|
|
| 722-02 |
project site laboratory (equipped)
|
1   |
EACH |
60,000.00 |
60,000.00 |
36,000.00 |
36,000.00 |
50,000.00 |
50,000.00 |
|
|
| 724-01-B |
pavement patching (12" minimum thickness)
|
1,039   |
SQYD |
80.00 |
83,120.00 |
100.00 |
103,900.00 |
95.00 |
98,705.00 |
|
|
| 725-02 |
temporary detour roads
|
1,204.4 |
SQYD |
90.00 |
108,396.00 |
100.00 |
120,440.00 |
80.00 |
96,352.00 |
|
|
| 726-01 |
bedding material
|
9,933.4 |
CUYD |
75.00 |
745,005.00 |
55.00 |
546,337.00 |
73.00 |
725,138.20 |
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
2,800,000.00 |
2,800,000.00 |
3,100,000.00 |
3,100,000.00 |
3,800,000.00 |
3,800,000.00 |
|
|
| 729-16-C |
object marker assembly (type 3)
|
53   |
EACH |
75.00 |
3,975.00 |
70.00 |
3,710.00 |
78.00 |
4,134.00 |
|
|
| 731-02 |
reflectorized raised pavement markers
|
3,744   |
EACH |
5.00 |
18,720.00 |
6.00 |
22,464.00 |
7.00 |
26,208.00 |
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
36.827 |
MILE |
2,300.00 |
84,702.10 |
2,200.00 |
81,019.40 |
3,000.00 |
110,481.00 |
|
|
| 732-02-C |
plastic pavement striping (solid line) (8" width)
|
0.312 |
MILE |
4,500.00 |
1,404.00 |
4,300.00 |
1,341.60 |
13,000.00 |
4,056.00 |
|
|
| 732-02-E |
plastic pavement striping (solid line) (24" width)
|
0.305 |
MILE |
13,000.00 |
3,965.00 |
12,800.00 |
3,904.00 |
24,000.00 |
7,320.00 |
|
|
| 732-04-A |
plastic pavement legends & symbols (arrow)
|
25   |
EACH |
160.00 |
4,000.00 |
145.00 |
3,625.00 |
340.00 |
8,500.00 |
|
|
| 732-04-C |
plastic pavement legends & symbols (only)
|
19   |
EACH |
160.00 |
3,040.00 |
165.00 |
3,135.00 |
340.00 |
6,460.00 |
|
|
| 732-05 |
removal of existing markings
|
8.604 |
MILE |
4,200.00 |
36,136.80 |
6,000.00 |
51,624.00 |
4,000.00 |
34,416.00 |
|
|
| 735-01 |
mailboxes
|
30   |
EACH |
50.00 |
1,500.00 |
6.00 |
180.00 |
17.00 |
510.00 |
|
|
| 735-02 |
mailbox supports (single)
|
21   |
EACH |
150.00 |
3,150.00 |
145.00 |
3,045.00 |
160.00 |
3,360.00 |
|
|
| 735-03 |
mailbox supports (double)
|
3   |
EACH |
210.00 |
630.00 |
250.00 |
750.00 |
230.00 |
690.00 |
|
|
| 735-04 |
mailbox supports (multiple)
|
1   |
EACH |
450.00 |
450.00 |
360.00 |
360.00 |
440.00 |
440.00 |
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
380,000.00 |
380,000.00 |
350,000.00 |
350,000.00 |
750,000.00 |
750,000.00 |
|
|
| 740-02 |
utility oversight and coordination
|
lump |
LUMP |
80,000.00 |
80,000.00 |
50,000.00 |
50,000.00 |
35,000.00 |
35,000.00 |
|
|
| 744-01 |
traffic control management
|
lump |
LUMP |
140,000.00 |
140,000.00 |
150,000.00 |
150,000.00 |
35,000.00 |
35,000.00 |
|
|
| 803-03 |
steel sheet pile wall
|
25,470   |
SQFT |
20.00 |
509,400.00 |
20.00 |
509,400.00 |
39.00 |
993,330.00 |
|
|
| 804-01-C |
precast concrete piles (16")
|
1,152   |
LNFT |
62.00 |
71,424.00 |
55.00 |
63,360.00 |
63.00 |
72,576.00 |
|
|
| 805-01 |
class a concrete
|
15.92 |
CUYD |
1,300.00 |
20,696.00 |
800.00 |
12,736.00 |
790.00 |
12,576.80 |
|
|
| 805-01-B |
class a concrete (box culvert headwalls)
|
146.43 |
CUYD |
1,100.00 |
161,073.00 |
1,000.00 |
146,430.00 |
2,000.00 |
292,860.00 |
|
|
| 805-01-F |
class a concrete (bents)
|
44.88 |
CUYD |
825.00 |
37,026.00 |
750.00 |
33,660.00 |
790.00 |
35,455.20 |
|
|
| 805-03 |
class aa concrete
|
179.30 |
CUYD |
550.00 |
98,615.00 |
650.00 |
116,545.00 |
680.00 |
121,924.00 |
|
|
| 805-12-A-01 |
reinforced concrete box culverts (4'x 3')(extension)
|
92.0 |
LNFT |
300.00 |
27,600.00 |
300.00 |
27,600.00 |
450.00 |
41,400.00 |
|
|
| 805-12-B-01 |
reinforced concrete box culverts (5'x 3')(extension)
|
24.0 |
LNFT |
700.00 |
16,800.00 |
650.00 |
15,600.00 |
560.00 |
13,440.00 |
|
|
| 805-12-C-01 |
reinforced concrete box culverts (6'x 3')(extension)
|
93.0 |
LNFT |
400.00 |
37,200.00 |
400.00 |
37,200.00 |
620.00 |
57,660.00 |
|
|
| 805-12-E-01 |
reinforced concrete box culverts (4'x 4')(extension)
|
500.0 |
LNFT |
450.00 |
225,000.00 |
400.00 |
200,000.00 |
510.00 |
255,000.00 |
|
|
| 805-12-I-01 |
reinforced concrete box culverts (5'x 5')(extension)
|
296.0 |
LNFT |
460.00 |
136,160.00 |
500.00 |
148,000.00 |
560.00 |
165,760.00 |
|
|
| 805-12-V |
reinforced concrete box culverts (9'x 9')
|
768.0 |
LNFT |
800.00 |
614,400.00 |
700.00 |
537,600.00 |
930.00 |
714,240.00 |
|
|
| 805-12-X |
reinforced concrete box culverts (10'x 10')
|
337.0 |
LNFT |
1,000.00 |
337,000.00 |
900.00 |
303,300.00 |
1,100.00 |
370,700.00 |
|
|
| 805-12-Y-01 |
reinforced concrete box culverts (2'x 2')(extension)
|
9.0 |
LNFT |
625.00 |
5,625.00 |
500.00 |
4,500.00 |
3,200.00 |
28,800.00 |
|
|
| 805-12-Z-01 |
reinforced concrete box culverts (2'x 3')(extension)
|
5.0 |
LNFT |
1,000.00 |
5,000.00 |
700.00 |
3,500.00 |
4,000.00 |
20,000.00 |
|
|
| 806-01 |
deformed reinforcing steel
|
56,226   |
LB |
0.85 |
47,792.10 |
1.50 |
84,339.00 |
3.20 |
179,923.20 |
|
|
| 807-06 |
structural metalwork
|
lump |
LUMP |
50,000.00 |
50,000.00 |
50,000.00 |
50,000.00 |
101,000.00 |
101,000.00 |
|
|
| 810-01 |
concrete railing (barrier)
|
200.00 |
LNFT |
48.00 |
9,600.00 |
80.00 |
16,000.00 |
68.00 |
13,600.00 |
|
|
| 813-01 |
concrete approach slabs
|
364.44 |
SQYD |
185.00 |
67,421.40 |
185.00 |
67,421.40 |
200.00 |
72,888.00 |
|
|
| S-001 |
rumble strips (ground-in)
|
17.2 |
MILE |
1,100.00 |
18,920.00 |
800.00 |
13,760.00 |
910.00 |
15,652.00 |
|
|
| S-002 |
dynamic message sign unit
|
2   |
EACH |
24,000.00 |
48,000.00 |
25,000.00 |
50,000.00 |
37,000.00 |
74,000.00 |
|
|
| S-003 |
sawcutting of asphaltic concrete pavement - full depth
|
7,100   |
LNFT |
2.00 |
14,200.00 |
6.00 |
42,600.00 |
3.70 |
26,270.00 |
|
|
| S-004 |
sawcutting of concrete pavement - full depth
|
270   |
LNFT |
7.00 |
1,890.00 |
12.00 |
3,240.00 |
3.70 |
999.00 |
|
|
| S-005 |
traffic maintenance superpave asphaltic concrete
|
115.0 |
TON |
82.00 |
9,430.00 |
100.00 |
11,500.00 |
150.00 |
17,250.00 |
|
|
| S-006 |
plugging existing water wells
|
1   |
EACH |
1,100.00 |
1,100.00 |
500.00 |
500.00 |
6,000.00 |
6,000.00 |
|
|
| S-007 |
lightweight aggregate backfill
|
4,512.0 |
TON |
100.00 |
451,200.00 |
82.00 |
369,984.00 |
40.00 |
180,480.00 |
|
|
| S-008 |
precast concrete sheet pile wall cap
|
919   |
LNFT |
150.00 |
137,850.00 |
150.00 |
137,850.00 |
290.00 |
266,510.00 |
|
|
| S-101 |
retroreflective sheeting panels
|
lump |
LUMP |
1,600.00 |
1,600.00 |
4,000.00 |
4,000.00 |
960.00 |
960.00 |
|
|
| | SUBTOTAL GENERAL |
|
|
|
16,197,571.70 |
|
17,421,798.95 |
|
21,560,883.40 |
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| ALTERNATE A |
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| ALTERNATE A1 |
superpave asphaltic concrete pavement
|
|
|
|
|
|
|
|
|
|
|
| 203-05-A |
nonplastic embankment (stone)
|
4,778   |
CUYD |
0.00 |
0.00 |
0.00 |
0.00 |
58.00 |
277,124.00 |
|
|
| 302-02-C-01 |
class ii base course (10" thick)(stone or recycled
pccp) |
162,875.2 |
SQYD |
0.00 |
0.00 |
0.00 |
0.00 |
19.00 |
3,094,628.80 |
|
|
| 302-02-E-01 |
class ii base course (7" thick)(stone or recycled pccp)
|
15,614.1 |
SQYD |
0.00 |
0.00 |
0.00 |
0.00 |
18.00 |
281,053.80 |
|
|
| 302-02-F-01 |
class ii base course (17" thick)(stone or recycled
pccp) |
46,162.2 |
SQYD |
0.00 |
0.00 |
0.00 |
0.00 |
24.00 |
1,107,892.80 |
|
|
| 305-01-D |
subgrade layer (12" thick)(6% cement treated)
|
224,282   |
SQYD |
0.00 |
0.00 |
0.00 |
0.00 |
6.00 |
1,345,692.00 |
|
|
| 502-01 |
superpave asphaltic concrete
|
71,624.9 |
TON |
0.00 |
0.00 |
0.00 |
0.00 |
130.00 |
9,311,237.00 |
|
|
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
14,987.8 |
TON |
0.00 |
0.00 |
0.00 |
0.00 |
160.00 |
2,398,048.00 |
|
|
| 707-01 |
concrete curb
|
452.6 |
LNFT |
0.00 |
0.00 |
0.00 |
0.00 |
14.00 |
6,336.40 |
|
|
| 707-03 |
combination concrete curb and gutter
|
384.3 |
LNFT |
0.00 |
0.00 |
0.00 |
0.00 |
28.00 |
10,760.40 |
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
17.207 |
MILE |
0.00 |
0.00 |
0.00 |
0.00 |
10,000.00 |
172,070.00 |
|
|
| | SUBTOTAL ALT A1 |
|
|
|
|
|
|
|
18,004,843.20 |
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| ALTERNATE A2 |
portland cement concrete pavement
|
|
|
|
|
|
|
|
|
|
|
| 203-05-A |
nonplastic embankment (stone)
|
4,775   |
CUYD |
100.00 |
477,500.00 |
80.00 |
382,000.00 |
0.00 |
0.00 |
|
|
| 302-02-C-01 |
class ii base course (10" thick)(stone or recycled
pccp) |
163,320.2 |
SQYD |
14.00 |
2,286,482.80 |
22.50 |
3,674,704.50 |
0.00 |
0.00 |
|
|
| 302-02-E-01 |
class ii base course (7" thick)(stone or recycled pccp)
|
15,565.4 |
SQYD |
12.00 |
186,784.80 |
16.50 |
256,829.10 |
0.00 |
0.00 |
|
|
| 302-02-F-01 |
class ii base course (17" thick)(stone or recycled
pccp) |
45,837.6 |
SQYD |
28.00 |
1,283,452.80 |
33.50 |
1,535,559.60 |
0.00 |
0.00 |
|
|
| 305-01-D |
subgrade layer (12" thick)(6% cement treated)
|
224,354   |
SQYD |
7.00 |
1,570,478.00 |
7.00 |
1,570,478.00 |
0.00 |
0.00 |
|
|
| 502-01 |
superpave asphaltic concrete
|
4,425.9 |
TON |
88.00 |
389,479.20 |
90.00 |
398,331.00 |
0.00 |
0.00 |
|
|
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
2,053.5 |
TON |
120.00 |
246,420.00 |
105.00 |
215,617.50 |
0.00 |
0.00 |
|
|
| 601-01-I |
portland cement concrete pavement (9" thick)
|
135,754.6 |
SQYD |
42.00 |
5,701,693.20 |
44.00 |
5,973,202.40 |
0.00 |
0.00 |
|
|
| 601-02-I |
portland cement concrete pavement (9" thick)
(crossovers & turnouts) |
26,796.8 |
SQYD |
65.00 |
1,741,792.00 |
59.00 |
1,581,011.20 |
0.00 |
0.00 |
|
|
| 601-04 |
portland cement concrete pavement coring
|
205   |
EACH |
90.00 |
18,450.00 |
100.00 |
20,500.00 |
0.00 |
0.00 |
|
|
| 707-01 |
concrete curb
|
836.9 |
LNFT |
14.00 |
11,716.60 |
11.00 |
9,205.90 |
0.00 |
0.00 |
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
8.604 |
MILE |
800.00 |
6,883.20 |
630.00 |
5,420.52 |
0.00 |
0.00 |
|
|
| 732-03-A-01 |
plastic pvmt striping (broken line)(4"width)preformed
marking tape (type v) |
8.604 |
MILE |
5,500.00 |
47,322.00 |
4,000.00 |
34,416.00 |
0.00 |
0.00 |
|
|
| | SUBTOTAL ALT A2 |
|
|
|
13,968,454.60 |
|
15,657,275.72 |
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | ITEM TOTAL (CONSTRUCTION BID) |
|
|
|
30,166,026.30 |
|
33,079,074.67 |
|
39,565,726.60 |
|
|
| | Number of Days Bid at $1,000 per day. |
|
|
825 |
825,000.00 |
950 |
950,000.00 |
950 |
950,000.00 |
|
|
| | Life Cycle Cost |
|
|
|
1,359,000.00 |
|
1,359,000.00 |
|
2,614,800.00 |
|
|
| | TOTAL BID |
|
|
|
32,350,026.30 |
|
35,388,074.67 |
|
43,130,526.60 |
|
|
|