Each project in the letting is listed with descriptive information. Click on a project to obtain a tabulation of item bids for each bidder. It includes the unit bid for each item as well as the total item bid. Also shown are the bidder totals and ranking for each project.
| Lead Project: 002-05-0030 | |
| Parish: MADISON | |
| Routes: LA 3218 | |
| Description: US 80 - WEST END OF MISSISSIPPI RIVER BRIDGE | |
| Type Const:
cold planing asphaltic concrete, pavement patching and joint repair, superpave asphaltic concrete pavement, and related work. | |
| Low Bidder: DIAMOND B CONSTRUCTION CO., L.L.C. | |
| Amount: $797,461.70 | |
| Estimated Construction Cost: $693,951.70 | |
| Federal Number: | |
| READV | |
| Lead Project: 004-04-0024 | |
| Parish: IBERIA | |
| Routes: LA 182-E | |
| Description: 0.087 MI. WEST LA 677 - JCT. LA 677 (CM) | |
| Type Const: pccp patching | |
| Low Bidder: CECIL PERRY IMPROVEMENTS LTD. | |
| Amount: $176,297.00 | |
| Estimated Construction Cost: $296,835.50 | |
| Federal Number: STP-2307(503) | |
| DBE GOAL FED | |
| Lead Project: 009-32-0021 | |
| Parish: GRANT | |
| Routes: LA 158 | |
| Description: BAYOU GRAPPE BRIDGE AND APPROACHES | |
| Type Const:
grading, removal of existing bridge, drainage struct, lime trmt, class ii bc, superpave asph conc pvmt, pre-cast prestressed conc girders and related work. | |
| Low Bidder: JAMES CONSTRUCTION GROUP LLC | |
| Amount: $2,006,233.95 | |
| Estimated Construction Cost: $1,887,864.19 | |
| Federal Number: BRO-558-1(002) | |
| Lead Project: 038-05-0001 | |
| Parish: MOREHOUSE | |
| Routes: LA 1257 | |
| Description: JCT. US 425 - ENTRANCE TO CHEMIN-A-HAUT | |
| Type Const:
grading, drainage structures, in-place cement treated base course, superpave asphaltic concrete pavement, and related work. | |
| Low Bidder: D & J CONSTRUCTION CO., INC. | |
| Amount: $367,793.50 | |
| Estimated Construction Cost: $233,331.94 | |
| Federal Number: | |
| READV | |
| Lead Project: 051-05-0010 | |
| Parish: RICHLAND, W CARROLL | |
| Routes: LA 17 | |
| Description: 0.75 MILES NORTH OF JCT US 80 TO WEST CARROLL P/L | |
| Type Const: asphalt surface treatment | |
| Low Bidder: DREHER CONTRACTING, INC. | |
| Amount: $641,738.75 | |
| Estimated Construction Cost: $754,670.00 | |
| Federal Number: STP-4207(502) | |
| Lead Project: 053-01-0028 | |
| Parish: RAPIDES | |
| Routes: LA 1 | |
| Description: MISSOURI PACIFIC RR - RAPIDES STA. RD. | |
| Type Const:
pavement patching, cold planing asphaltic concrete, superpave asphaltic concrete overlay, and related work. | |
| Low Bidder: GILCHRIST CONSTRUCTION CO. LLC | |
| Amount: $898,283.86 | |
| Estimated Construction Cost: $923,917.24 | |
| Federal Number: | |
| READV | |
| Lead Project: 077-05-0052 | |
| Parish: E BATON ROUGE | |
| Routes: LA 73 | |
| Description: LA 1068 - GOVERNMENT STREET | |
| Type Const: concrete patching | |
| Low Bidder: FORBY CONTRACTING, INC. | |
| Amount: $953,585.00 | |
| Estimated Construction Cost: $661,141.25 | |
| Federal Number: NH-1707(507) | |
| Lead Project: 103-01-0025 | |
| Parish: CADDO | |
| Routes: LA 523 | |
| Description: JCT. EXISTING 5-LANE TO JCT. LA 1 | |
| Type Const:
grading, drain struc, class ii bc, lime trmt, superpave acp, pccp, traffic signals, slab span bridges, and related work. | |
| Low Bidder: GILCHRIST CONSTRUCTION CO. LLC | |
| Amount: $23,348,707.83 | |
| Estimated Construction Cost: $19,887,946.05 | |
| Federal Number: | |
| DBE GOAL FED | |
| Lead Project: 193-06-0032 | |
| Parish: CALCASIEU | |
| Routes: LA 14, I-210 | |
| Description: I-210 AT LA14 EB ON-RAMP MODIFICATION & RIGHT TURN LANES | |
| Type Const:
grading, drainage structures, lime treatment, class ii base course, portland cement concrete pavement and related work. | |
| Low Bidder: JOHN BAILEY, INC. | |
| Amount: $1,268,254.96 | |
| Estimated Construction Cost: $837,233.50 | |
| Federal Number: DE-1004(507) | |
| Lead Project: 270-05-0014 | |
| Parish: ST HELENA, WASHINGTON, TANGIPAHOA | |
| Routes: LA 43, LA 436, LA 438, LA 1047, LA 1055 | |
| Description: DISTRICT 62 ASPHALTIC SURFACE TREATMENT (PM) | |
| Type Const: asphaltic surface treatment | |
| Low Bidder: W. R. CORE, LLC. | |
| Amount: $954,892.95 | |
| Estimated Construction Cost: $1,084,244.18 | |
| Federal Number: | |
| Lead Project: 420-01-0037 | |
| Parish: CADDO | |
| Routes: LA 3032 | |
| Description: TURN LANE ADDITION | |
| Type Const: grading, class ii base course, portland cement concrete pavement, and related work. | |
| Low Bidder: F. J. BURNELL, INC. | |
| Amount: $113,208.50 | |
| Estimated Construction Cost: $132,457.50 | |
| Federal Number: STP-0903(521) | |
| Lead Project: 450-05-0055 | |
| Parish: LAFAYETTE | |
| Routes: I-10 | |
| Description: I-10 @ LOUISIANA AVENUE-INTERCHANGE LIGHTING | |
| Type Const: roadway lighting and related work | |
| Low Bidder: JACK B. HARPER CONTRACTOR, INC. | |
| Amount: $864,024.00 | |
| Estimated Construction Cost: $845,362.50 | |
| Federal Number: IM-2804(514) | |
| Lead Project: 450-18-0107 | |
| Parish: ST TAMMANY | |
| Routes: I-10 | |
| Description: PAVEMENT MARKING REPLACEMENT | |
| Type Const: striping, raised pavement markers, and related work. | |
| Low Bidder: SOUTHERN SYNERGY LLC | |
| Amount: $229,195.00 | |
| Estimated Construction Cost: $395,475.00 | |
| Federal Number: IM-5207(501) | |
| REBID | |
| Lead Project: 450-90-0210 | |
| Parish: ORLEANS | |
| Routes: I-10 | |
| Description: PONTCHARTRAIN PUMP STATION REPAIRS DUE TO HURRICANE KATRINA | |
| Type Const: electrical and mechanical repairs to the pump station | |
| Low Bidder: INDUSTRIAL & MECHANICAL CONTR. LLC | |
| Amount: $1,373,735.00 | |
| Estimated Construction Cost: $1,092,500.00 | |
| Federal Number: ER-ERP1(028) | |
| DBE GOAL FED | |
| Lead Project: 455-09-0008 | |
| Parish: CADDO | |
| Routes: I-49, US 71 | |
| Description: I-49 NORTH, (LA 2 TO MIRA-MYRTIS ROAD) | |
| Type Const:
grad,class ii bc, lime trmt, drain struct, superpave acp, girder span bridge,(alt. a - pavement alternates), (alt. d - bridge foundation alternates), and related work. | |
| Low Bidder: T.J. LAMBRECHT CONSTRUCTION, INC. | |
| Amount: $19,430,012.87 | |
| Estimated Construction Cost: $27,242,689.31 | |
| Federal Number: DPS-0021(023) | |
| DBE GOAL FED | |
| Lead Project: 602-88-0001 | |
| Parish: LAFOURCHE | |
| Routes: LA 1, LA 308, LA 3235, LA 3090 | |
| Description: LA 1 TOLL CUST SERV CTR,SIGN,ITS,LIGHT,TOLL SYS (PHASE 1D) | |
| Type Const:
grading, drainage structures, class ii base course, portland cement concrete pavement, building construction (general, mech, elec, plumb, sewer, water) traffic sign,& related work | |
| Low Bidder: ERNEST P. BREAUX ELECTRICAL, INC. | |
| Amount: $7,548,884.09 | |
| Estimated Construction Cost: $5,905,997.60 | |
| Federal Number: DE-2908(500) | |
| DBE GOAL FED | |
| Lead Project: 737-90-0052 | |
| Parish: DISTRICT 62, LIVINGSTON, ST HELENA, ST TAMMANY | |
| Routes: | |
| Description: DISTRICT 62 SIGNAL UPGRADES | |
| Type Const: traffic signalization and related work. | |
| Low Bidder: DIAMOND ELECTRICAL CO., INC. | |
| Amount: $746,224.65 | |
| Estimated Construction Cost: $848,447.95 | |
| Federal Number: STP-9007(500) | |
| DBE GOAL FED | |
| Lead Project: 737-93-0050 | |
| Parish: DISTRICT 03 | |
| Routes: | |
| Description: DISTRICT 03 SIGNAL UPGRADES | |
| Type Const: traffic signalization and related work | |
| Low Bidder: ERNEST P. BREAUX ELECTRICAL, INC. | |
| Amount: $717,861.43 | |
| Estimated Construction Cost: $839,413.73 | |
| Federal Number: STP-9307(500) | |
| DBE GOAL FED | |
| Lead Project: 737-94-0044 | |
| Parish: DISTRICT 04, CADDO, WEBSTER | |
| Routes: | |
| Description: DISTRICT 04 SIGNAL UPGRADES | |
| Type Const: traffic signalization and related work. | |
| Low Bidder: WYE ELECTRIC, INC. | |
| Amount: $707,946.10 | |
| Estimated Construction Cost: $710,617.12 | |
| Federal Number: STP-9407(502) | |
| DBE GOAL FED | |
| Lead Project: 744-40-0018 | |
| Parish: RAPIDES | |
| Routes: | |
| Description: BAYOU RAPIDES MULTI-USE TRAIL PHASE 1B | |
| Type Const:
grading, drainage structures, class ii base course, superpave asphaltic concrete pavement, concrete walk, landscaping, lighting and related work. | |
| Low Bidder: APECK CONSTRUCTION, INC. | |
| Amount: $496,304.64 | |
| Estimated Construction Cost: $430,953.55 | |
| Federal Number: ENH-4003(531) | |