Letting of 9/27/2006 LA DOTD Headquarters


READV
go back
Go Back
 
Lead Project: 451-02-0081
Parish: BOSSIER
Routes: I-20
Description: INDUSTRIAL DRIVE RAMP AND FRONTAGE ROAD IMPROVEMENTS
Type Const: grading, drainage structures, superpave asphaltic conc base course, pccp, bridge
widening, traffic signalization and related work.
Estimated Construction Cost: $4,312,927.65
Maximum Number of Days Allowed for Construction: 365
Calculated Daily User Cost: $2,000.00
 
RankLicenseBidderConstruction Bid Bidder's Proposed
Contract Time
Total Bid
1 28218 F. J. BURNELL, INC. $3,293,616.94 300 $3,893,616.94
2 36374 BEST-YET BUILDERS, LLC $3,664,506.46 300 $4,264,506.46
 
Item Number Item Description Quantity Unit of Measure - 1 -
F. J. BURNELL, INC.
- 2 -
BEST-YET BUILDERS, LLC

 

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
202-01 removal of structures & obstructions lump      LUMP 120,000.00 120,000.00 100,000.00 100,000.00        
202-02-C removal of portland cement concrete pavement 1,638      SQYD 7.00 11,466.00 15.00 24,570.00        
202-02-D removal of concrete walks & drives 261      SQYD 10.00 2,610.00 16.25 4,241.25        
202-02-E removal of concrete curbs 769.1    LNFT 3.00 2,307.30 15.00 11,536.50        
202-02-G removal of surfacing & stabilized base 6,138.3    SQYD 5.00 30,691.50 5.00 30,691.50        
202-02-I removal of incidental concrete pavement 83.9    SQYD 10.00 839.00 15.00 1,258.50        
202-02-J removal of concrete headwall 2      EACH 400.00 800.00 5,000.00 10,000.00        
202-02-K removal of reinforced concrete pipe 102.0    LNFT 11.00 1,122.00 50.00 5,100.00        
202-02-L removal of fence 800      LNFT 2.00 1,600.00 10.00 8,000.00        
202-02-M removal of traffic signal equipment lump      LUMP 10,000.00 10,000.00 4,000.00 4,000.00        
203-01 general excavation 4,533      CUYD 8.00 36,264.00 6.00 27,198.00        
203-04 embankment 1,688      CUYD 15.00 25,320.00 5.00 8,440.00        
204-05-A temporary sediment check dams (hay) 80      EACH 70.00 5,600.00 150.00 12,000.00        
204-06 temporary silt fencing 1,000      LNFT 2.00 2,000.00 3.50 3,500.00        
304-05 lime treatment (type e) 266.50   TON 265.00 70,622.50 425.00 113,262.50        
401-02 aggregate surface course (adjusted vehicular
measurement)
9      CUYD 100.00 900.00 60.00 540.00        
502-01 superpave asphaltic concrete 3,796.5    TON 105.00 398,632.50 80.00 303,720.00        
601-01-K portland cement concrete pavement (10" thick) 9,242.7    SQYD 52.00 480,620.40 65.00 600,775.50        
601-03-K portland cement concrete shoulder (10" thick) 2,262.2    SQYD 55.00 124,421.00 75.00 169,665.00        
601-04 portland cement concrete pavement coring 15      EACH 150.00 2,250.00 250.00 3,750.00        
701-01-I/K cross drain pipe (24" rcp/pcp or 30" cmp) 105      LNFT 75.00 7,875.00 65.00 6,825.00        
701-05-I side drain pipe (24") 24      LNFT 75.00 1,800.00 65.00 1,560.00        
701-10-I reinforced concrete pipe (extension)(24") 12      LNFT 125.00 1,500.00 150.00 1,800.00        
704-03 blocked out guard rail 187.5    LNFT 28.00 5,250.00 20.00 3,750.00        
704-08-B guard rail transitions (double thrie beam) 50.0    LNFT 75.00 3,750.00 55.00 2,750.00        
704-11-A guard rail end treatment (flared) 2      EACH 2,300.00 4,600.00 2,300.00 4,600.00        
705-06-B chain link fence (5-foot height) 946      LNFT 13.50 12,771.00 26.00 24,596.00        
706-02-C concrete drive (6" thick) 173.9    SQYD 42.00 7,303.80 50.00 8,695.00        
706-03-A incidental concrete paving (4" thick) 13.5    SQYD 100.00 1,350.00 45.00 607.50        
707-01 concrete curb 185.6    LNFT 10.00 1,856.00 12.00 2,227.20        
707-03 combination concrete curb & gutter 71.0    LNFT 30.00 2,130.00 30.00 2,130.00        
708-01 right-of-way monument 4      EACH 250.00 1,000.00 225.00 900.00        
708-02 right-of-way monument witness post 4      EACH 250.00 1,000.00 100.00 400.00        
712-01-A concrete cast-in-place revetment (4" thick) 248      SQYD 50.00 12,400.00 48.00 11,904.00        
713-01 temporary signs & barricades lump      LUMP 80,000.00 80,000.00 100,000.00 100,000.00        
713-09 temporary precast concrete barrier (department
furnished)
1,750      EACH 1.00 1,750.00 250.00 437,500.00        
722-02 project site laboratory (equipped) 1      EACH 1,000.00 1,000.00 15,000.00 15,000.00        
725-02 temporary detour roads 2,403.7    SQYD 70.00 168,259.00 100.00 240,370.00        
727-01 mobilization lump      LUMP 300,000.00 300,000.00 350,000.00 350,000.00        
729-01 sign (type a) 37.5    SQFT 40.00 1,500.00 22.00 825.00        
729-01-A sign (type a)(mast arm mounted) 30.0    SQFT 40.00 1,200.00 19.00 570.00        
729-02 sign (type b) 94.7    SQFT 35.00 3,314.50 17.50 1,657.25        
729-16-C object marker assembly (type 3) 2      EACH 110.00 220.00 82.00 164.00        
729-21 u-channel post 14      EACH 50.00 700.00 95.00 1,330.00        
730-01 trenching and backfilling 3,700      LNFT 2.25 8,325.00 2.00 7,400.00        
730-02-A conduit with conductors (3#4 xhhw-2 conductors in
1-1/2" rigid galvanized steel conduit (above
ground))
40      LNFT 23.00 920.00 20.00 800.00        
730-02-B conduit with conductors (3#4 xhhw-2 conductors in
1-1/2" schedule 40 pvc conduit (underground))
300      LNFT 12.00 3,600.00 10.00 3,000.00        
730-02-C conduit with conductors (4#6 xhhw-2 conductors,
1#8 bare solid ground in 1- 1/2" schedule 40 pvc
conduit (underground))
300      LNFT 12.00 3,600.00 10.00 3,000.00        
730-02-D conduit with conductors (2#6 xhhw-2 conductors,
1#8 bare solid ground in 1- 1/2" schedule 40 pvc
conduit (undergound))
3,060      LNFT 7.30 22,338.00 6.50 19,890.00        
730-02-E conduit with conductors (2#6 xhhw-2 conductors,
1#8 bare solid ground in 1- 1/2" galv. rigid
steel conduit (undergrnd))
40      LNFT 12.00 480.00 10.00 400.00        
730-02-F conduit with conductors (2#6 xhhw-2 conductors,
1#8 green ground in 1-1/2" rigid aluminum
conduit (structure mount))
170      LNFT 30.00 5,100.00 26.00 4,420.00        
730-02-G conduit with conductors (2#6 xhhw-2 conductors,
1#8 green ground in 1-1/2" liq.tight flex. metal
conduit (str. mount))
30      LNFT 34.00 1,020.00 30.00 900.00        
730-04-A jacking or bored casing (6" diameter schedule 80 pvc
conduit)
400      LNFT 73.00 29,200.00 65.00 26,000.00        
730-05-A light pole (barrier structure mount, steel, 40'
mounting height, 6' truss a rm, concrete blister)
1      EACH 3,400.00 3,400.00 3,000.00 3,000.00        
730-05-B light pole (40' mounting height, steel, breakaway
trans. base, junct. box, concrete drill shaft,
concrete mowing apron)
2      EACH 7,000.00 14,000.00 6,300.00 12,600.00        
730-07-A luminaire 17      EACH 500.00 8,500.00 450.00 7,650.00        
730-08-A electrical service point (existing pole) 3      EACH 3,400.00 10,200.00 3,000.00 9,000.00        
730-09 electrical system lump      LUMP 11,000.00 11,000.00 9,800.00 9,800.00        
730-14-A removal and disposal of luminaires (250 watt high
pressure sodium)
15      EACH 110.00 1,650.00 100.00 1,500.00        
730-15-A relocate light poles (40' steel, ground mount, 6'
truss arm)
9      EACH 2,000.00 18,000.00 1,800.00 16,200.00        
730-16-A underground junction box (13" x 24") 6      EACH 450.00 2,700.00 400.00 2,400.00        
730-17-A structure junction box (8" x 8" x 4") 4      EACH 450.00 1,800.00 400.00 1,600.00        
731-02 reflectorized raised pavement markers 800      EACH 6.00 4,800.00 5.90 4,720.00        
732-01-C-04 plastic pavement striping (dotted line)(8" width) 1,517      LNFT 1.40 2,123.80 1.65 2,503.05        
732-02-A plastic pavement striping (solid line) (4" width) 2.344  MILE 2,600.00 6,094.40 2,565.00 6,012.36        
732-02-C plastic pavement striping (solid line) (8" width) 0.417  MILE 5,300.00 2,210.10 4,950.00 2,064.15        
732-02-E plastic pavement striping (solid line) (24" width) 0.161  MILE 16,000.00 2,576.00 15,000.00 2,415.00        
732-03-A plastic pavement striping (broken line)(4" width) 0.202  MILE 820.00 165.64 750.00 151.50        
732-04-A plastic pavement legends & symbols (arrow) 10      EACH 160.00 1,600.00 165.00 1,650.00        
732-04-B plastic pavement legends & symbols (double arrow) 1      EACH 220.00 220.00 215.00 215.00        
732-04-C plastic pavement legends & symbols (only) 10      EACH 175.00 1,750.00 175.00 1,750.00        
736-01 trenching and backfilling 2,885      LNFT 2.25 6,491.25 2.00 5,770.00        
736-03-B jacked or bored conduit (3" p.e.c., sch.80) 1,005      LNFT 23.50 23,617.50 21.00 21,105.00        
736-04-B signal support (mast arm 25') 4      EACH 10,000.00 40,000.00 8,620.00 34,480.00        
736-04-C signal support (mast arm 30') 1      EACH 10,000.00 10,000.00 8,740.00 8,740.00        
736-04-D signal support (mast arm 50') 1      EACH 14,000.00 14,000.00 12,700.00 12,700.00        
736-04-E signal support (duel mast arm 30'/50') 1      EACH 19,000.00 19,000.00 16,680.00 16,680.00        
736-05-B signal heads (12" l.e.d., 3 section, r, y, g) 18      EACH 1,500.00 27,000.00 1,350.00 24,300.00        
736-05-C signal heads (12" l.e.d., 5 section, r, y, lt.y, lt.g,
g)
3      EACH 2,200.00 6,600.00 2,000.00 6,000.00        
736-06-A signal service (pedestal type) 2      EACH 2,000.00 4,000.00 1,800.00 3,600.00        
736-08-A signal controller (nema, ts-2, type 2, type 6 ground
mounted cabinet)
3      EACH 20,000.00 60,000.00 18,000.00 54,000.00        
736-10-A underground junction box (type f) 4      EACH 600.00 2,400.00 525.00 2,100.00        
736-10-B underground junction box (type g) 9      EACH 1,000.00 9,000.00 857.00 7,713.00        
736-10-C underground junction box (type h) 3      EACH 1,200.00 3,600.00 1,058.00 3,174.00        
736-10-D underground junction box (type e) 6      EACH 500.00 3,000.00 460.00 2,760.00        
736-11-A conduit (2" p.e.c., sch.80) 2,770      LNFT 5.60 15,512.00 5.00 13,850.00        
736-11-B conduit (3" p.e.c., sch.80) 115      LNFT 12.00 1,380.00 10.00 1,150.00        
736-12-A conductor (power, 3c, 6 gauge, #6 awg., concentric) 1,530      LNFT 3.65 5,584.50 3.25 4,972.50        
736-12-B conductor (signal, 10c, #14 awg., stranded) 1,035      LNFT 2.80 2,898.00 2.50 2,587.50        
736-12-C conductor (interconnect, 6 pair, twisted pair,
#19 awg., solid, imsa 20-2)
1,200      LNFT 6.75 8,100.00 6.00 7,200.00        
739-01 hydro-seeding 5.00   ACRE 2,000.00 10,000.00 1,600.00 8,000.00        
740-01 construction layout lump      LUMP 70,000.00 70,000.00 50,000.00 50,000.00        
744-01 traffic control management lump      LUMP 54,000.00 54,000.00 100,000.00 100,000.00        
804-01-E precast concrete piles (20") 800      LNFT 172.00 137,600.00 90.00 72,000.00        
804-12 loading permanent piles 1      EACH 1,000.00 1,000.00 1.00 1.00        
805-01-F class a concrete (bents) 34.69   CUYD 1,500.00 52,035.00 1,000.00 34,690.00        
806-01 deformed reinforcing steel 5,887      LB 2.00 11,774.00 1.10 6,475.70        
810-01 concrete railing (barrier) 342.25   LNFT 65.00 22,246.25 80.00 27,380.00        
813-01 concrete approach slabs 98.60   SQYD 250.00 24,650.00 195.00 19,227.00        
S-001 modular breakaway cable system (low mast) 11      EACH 2,500.00 27,500.00 2,200.00 24,200.00        
S-002 concrete marker (underground duct) 6      EACH 225.00 1,350.00 200.00 1,200.00        
S-003 marker tape (underground) 4,100      LNFT 1.10 4,510.00 1.00 4,100.00        
S-004 video detection device and connection 8      EACH 7,500.00 60,000.00 6,600.00 52,800.00        
S-005 video detection system 3      EACH 4,400.00 13,200.00 3,900.00 11,700.00        
S-006 convert catch basin to manhole 1      each 2,000.00 2,000.00 3,500.00 3,500.00        
S-007 impact attenuators (construction zone) 2      each 20,000.00 40,000.00 26,500.00 53,000.00        
S-008 sawcuting pcc pavement 440      LNFT 15.00 6,600.00 10.00 4,400.00        
S-101 slab saw cut lump      LUMP 15,000.00 15,000.00 8,000.00 8,000.00        
S-102 slab span widening 5      SPAN 72,000.00 360,000.00 27,500.00 137,500.00        
                       
 ITEM TOTAL (CONSTRUCTION BID)       3,293,616.94   3,664,506.46        
 Number of Days Bid at $2,000 per day.     300 600,000.00 300 600,000.00 0   0  
 TOTAL BID       3,893,616.94   4,264,506.46        