| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - D & J CONSTRUCTION CO., INC. |
- 2 - DIAMOND B CONSTRUCTION CO., L.L.C. |
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-01 |
removal of structures & obstructions
|
lump |
LUMP |
5,000.00 |
5,000.00 |
20,500.00 |
20,500.00 |
|
|
|
|
| 203-07 |
borrow (vehicular measurement)
|
159   |
CUYD |
25.00 |
3,975.00 |
25.00 |
3,975.00 |
|
|
|
|
| 308-01-A |
in-place cement treated base course (12" thick)
|
9,202   |
SQYD |
14.00 |
128,828.00 |
15.00 |
138,030.00 |
|
|
|
|
| 502-01 |
superpave asphaltic concrete
|
953.5 |
TON |
115.00 |
109,652.50 |
115.00 |
109,652.50 |
|
|
|
|
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
11.3 |
TON |
400.00 |
4,520.00 |
400.00 |
4,520.00 |
|
|
|
|
| 701-10-I |
reinforced concrete pipe (extension)(24")
|
50   |
LNFT |
175.00 |
8,750.00 |
220.00 |
11,000.00 |
|
|
|
|
| 701-15 |
concrete collar
|
8   |
EACH |
1,000.00 |
8,000.00 |
875.00 |
7,000.00 |
|
|
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
32,000.00 |
32,000.00 |
30,000.00 |
30,000.00 |
|
|
|
|
| 716-01-A |
mulch (vegetative)
|
2.6 |
TON |
800.00 |
2,080.00 |
1,000.00 |
2,600.00 |
|
|
|
|
| 717-01 |
seeding
|
58   |
LB |
16.00 |
928.00 |
22.00 |
1,276.00 |
|
|
|
|
| 718-01 |
fertilizer
|
1,280   |
LB |
0.75 |
960.00 |
1.25 |
1,600.00 |
|
|
|
|
| 726-01 |
bedding material
|
22.8 |
CUYD |
100.00 |
2,280.00 |
150.00 |
3,420.00 |
|
|
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
35,000.00 |
35,000.00 |
40,000.00 |
40,000.00 |
|
|
|
|
| 729-16-B |
object marker assembly (type 2)
|
8   |
EACH |
100.00 |
800.00 |
150.00 |
1,200.00 |
|
|
|
|
| 731-02 |
reflectorized raised pavement markers
|
87   |
EACH |
15.00 |
1,305.00 |
15.00 |
1,305.00 |
|
|
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
2.633 |
MILE |
5,000.00 |
13,165.00 |
4,500.00 |
11,848.50 |
|
|
|
|
| 735-01 |
mailboxes
|
2   |
EACH |
25.00 |
50.00 |
10.00 |
20.00 |
|
|
|
|
| 735-02 |
mailbox supports (single)
|
2   |
EACH |
500.00 |
1,000.00 |
300.00 |
600.00 |
|
|
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
5,000.00 |
5,000.00 |
15,000.00 |
15,000.00 |
|
|
|
|
| S-001 |
cleaning existing ditches
|
300   |
LNFT |
15.00 |
4,500.00 |
15.00 |
4,500.00 |
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
367,793.50 |
|
408,047.00 |
|
|
|
|
|