| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - APECK CONSTRUCTION, INC. |
- 2 - QUALITY DESIGN & CONSTRUCTION, INC. |
- 3 - VANTEL, INC |
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-02-I |
removal of asphaltic concrete surface
|
50.0 |
SQYD |
48.00 |
2,400.00 |
40.00 |
2,000.00 |
13.00 |
650.00 |
|
|
| 202-02-J |
removal of existing bike route end sign
|
1   |
EACH |
200.00 |
200.00 |
330.00 |
330.00 |
100.00 |
100.00 |
|
|
| 203-05 |
excavation and embankment
|
lump |
LUMP |
32,639.00 |
32,639.00 |
118,000.00 |
118,000.00 |
38,000.00 |
38,000.00 |
|
|
| 204-05-A |
temporary sediment check dams (hay)
|
3   |
EACH |
300.00 |
900.00 |
220.00 |
660.00 |
300.00 |
900.00 |
|
|
| 204-06 |
temporary silt fencing
|
505   |
LNFT |
3.15 |
1,590.75 |
2.00 |
1,010.00 |
3.00 |
1,515.00 |
|
|
| 302-02-A |
class ii base course (4" thick)
|
3,062.5 |
SQYD |
8.19 |
25,081.88 |
13.00 |
39,812.50 |
13.00 |
39,812.50 |
|
|
| 502-01 |
superpave asphaltic concrete
|
264.8 |
TON |
118.00 |
31,246.40 |
153.00 |
40,514.40 |
150.00 |
39,720.00 |
|
|
| 701-01-F |
cross drain pipe (15" rcp)
|
38   |
LNFT |
79.00 |
3,002.00 |
165.70 |
6,296.60 |
65.00 |
2,470.00 |
|
|
| 705-06-D |
chain link fence (7-foot height)
|
60   |
LNFT |
22.00 |
1,320.00 |
50.00 |
3,000.00 |
50.00 |
3,000.00 |
|
|
| 706-01-A |
concrete walk (4" thick)
|
447.5 |
SQYD |
48.00 |
21,480.00 |
55.60 |
24,881.00 |
50.00 |
22,375.00 |
|
|
| 711-02-C |
riprap (30 lb)
|
18   |
CUYD |
87.96 |
1,583.28 |
114.20 |
2,055.60 |
35.00 |
630.00 |
|
|
| 711-04 |
geotextile fabric
|
3,110   |
SQYD |
1.86 |
5,784.60 |
2.00 |
6,220.00 |
2.00 |
6,220.00 |
|
|
| 715-01 |
topsoil
|
450   |
CUYD |
18.00 |
8,100.00 |
25.50 |
11,475.00 |
6.00 |
2,700.00 |
|
|
| 716-01-A |
mulch (vegetative)
|
0.7 |
TON |
450.00 |
315.00 |
3,060.00 |
2,142.00 |
1,200.00 |
840.00 |
|
|
| 719-01-A |
plants (white oak, quercus alba, 2" caliper, 10'-12'
ht, 4' min spread, 25 gal) |
11   |
EACH |
432.00 |
4,752.00 |
321.00 |
3,531.00 |
347.00 |
3,817.00 |
|
|
| 719-01-B |
plants (nuttalli oak, quercus nuttallii, 2" caliper,
10'-12' ht, 4' min spread, 25 gal) |
12   |
EACH |
432.00 |
5,184.00 |
321.00 |
3,852.00 |
347.00 |
4,164.00 |
|
|
| 719-01-C |
plants (river birch, betula nigra, 2" caliper, 10'-12'
ht, 4' min spread, 25 gal) |
23   |
EACH |
432.00 |
9,936.00 |
315.00 |
7,245.00 |
347.00 |
7,981.00 |
|
|
| 719-01-D |
plants (weeping willow, salix babylonica, 2" caliper,
10'-12' ht, 4' min spread, 25 gal) |
2   |
EACH |
432.00 |
864.00 |
315.00 |
630.00 |
347.00 |
694.00 |
|
|
| 719-01-E |
plants (bald cypress, taxodium distichum, 2" caliper,
10'-12' ht, 4' min spread, 25 gal) |
30   |
EACH |
432.00 |
12,960.00 |
315.00 |
9,450.00 |
347.00 |
10,410.00 |
|
|
| 719-01-F |
plants (swamp red maple, acer rubrum drumimondii, 2"
caliper, 10'-12' ht, 4' min spread, 25 gal) |
19   |
EACH |
480.00 |
9,120.00 |
321.00 |
6,099.00 |
347.00 |
6,593.00 |
|
|
| 719-01-G |
plants (eastern red cedar, juniperus virginiana, 6'-8'
ht, 3' min spread, 15 gal) |
23   |
EACH |
384.00 |
8,832.00 |
312.00 |
7,176.00 |
268.00 |
6,164.00 |
|
|
| 719-02 |
top dressing mulch (3" depth)
|
2,275   |
SQYD |
4.20 |
9,555.00 |
4.10 |
9,327.50 |
9.00 |
20,475.00 |
|
|
| 723-01 |
granular material (net section)
|
45   |
CUYD |
86.67 |
3,900.15 |
76.50 |
3,442.50 |
100.00 |
4,500.00 |
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
6,500.00 |
6,500.00 |
28,400.00 |
28,400.00 |
5,000.00 |
5,000.00 |
|
|
| 729-01 |
sign (type a)
|
14.4 |
SQFT |
110.00 |
1,584.00 |
25.50 |
367.20 |
135.00 |
1,944.00 |
|
|
| 729-08-A |
mounting (2 1/2" post)
|
5   |
EACH |
25.00 |
125.00 |
90.00 |
450.00 |
50.00 |
250.00 |
|
|
| 730-01 |
trenching and backfilling
|
2,772   |
LNFT |
7.00 |
19,404.00 |
3.50 |
9,702.00 |
5.00 |
13,860.00 |
|
|
| 730-02-A |
conduit with conductors (3/4", lfmc, 2#8, 1#10 green
ground) |
12   |
LNFT |
10.00 |
120.00 |
15.00 |
180.00 |
100.00 |
1,200.00 |
|
|
| 730-02-B |
conduit with conductors (3/4", rigid aluminum conduit,
2#8, 1#10 green ground) |
440   |
LNFT |
8.18 |
3,599.20 |
23.90 |
10,516.00 |
7.00 |
3,080.00 |
|
|
| 730-02-C |
conduit with conductors (1", sch 40 pvc, 2#8,
1#10 green ground) |
2,820   |
LNFT |
7.62 |
21,488.40 |
4.50 |
12,690.00 |
7.00 |
19,740.00 |
|
|
| 730-05 |
light pole (14 ft aluminum, decorative)
|
41   |
EACH |
1,800.00 |
73,800.00 |
1,450.00 |
59,450.00 |
1,600.00 |
65,600.00 |
|
|
| 730-07-A |
luminaire (16" dia sphere pole mounted area hid)
|
41   |
EACH |
1,200.00 |
49,200.00 |
1,140.00 |
46,740.00 |
1,100.00 |
45,100.00 |
|
|
| 730-07-B |
luminaire (16" dia sphere surface mounted area hid)
|
4   |
EACH |
720.00 |
2,880.00 |
740.00 |
2,960.00 |
700.00 |
2,800.00 |
|
|
| 730-08 |
electrical service point (pedestal mounted lighting
controller cabinet) |
1   |
EACH |
5,400.00 |
5,400.00 |
7,400.00 |
7,400.00 |
5,000.00 |
5,000.00 |
|
|
| 730-10 |
fabricated light pole support
|
41   |
EACH |
1,020.00 |
41,820.00 |
428.00 |
17,548.00 |
900.00 |
36,900.00 |
|
|
| 738-01 |
mulch sodding
|
340   |
CUYD |
18.00 |
6,120.00 |
21.30 |
7,242.00 |
10.00 |
3,400.00 |
|
|
| 739-01 |
hydro-seeding
|
0.47 |
ACRE |
634.00 |
297.98 |
4,080.00 |
1,917.60 |
2,500.00 |
1,175.00 |
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
3,000.00 |
3,000.00 |
7,700.00 |
7,700.00 |
5,000.00 |
5,000.00 |
|
|
| S-001 |
bike path canopy incl. retaining wall,metal
structure,sheeting,seg block ret.wall leveling pads,concrete cap& geogrid |
lump |
LUMP |
59,500.00 |
59,500.00 |
58,900.00 |
58,900.00 |
152,000.00 |
152,000.00 |
|
|
| S-002 |
saw cut asphaltic concrete (per 1" depth)
|
120   |
LNFT |
6.00 |
720.00 |
8.00 |
960.00 |
5.00 |
600.00 |
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
496,304.64 |
|
582,272.90 |
|
586,379.50 |
|
|
|