| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - JOHN BAILEY, INC. |
- 2 - GILCHRIST CONSTRUCTION CO. LLC |
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 201-01 |
clearing & grubbing
|
lump |
LUMP |
50,000.00 |
50,000.00 |
65,000.00 |
65,000.00 |
|
|
|
|
| 202-02-E |
removal of concrete curbs
|
554.9 |
LNFT |
12.00 |
6,658.80 |
9.00 |
4,994.10 |
|
|
|
|
| 202-02-F |
removal of concrete combination curb & gutter
|
478.0 |
LNFT |
15.00 |
7,170.00 |
11.00 |
5,258.00 |
|
|
|
|
| 202-02-I |
removal of signs and supports
|
2   |
EACH |
250.00 |
500.00 |
2,400.00 |
4,800.00 |
|
|
|
|
| 202-02-J |
removal of concrete headwall (sta.19+11.74 to
sta.19+63.25) |
1   |
EACH |
6,500.00 |
6,500.00 |
8,500.00 |
8,500.00 |
|
|
|
|
| 202-03-A |
relocation of traffic control pedestal
|
1   |
EACH |
35,280.00 |
35,280.00 |
35,000.00 |
35,000.00 |
|
|
|
|
| 202-03-B |
relocation of gas valve
|
1   |
EACH |
2,500.00 |
2,500.00 |
650.00 |
650.00 |
|
|
|
|
| 203-05 |
excavation & embankment
|
lump |
LUMP |
75,000.00 |
75,000.00 |
100,000.00 |
100,000.00 |
|
|
|
|
| 204-05-A |
temporary sediment check dams (hay)
|
5   |
EACH |
200.00 |
1,000.00 |
300.00 |
1,500.00 |
|
|
|
|
| 204-06 |
temporary silt fencing
|
1,360   |
LNFT |
4.50 |
6,120.00 |
2.00 |
2,720.00 |
|
|
|
|
| 302-02-A |
class ii base course (4" thick crushed stone)
|
3,768.2 |
SQYD |
15.00 |
56,523.00 |
14.00 |
52,754.80 |
|
|
|
|
| 302-02-C |
class ii base course (8" thick soil cement)
|
3,768.2 |
SQYD |
23.00 |
86,668.60 |
16.00 |
60,291.20 |
|
|
|
|
| 304-01 |
lime
|
53.98 |
TON |
200.00 |
10,796.00 |
180.00 |
9,716.40 |
|
|
|
|
| 304-04-D |
lime treatment (type d) (12" thick)
|
3,808   |
SQYD |
9.00 |
34,272.00 |
7.50 |
28,560.00 |
|
|
|
|
| 601-01-K |
portland cement concrete pavement (10" thick)
|
3,611.4 |
SQYD |
95.00 |
343,083.00 |
85.00 |
306,969.00 |
|
|
|
|
| 601-04 |
portland cement concrete pavement coring
|
5   |
EACH |
270.00 |
1,350.00 |
130.00 |
650.00 |
|
|
|
|
| 701-03-G |
storm drain pipe (18" rcp/pcp)
|
64   |
LNFT |
145.00 |
9,280.00 |
170.00 |
10,880.00 |
|
|
|
|
| 701-04-L |
storm drain pipe arch (72" equiv. rcpa)
|
200   |
LNFT |
455.00 |
91,000.00 |
575.00 |
115,000.00 |
|
|
|
|
| 701-10-O |
reinforced concrete pipe (extension)(48")
|
20   |
LNFT |
360.00 |
7,200.00 |
435.00 |
8,700.00 |
|
|
|
|
| 701-10-Q |
reinforced concrete pipe (extension)(60")
|
20   |
LNFT |
456.00 |
9,120.00 |
535.00 |
10,700.00 |
|
|
|
|
| 702-02-A |
manholes (mh-06)
|
1   |
EACH |
9,600.00 |
9,600.00 |
15,000.00 |
15,000.00 |
|
|
|
|
| 702-02-C |
manholes (r-cb-11 mod)
|
2   |
EACH |
9,600.00 |
19,200.00 |
15,000.00 |
30,000.00 |
|
|
|
|
| 702-03-B |
catch basins (cb-02)
|
2   |
EACH |
5,400.00 |
10,800.00 |
6,000.00 |
12,000.00 |
|
|
|
|
| 702-03-C |
catch basins (cb-06)
|
3   |
EACH |
4,800.00 |
14,400.00 |
5,000.00 |
15,000.00 |
|
|
|
|
| 702-04-A |
adjusting manholes
|
1   |
EACH |
2,160.00 |
2,160.00 |
2,300.00 |
2,300.00 |
|
|
|
|
| 702-04-B |
adjusting catch basins
|
4   |
EACH |
3,000.00 |
12,000.00 |
3,200.00 |
12,800.00 |
|
|
|
|
| 704-03 |
blocked out guard rail
|
12.5 |
LNFT |
100.00 |
1,250.00 |
50.00 |
625.00 |
|
|
|
|
| 704-08-B |
guard rail transitions (double thrie beam)
|
25.0 |
LNFT |
100.00 |
2,500.00 |
80.00 |
2,000.00 |
|
|
|
|
| 704-11-A |
guard rail end treatment (flared)
|
1   |
EACH |
150.00 |
150.00 |
3,200.00 |
3,200.00 |
|
|
|
|
| 706-03-C |
incidental concrete paving (6" thick)
|
633.9 |
SQYD |
85.00 |
53,881.50 |
58.00 |
36,766.20 |
|
|
|
|
| 707-01 |
concrete curb
|
1,157.2 |
LNFT |
15.00 |
17,358.00 |
2.75 |
3,182.30 |
|
|
|
|
| 708-01 |
right-of-way monument
|
2   |
EACH |
250.00 |
500.00 |
380.00 |
760.00 |
|
|
|
|
| 711-01-C |
riprap (30 lb, 14in)
|
155   |
SQYD |
80.00 |
12,400.00 |
78.00 |
12,090.00 |
|
|
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
50,000.00 |
50,000.00 |
65,000.00 |
65,000.00 |
|
|
|
|
| 722-01 |
project site laboratory
|
1   |
EACH |
25,000.00 |
25,000.00 |
23,000.00 |
23,000.00 |
|
|
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
85,000.00 |
85,000.00 |
120,000.00 |
120,000.00 |
|
|
|
|
| 730-15 |
relocate light poles (10" & wood)
|
2   |
EACH |
3,500.00 |
7,000.00 |
4,500.00 |
9,000.00 |
|
|
|
|
| 731-02 |
reflectorized raised pavement markers
|
56   |
EACH |
7.32 |
409.92 |
8.00 |
448.00 |
|
|
|
|
| 732-01-E |
plastic pavement striping (24" width)
|
9   |
LNFT |
5.10 |
45.90 |
5.50 |
49.50 |
|
|
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
0.519 |
MILE |
3,540.00 |
1,837.26 |
3,900.00 |
2,024.10 |
|
|
|
|
| 732-02-C |
plastic pavement striping (solid line) (8" width)
|
0.070 |
MILE |
7,692.00 |
538.44 |
8,400.00 |
588.00 |
|
|
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
0.068 |
MILE |
955.00 |
64.94 |
1,000.00 |
68.00 |
|
|
|
|
| 732-04-A |
plastic pavement legends & symbols (arrow)
|
2   |
EACH |
210.00 |
420.00 |
230.00 |
460.00 |
|
|
|
|
| 732-04-B |
plastic pavement legends & symbols (double arrow)
|
1   |
EACH |
234.00 |
234.00 |
250.00 |
250.00 |
|
|
|
|
| 732-04-C |
plastic pavement legends & symbols (only)
|
1   |
EACH |
174.00 |
174.00 |
185.00 |
185.00 |
|
|
|
|
| 733-01 |
concrete roadway barrier (single faced)
|
100.0 |
LNFT |
630.00 |
63,000.00 |
335.00 |
33,500.00 |
|
|
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
10,000.00 |
10,000.00 |
50,000.00 |
50,000.00 |
|
|
|
|
| 741-08 |
relocating water meter
|
1   |
EACH |
2,500.00 |
2,500.00 |
650.00 |
650.00 |
|
|
|
|
| 805-01-A |
class a concrete (pipe headwalls)
|
14.30 |
CUYD |
1,200.00 |
17,160.00 |
1,300.00 |
18,590.00 |
|
|
|
|
| 806-01 |
deformed reinforcing steel
|
861   |
LB |
3.60 |
3,099.60 |
3.95 |
3,400.95 |
|
|
|
|
| S-001 |
saw cutting porland cement concrete pavement (8" thick)
|
555   |
LNFT |
10.00 |
5,550.00 |
13.00 |
7,215.00 |
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
1,268,254.96 |
|
1,312,795.55 |
|
|
|
|
|