| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - F. J. BURNELL, INC. |
- 2 - BEST-YET BUILDERS, LLC |
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-01 |
removal of structures & obstructions
|
lump |
LUMP |
120,000.00 |
120,000.00 |
100,000.00 |
100,000.00 |
|
|
|
|
| 202-02-C |
removal of portland cement concrete pavement
|
1,638   |
SQYD |
7.00 |
11,466.00 |
15.00 |
24,570.00 |
|
|
|
|
| 202-02-D |
removal of concrete walks & drives
|
261   |
SQYD |
10.00 |
2,610.00 |
16.25 |
4,241.25 |
|
|
|
|
| 202-02-E |
removal of concrete curbs
|
769.1 |
LNFT |
3.00 |
2,307.30 |
15.00 |
11,536.50 |
|
|
|
|
| 202-02-G |
removal of surfacing & stabilized base
|
6,138.3 |
SQYD |
5.00 |
30,691.50 |
5.00 |
30,691.50 |
|
|
|
|
| 202-02-I |
removal of incidental concrete pavement
|
83.9 |
SQYD |
10.00 |
839.00 |
15.00 |
1,258.50 |
|
|
|
|
| 202-02-J |
removal of concrete headwall
|
2   |
EACH |
400.00 |
800.00 |
5,000.00 |
10,000.00 |
|
|
|
|
| 202-02-K |
removal of reinforced concrete pipe
|
102.0 |
LNFT |
11.00 |
1,122.00 |
50.00 |
5,100.00 |
|
|
|
|
| 202-02-L |
removal of fence
|
800   |
LNFT |
2.00 |
1,600.00 |
10.00 |
8,000.00 |
|
|
|
|
| 202-02-M |
removal of traffic signal equipment
|
lump |
LUMP |
10,000.00 |
10,000.00 |
4,000.00 |
4,000.00 |
|
|
|
|
| 203-01 |
general excavation
|
4,533   |
CUYD |
8.00 |
36,264.00 |
6.00 |
27,198.00 |
|
|
|
|
| 203-04 |
embankment
|
1,688   |
CUYD |
15.00 |
25,320.00 |
5.00 |
8,440.00 |
|
|
|
|
| 204-05-A |
temporary sediment check dams (hay)
|
80   |
EACH |
70.00 |
5,600.00 |
150.00 |
12,000.00 |
|
|
|
|
| 204-06 |
temporary silt fencing
|
1,000   |
LNFT |
2.00 |
2,000.00 |
3.50 |
3,500.00 |
|
|
|
|
| 304-05 |
lime treatment (type e)
|
266.50 |
TON |
265.00 |
70,622.50 |
425.00 |
113,262.50 |
|
|
|
|
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
9   |
CUYD |
100.00 |
900.00 |
60.00 |
540.00 |
|
|
|
|
| 502-01 |
superpave asphaltic concrete
|
3,796.5 |
TON |
105.00 |
398,632.50 |
80.00 |
303,720.00 |
|
|
|
|
| 601-01-K |
portland cement concrete pavement (10" thick)
|
9,242.7 |
SQYD |
52.00 |
480,620.40 |
65.00 |
600,775.50 |
|
|
|
|
| 601-03-K |
portland cement concrete shoulder (10" thick)
|
2,262.2 |
SQYD |
55.00 |
124,421.00 |
75.00 |
169,665.00 |
|
|
|
|
| 601-04 |
portland cement concrete pavement coring
|
15   |
EACH |
150.00 |
2,250.00 |
250.00 |
3,750.00 |
|
|
|
|
| 701-01-I/K |
cross drain pipe (24" rcp/pcp or 30" cmp)
|
105   |
LNFT |
75.00 |
7,875.00 |
65.00 |
6,825.00 |
|
|
|
|
| 701-05-I |
side drain pipe (24")
|
24   |
LNFT |
75.00 |
1,800.00 |
65.00 |
1,560.00 |
|
|
|
|
| 701-10-I |
reinforced concrete pipe (extension)(24")
|
12   |
LNFT |
125.00 |
1,500.00 |
150.00 |
1,800.00 |
|
|
|
|
| 704-03 |
blocked out guard rail
|
187.5 |
LNFT |
28.00 |
5,250.00 |
20.00 |
3,750.00 |
|
|
|
|
| 704-08-B |
guard rail transitions (double thrie beam)
|
50.0 |
LNFT |
75.00 |
3,750.00 |
55.00 |
2,750.00 |
|
|
|
|
| 704-11-A |
guard rail end treatment (flared)
|
2   |
EACH |
2,300.00 |
4,600.00 |
2,300.00 |
4,600.00 |
|
|
|
|
| 705-06-B |
chain link fence (5-foot height)
|
946   |
LNFT |
13.50 |
12,771.00 |
26.00 |
24,596.00 |
|
|
|
|
| 706-02-C |
concrete drive (6" thick)
|
173.9 |
SQYD |
42.00 |
7,303.80 |
50.00 |
8,695.00 |
|
|
|
|
| 706-03-A |
incidental concrete paving (4" thick)
|
13.5 |
SQYD |
100.00 |
1,350.00 |
45.00 |
607.50 |
|
|
|
|
| 707-01 |
concrete curb
|
185.6 |
LNFT |
10.00 |
1,856.00 |
12.00 |
2,227.20 |
|
|
|
|
| 707-03 |
combination concrete curb & gutter
|
71.0 |
LNFT |
30.00 |
2,130.00 |
30.00 |
2,130.00 |
|
|
|
|
| 708-01 |
right-of-way monument
|
4   |
EACH |
250.00 |
1,000.00 |
225.00 |
900.00 |
|
|
|
|
| 708-02 |
right-of-way monument witness post
|
4   |
EACH |
250.00 |
1,000.00 |
100.00 |
400.00 |
|
|
|
|
| 712-01-A |
concrete cast-in-place revetment (4" thick)
|
248   |
SQYD |
50.00 |
12,400.00 |
48.00 |
11,904.00 |
|
|
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
80,000.00 |
80,000.00 |
100,000.00 |
100,000.00 |
|
|
|
|
| 713-09 |
temporary precast concrete barrier (department
furnished) |
1,750   |
EACH |
1.00 |
1,750.00 |
250.00 |
437,500.00 |
|
|
|
|
| 722-02 |
project site laboratory (equipped)
|
1   |
EACH |
1,000.00 |
1,000.00 |
15,000.00 |
15,000.00 |
|
|
|
|
| 725-02 |
temporary detour roads
|
2,403.7 |
SQYD |
70.00 |
168,259.00 |
100.00 |
240,370.00 |
|
|
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
300,000.00 |
300,000.00 |
350,000.00 |
350,000.00 |
|
|
|
|
| 729-01 |
sign (type a)
|
37.5 |
SQFT |
40.00 |
1,500.00 |
22.00 |
825.00 |
|
|
|
|
| 729-01-A |
sign (type a)(mast arm mounted)
|
30.0 |
SQFT |
40.00 |
1,200.00 |
19.00 |
570.00 |
|
|
|
|
| 729-02 |
sign (type b)
|
94.7 |
SQFT |
35.00 |
3,314.50 |
17.50 |
1,657.25 |
|
|
|
|
| 729-16-C |
object marker assembly (type 3)
|
2   |
EACH |
110.00 |
220.00 |
82.00 |
164.00 |
|
|
|
|
| 729-21 |
u-channel post
|
14   |
EACH |
50.00 |
700.00 |
95.00 |
1,330.00 |
|
|
|
|
| 730-01 |
trenching and backfilling
|
3,700   |
LNFT |
2.25 |
8,325.00 |
2.00 |
7,400.00 |
|
|
|
|
| 730-02-A |
conduit with conductors (3#4 xhhw-2 conductors in
1-1/2" rigid galvanized steel conduit (above ground)) |
40   |
LNFT |
23.00 |
920.00 |
20.00 |
800.00 |
|
|
|
|
| 730-02-B |
conduit with conductors (3#4 xhhw-2 conductors in
1-1/2" schedule 40 pvc conduit (underground)) |
300   |
LNFT |
12.00 |
3,600.00 |
10.00 |
3,000.00 |
|
|
|
|
| 730-02-C |
conduit with conductors (4#6 xhhw-2 conductors,
1#8 bare solid ground in 1- 1/2" schedule 40 pvc conduit (underground)) |
300   |
LNFT |
12.00 |
3,600.00 |
10.00 |
3,000.00 |
|
|
|
|
| 730-02-D |
conduit with conductors (2#6 xhhw-2 conductors,
1#8 bare solid ground in 1- 1/2" schedule 40 pvc conduit (undergound)) |
3,060   |
LNFT |
7.30 |
22,338.00 |
6.50 |
19,890.00 |
|
|
|
|
| 730-02-E |
conduit with conductors (2#6 xhhw-2 conductors,
1#8 bare solid ground in 1- 1/2" galv. rigid steel conduit (undergrnd)) |
40   |
LNFT |
12.00 |
480.00 |
10.00 |
400.00 |
|
|
|
|
| 730-02-F |
conduit with conductors (2#6 xhhw-2 conductors,
1#8 green ground in 1-1/2" rigid aluminum conduit (structure mount)) |
170   |
LNFT |
30.00 |
5,100.00 |
26.00 |
4,420.00 |
|
|
|
|
| 730-02-G |
conduit with conductors (2#6 xhhw-2 conductors,
1#8 green ground in 1-1/2" liq.tight flex. metal conduit (str. mount)) |
30   |
LNFT |
34.00 |
1,020.00 |
30.00 |
900.00 |
|
|
|
|
| 730-04-A |
jacking or bored casing (6" diameter schedule 80 pvc
conduit) |
400   |
LNFT |
73.00 |
29,200.00 |
65.00 |
26,000.00 |
|
|
|
|
| 730-05-A |
light pole (barrier structure mount, steel, 40'
mounting height, 6' truss a rm, concrete blister) |
1   |
EACH |
3,400.00 |
3,400.00 |
3,000.00 |
3,000.00 |
|
|
|
|
| 730-05-B |
light pole (40' mounting height, steel, breakaway
trans. base, junct. box, concrete drill shaft, concrete mowing apron) |
2   |
EACH |
7,000.00 |
14,000.00 |
6,300.00 |
12,600.00 |
|
|
|
|
| 730-07-A |
luminaire
|
17   |
EACH |
500.00 |
8,500.00 |
450.00 |
7,650.00 |
|
|
|
|
| 730-08-A |
electrical service point (existing pole)
|
3   |
EACH |
3,400.00 |
10,200.00 |
3,000.00 |
9,000.00 |
|
|
|
|
| 730-09 |
electrical system
|
lump |
LUMP |
11,000.00 |
11,000.00 |
9,800.00 |
9,800.00 |
|
|
|
|
| 730-14-A |
removal and disposal of luminaires (250 watt high
pressure sodium) |
15   |
EACH |
110.00 |
1,650.00 |
100.00 |
1,500.00 |
|
|
|
|
| 730-15-A |
relocate light poles (40' steel, ground mount, 6'
truss arm) |
9   |
EACH |
2,000.00 |
18,000.00 |
1,800.00 |
16,200.00 |
|
|
|
|
| 730-16-A |
underground junction box (13" x 24")
|
6   |
EACH |
450.00 |
2,700.00 |
400.00 |
2,400.00 |
|
|
|
|
| 730-17-A |
structure junction box (8" x 8" x 4")
|
4   |
EACH |
450.00 |
1,800.00 |
400.00 |
1,600.00 |
|
|
|
|
| 731-02 |
reflectorized raised pavement markers
|
800   |
EACH |
6.00 |
4,800.00 |
5.90 |
4,720.00 |
|
|
|
|
| 732-01-C-04 |
plastic pavement striping (dotted line)(8" width)
|
1,517   |
LNFT |
1.40 |
2,123.80 |
1.65 |
2,503.05 |
|
|
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
2.344 |
MILE |
2,600.00 |
6,094.40 |
2,565.00 |
6,012.36 |
|
|
|
|
| 732-02-C |
plastic pavement striping (solid line) (8" width)
|
0.417 |
MILE |
5,300.00 |
2,210.10 |
4,950.00 |
2,064.15 |
|
|
|
|
| 732-02-E |
plastic pavement striping (solid line) (24" width)
|
0.161 |
MILE |
16,000.00 |
2,576.00 |
15,000.00 |
2,415.00 |
|
|
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
0.202 |
MILE |
820.00 |
165.64 |
750.00 |
151.50 |
|
|
|
|
| 732-04-A |
plastic pavement legends & symbols (arrow)
|
10   |
EACH |
160.00 |
1,600.00 |
165.00 |
1,650.00 |
|
|
|
|
| 732-04-B |
plastic pavement legends & symbols (double arrow)
|
1   |
EACH |
220.00 |
220.00 |
215.00 |
215.00 |
|
|
|
|
| 732-04-C |
plastic pavement legends & symbols (only)
|
10   |
EACH |
175.00 |
1,750.00 |
175.00 |
1,750.00 |
|
|
|
|
| 736-01 |
trenching and backfilling
|
2,885   |
LNFT |
2.25 |
6,491.25 |
2.00 |
5,770.00 |
|
|
|
|
| 736-03-B |
jacked or bored conduit (3" p.e.c., sch.80)
|
1,005   |
LNFT |
23.50 |
23,617.50 |
21.00 |
21,105.00 |
|
|
|
|
| 736-04-B |
signal support (mast arm 25')
|
4   |
EACH |
10,000.00 |
40,000.00 |
8,620.00 |
34,480.00 |
|
|
|
|
| 736-04-C |
signal support (mast arm 30')
|
1   |
EACH |
10,000.00 |
10,000.00 |
8,740.00 |
8,740.00 |
|
|
|
|
| 736-04-D |
signal support (mast arm 50')
|
1   |
EACH |
14,000.00 |
14,000.00 |
12,700.00 |
12,700.00 |
|
|
|
|
| 736-04-E |
signal support (duel mast arm 30'/50')
|
1   |
EACH |
19,000.00 |
19,000.00 |
16,680.00 |
16,680.00 |
|
|
|
|
| 736-05-B |
signal heads (12" l.e.d., 3 section, r, y, g)
|
18   |
EACH |
1,500.00 |
27,000.00 |
1,350.00 |
24,300.00 |
|
|
|
|
| 736-05-C |
signal heads (12" l.e.d., 5 section, r, y, lt.y, lt.g,
g) |
3   |
EACH |
2,200.00 |
6,600.00 |
2,000.00 |
6,000.00 |
|
|
|
|
| 736-06-A |
signal service (pedestal type)
|
2   |
EACH |
2,000.00 |
4,000.00 |
1,800.00 |
3,600.00 |
|
|
|
|
| 736-08-A |
signal controller (nema, ts-2, type 2, type 6 ground
mounted cabinet) |
3   |
EACH |
20,000.00 |
60,000.00 |
18,000.00 |
54,000.00 |
|
|
|
|
| 736-10-A |
underground junction box (type f)
|
4   |
EACH |
600.00 |
2,400.00 |
525.00 |
2,100.00 |
|
|
|
|
| 736-10-B |
underground junction box (type g)
|
9   |
EACH |
1,000.00 |
9,000.00 |
857.00 |
7,713.00 |
|
|
|
|
| 736-10-C |
underground junction box (type h)
|
3   |
EACH |
1,200.00 |
3,600.00 |
1,058.00 |
3,174.00 |
|
|
|
|
| 736-10-D |
underground junction box (type e)
|
6   |
EACH |
500.00 |
3,000.00 |
460.00 |
2,760.00 |
|
|
|
|
| 736-11-A |
conduit (2" p.e.c., sch.80)
|
2,770   |
LNFT |
5.60 |
15,512.00 |
5.00 |
13,850.00 |
|
|
|
|
| 736-11-B |
conduit (3" p.e.c., sch.80)
|
115   |
LNFT |
12.00 |
1,380.00 |
10.00 |
1,150.00 |
|
|
|
|
| 736-12-A |
conductor (power, 3c, 6 gauge, #6 awg., concentric)
|
1,530   |
LNFT |
3.65 |
5,584.50 |
3.25 |
4,972.50 |
|
|
|
|
| 736-12-B |
conductor (signal, 10c, #14 awg., stranded)
|
1,035   |
LNFT |
2.80 |
2,898.00 |
2.50 |
2,587.50 |
|
|
|
|
| 736-12-C |
conductor (interconnect, 6 pair, twisted pair,
#19 awg., solid, imsa 20-2) |
1,200   |
LNFT |
6.75 |
8,100.00 |
6.00 |
7,200.00 |
|
|
|
|
| 739-01 |
hydro-seeding
|
5.00 |
ACRE |
2,000.00 |
10,000.00 |
1,600.00 |
8,000.00 |
|
|
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
70,000.00 |
70,000.00 |
50,000.00 |
50,000.00 |
|
|
|
|
| 744-01 |
traffic control management
|
lump |
LUMP |
54,000.00 |
54,000.00 |
100,000.00 |
100,000.00 |
|
|
|
|
| 804-01-E |
precast concrete piles (20")
|
800   |
LNFT |
172.00 |
137,600.00 |
90.00 |
72,000.00 |
|
|
|
|
| 804-12 |
loading permanent piles
|
1   |
EACH |
1,000.00 |
1,000.00 |
1.00 |
1.00 |
|
|
|
|
| 805-01-F |
class a concrete (bents)
|
34.69 |
CUYD |
1,500.00 |
52,035.00 |
1,000.00 |
34,690.00 |
|
|
|
|
| 806-01 |
deformed reinforcing steel
|
5,887   |
LB |
2.00 |
11,774.00 |
1.10 |
6,475.70 |
|
|
|
|
| 810-01 |
concrete railing (barrier)
|
342.25 |
LNFT |
65.00 |
22,246.25 |
80.00 |
27,380.00 |
|
|
|
|
| 813-01 |
concrete approach slabs
|
98.60 |
SQYD |
250.00 |
24,650.00 |
195.00 |
19,227.00 |
|
|
|
|
| S-001 |
modular breakaway cable system (low mast)
|
11   |
EACH |
2,500.00 |
27,500.00 |
2,200.00 |
24,200.00 |
|
|
|
|
| S-002 |
concrete marker (underground duct)
|
6   |
EACH |
225.00 |
1,350.00 |
200.00 |
1,200.00 |
|
|
|
|
| S-003 |
marker tape (underground)
|
4,100   |
LNFT |
1.10 |
4,510.00 |
1.00 |
4,100.00 |
|
|
|
|
| S-004 |
video detection device and connection
|
8   |
EACH |
7,500.00 |
60,000.00 |
6,600.00 |
52,800.00 |
|
|
|
|
| S-005 |
video detection system
|
3   |
EACH |
4,400.00 |
13,200.00 |
3,900.00 |
11,700.00 |
|
|
|
|
| S-006 |
convert catch basin to manhole
|
1   |
each |
2,000.00 |
2,000.00 |
3,500.00 |
3,500.00 |
|
|
|
|
| S-007 |
impact attenuators (construction zone)
|
2   |
each |
20,000.00 |
40,000.00 |
26,500.00 |
53,000.00 |
|
|
|
|
| S-008 |
sawcuting pcc pavement
|
440   |
LNFT |
15.00 |
6,600.00 |
10.00 |
4,400.00 |
|
|
|
|
| S-101 |
slab saw cut
|
lump |
LUMP |
15,000.00 |
15,000.00 |
8,000.00 |
8,000.00 |
|
|
|
|
| S-102 |
slab span widening
|
5   |
SPAN |
72,000.00 |
360,000.00 |
27,500.00 |
137,500.00 |
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | ITEM TOTAL (CONSTRUCTION BID) |
|
|
|
3,293,616.94 |
|
3,664,506.46 |
|
|
|
|
| | Number of Days Bid at $2,000 per day. |
|
|
300 |
600,000.00 |
300 |
600,000.00 |
0 |
|
0 |
|
| | TOTAL BID |
|
|
|
3,893,616.94 |
|
4,264,506.46 |
|
|
|
|
|