Letting of 4/30/2008 LA DOTD Headquarters


 
go back
Go Back
DBE GOAL FED
Lead Project: 455-09-0008
Parish: CADDO
Routes: I-49, US 71
Description: I-49 NORTH, (LA 2 TO MIRA-MYRTIS ROAD)
Type Const: grad,class ii bc, lime trmt, drain struct, superpave acp, girder span bridge,(alt.
a - pavement alternates), (alt. d - bridge foundation alternates), and related work.
Estimated Construction Cost: $27,242,689.31
Maximum Number of Days Allowed for Construction: 750
Calculated Daily User Cost: $1,000.00
 
RankLicenseBidderConstruction Bid Bidder's Proposed
Contract Time
Life Cycle
Cost
Total Bid
1 47577 T.J. LAMBRECHT CONSTRUCTION, INC. $19,430,012.87 450 $565,000.00 $20,445,012.87
2 39670 EUTAW CONSTRUCTION CO. INC. $19,405,702.08 500 $565,000.00 $20,470,702.08
3 34567 JAMES CONSTRUCTION GROUP LLC $19,520,048.22 650 $565,000.00 $20,735,048.22
4 39462 DENTON-JAMES LLC $20,055,972.65 540 $565,000.00 $21,160,972.65
5 42076 AUSTIN BRIDGE & ROAD, LP $20,351,886.43 600 $565,000.00 $21,516,886.43
6 33685 SPECIALTY CONTRACTORS $20,355,783.55 700 $1,678,000.00 $22,734,583.55
7 12312 GILCHRIST CONSTRUCTION CO. LLC $24,463,133.86 700 $565,000.00 $25,728,133.86
 
Item Number Item Description Quantity Unit of Measure - 1 -
T.J. LAMBRECHT CONSTRUCTION, INC.
- 2 -
EUTAW CONSTRUCTION CO. INC.
- 3 -
JAMES CONSTRUCTION GROUP LLC
- 4 -
DENTON-JAMES LLC
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
201-01 clearing & grubbing lump      LUMP 229,950.00 229,950.00 500,000.00 500,000.00 750,000.00 750,000.00 750,000.00 750,000.00
202-01 removal of structures & obstructions lump      LUMP 12,129.53 12,129.53 15,000.00 15,000.00 40,000.00 40,000.00 30,000.00 30,000.00
202-02-B removal of concrete box culvert (sta. 47+920; 3' x 3'
x 76')
1      EACH 1,046.35 1,046.35 1,370.00 1,370.00 10,000.00 10,000.00 8,000.00 8,000.00
202-02-C removal of portland cement concrete pavement 4,862      SQYD 7.72 37,534.64 5.00 24,310.00 7.00 34,034.00 7.00 34,034.00
202-02-G removal of surfacing & stabilized base 3,241.2    SQYD 1.54 4,991.45 1.65 5,347.98 4.00 12,964.80 4.00 12,964.80
202-02-H removal of guard rail 1,370      LNFT 3.68 5,041.60 2.60 3,562.00 7.00 9,590.00 4.00 5,480.00
202-02-01 removal of wood barn (lt. of sta. 1508+73; 15' x 10') 1      EACH 550.54 550.54 295.00 295.00 250.00 250.00 1.00 1.00
202-02-02 removal of wood frame house (lt. of sta. 1549+99;
1665 sq. ft.)
1      EACH 1,101.11 1,101.11 2,395.00 2,395.00 1,500.00 1,500.00 1.00 1.00
202-02-03 removal of wood barn (lt. of sta. 1551+00; 270 sq. ft.) 1      EACH 550.54 550.54 295.00 295.00 250.00 250.00 1.00 1.00
202-02-04 removal of metal shed (lt. of sta. 1552+01; 80 sq. ft.) 1      EACH 550.54 550.54 235.00 235.00 1,500.00 1,500.00 1.00 1.00
202-02-05 removal of metal oilwell (no tanks) with utility pole
(rt. of sta. 1522+00)
1      EACH 84,000.00 84,000.00 35,000.00 35,000.00 7,000.00 7,000.00 1.00 1.00
203-01 general excavation 1,079,556      CUYD 1.79 1,932,405.24 1.90 2,051,156.40 2.00 2,159,112.00 2.10 2,267,067.60
203-03 embankment 1,076,158      CUYD 1.64 1,764,899.12 1.50 1,614,237.00 2.00 2,152,316.00 1.90 2,044,700.20
203-04 nonplastic embankment (stone) 2,161      CUYD 96.46 208,450.06 109.00 235,549.00 85.00 183,685.00 110.00 237,710.00
204-02 temporary hay or straw bales 84      EACH 10.50 882.00 15.00 1,260.00 100.00 8,400.00 10.00 840.00
204-03 temporary slope drains 2,035      LNFT 18.54 37,728.90 9.00 18,315.00 10.00 20,350.00 15.00 30,525.00
204-05-A temporary sediment check dams (hay) 48      EACH 126.00 6,048.00 200.00 9,600.00 145.00 6,960.00 120.00 5,760.00
204-05-B temporary sediment check dams (stone) 25      EACH 551.25 13,781.25 490.00 12,250.00 500.00 12,500.00 700.00 17,500.00
204-06 temporary silt fencing 10,400      LNFT 1.58 16,432.00 2.00 20,800.00 2.50 26,000.00 2.00 20,800.00
204-07 temporary stone construction entrance 2      EACH 4,009.97 8,019.94 3,250.00 6,500.00 5,700.00 11,400.00 2,500.00 5,000.00
302-01 class ii base course 17,205.2    CUYD 84.21 1,448,849.89 87.50 1,505,455.00 75.00 1,290,390.00 75.00 1,290,390.00
302-02-B-01 class ii base course (6" thick) (soil cement) 120,332.8    SQYD 6.76 813,449.73 5.00 601,664.00 7.00 842,329.60 6.50 782,163.20
305-01-D subgrade layer (12" thick) 120,333      SQYD 7.89 949,427.37 8.00 962,664.00 7.75 932,580.75 8.00 962,664.00
502-01 superpave asphaltic concrete 12,913.3    TON 87.56 1,130,688.55 84.00 1,084,717.20 82.50 1,065,347.25 83.00 1,071,803.90
502-01-A superpave asphaltic concrete, drives, turnouts and
miscellaneous
318.4    TON 193.18 61,508.51 184.00 58,585.60 182.00 57,948.80 190.00 60,496.00
701-01-I cross drain pipe (24" rcp/pcp) 1,078      LNFT 68.25 73,573.50 57.00 61,446.00 80.00 86,240.00 60.00 64,680.00
701-01-I-01 cross drain pipe (24" rcp) 152      LNFT 68.25 10,374.00 60.00 9,120.00 80.00 12,160.00 60.00 9,120.00
701-01-K cross drain pipe (30" rcp) 380      LNFT 84.00 31,920.00 95.00 36,100.00 105.00 39,900.00 95.00 36,100.00
701-01-M cross drain pipe (36" rcp/pcp) 456      LNFT 102.90 46,922.40 100.00 45,600.00 140.00 63,840.00 100.00 45,600.00
701-01-O cross drain pipe (48" rcp) 320      LNFT 152.25 48,720.00 170.00 54,400.00 215.00 68,800.00 170.00 54,400.00
701-01-P cross drain pipe (54" rcp) 512      LNFT 157.50 80,640.00 215.00 110,080.00 270.00 138,240.00 220.00 112,640.00
701-01-P-01 cross drain pipe (54" rcp)(class v) 544      LNFT 286.65 155,937.60 280.00 152,320.00 325.00 176,800.00 280.00 152,320.00
701-01-S cross drain pipe (72" rcp) 384      LNFT 304.50 116,928.00 380.00 145,920.00 445.00 170,880.00 380.00 145,920.00
701-01-S-01 cross drain pipe (72" rcp)(class v) 922      LNFT 462.00 425,964.00 430.00 396,460.00 550.00 507,100.00 430.00 396,460.00
701-05-G-01 side drain pipe (18")(erosion) 174      LNFT 33.60 5,846.40 50.00 8,700.00 45.00 7,830.00 55.00 9,570.00
702-03-A catch basins (cb-01) 8      EACH 3,858.75 30,870.00 1,800.00 14,400.00 3,500.00 28,000.00 2,200.00 17,600.00
702-03-B catch basins (cb-02) 4      EACH 4,410.00 17,640.00 2,500.00 10,000.00 3,750.00 15,000.00 3,000.00 12,000.00
704-03 blocked out guard rail 325.0    LNFT 18.90 6,142.50 18.00 5,850.00 18.27 5,937.75 20.00 6,500.00
704-08-B guard rail transitions (double thrie beam) 100.0    LNFT 57.75 5,775.00 55.00 5,500.00 55.84 5,584.00 60.00 6,000.00
704-11-A guard rail end treatment (flared) 4      EACH 1,995.00 7,980.00 1,900.00 7,600.00 1,928.94 7,715.76 2,000.00 8,000.00
705-02 combination mesh & barbed wire fence 30,662      LNFT 5.36 164,348.32 5.10 156,376.20 5.00 153,310.00 5.50 168,641.00
706-03-C incidental concrete paving (6" thick) 111.4    SQYD 131.25 14,621.25 60.00 6,684.00 125.00 13,925.00 90.00 10,026.00
708-01 right-of-way monument 57      EACH 126.00 7,182.00 120.00 6,840.00 200.00 11,400.00 150.00 8,550.00
708-02 right-of-way monument witness post 57      EACH 84.00 4,788.00 80.00 4,560.00 50.00 2,850.00 70.00 3,990.00
712-01-A concrete cast-in-place revetment (4" thick) 1,242      SQYD 68.25 84,766.50 75.00 93,150.00 45.00 55,890.00 65.00 80,730.00
712-02 sacked concrete revetment 102      SQYD 157.50 16,065.00 77.00 7,854.00 150.00 15,300.00 100.00 10,200.00
712-04 flexible revetment 312      SQYD 78.75 24,570.00 77.00 24,024.00 75.00 23,400.00 90.00 28,080.00
713-01 temporary signs & barricades lump      LUMP 9,450.00 9,450.00 65,000.00 65,000.00 25,000.00 25,000.00 80,000.00 80,000.00
716-01-A mulch (vegetative) 149.2    TON 441.00 65,797.20 500.00 74,600.00 420.00 62,664.00 440.00 65,648.00
717-01 seeding 8,952      LB 8.40 75,196.80 10.00 89,520.00 8.00 71,616.00 8.50 76,092.00
718-01 fertilizer 149,230      LB 0.34 50,738.20 0.65 96,999.50 0.32 47,753.60 0.34 50,738.20
718-02 agricultural lime 140.0    TON 84.00 11,760.00 125.00 17,500.00 80.00 11,200.00 90.00 12,600.00
720-01-A erosion control system, slope protection (type a) 25,275      SQYD 1.31 33,110.25 2.00 50,550.00 1.25 31,593.75 1.40 35,385.00
720-01-C erosion control system, flexible channel liner (type c) 2,600      SQYD 1.79 4,654.00 2.00 5,200.00 1.70 4,420.00 1.80 4,680.00
720-01-D erosion control system, flexible channel liner (type d) 13,358      SQYD 1.79 23,910.82 2.00 26,716.00 1.70 22,708.60 1.80 24,044.40
720-01-E erosion control system, flexible channel liner (type e) 934      SQYD 2.73 2,549.82 3.00 2,802.00 2.60 2,428.40 2.70 2,521.80
720-01-F erosion control system, flexible channel liner (type f) 1,712      SQYD 2.73 4,673.76 5.00 8,560.00 2.60 4,451.20 2.70 4,622.40
722-02 project site laboratory (equipped) 1      EACH 32,904.69 32,904.69 40,000.00 40,000.00 20,000.00 20,000.00 30,000.00 30,000.00
725-01 temporary detour roads 7,482.8    SQYD 49.63 371,371.36 55.00 411,554.00 55.00 411,554.00 45.00 336,726.00
726-01 bedding material 1,255.2    CUYD 88.20 110,708.64 78.00 97,905.60 110.00 138,072.00 70.00 87,864.00
727-01 mobilization lump      LUMP 1,900,000.00 1,900,000.00 1,516,000.00 1,516,000.00 1,800,000.00 1,800,000.00 1,900,000.00 1,900,000.00
729-16-B object marker assembly (type 2) 26      EACH 63.00 1,638.00 60.00 1,560.00 60.00 1,560.00 60.00 1,560.00
729-16-C object marker assembly (type 3) 4      EACH 75.60 302.40 72.00 288.00 75.00 300.00 75.00 300.00
731-01 nonreflectorized raised pavement markers 220      EACH 15.75 3,465.00 12.00 2,640.00 15.00 3,300.00 15.00 3,300.00
731-02 reflectorized raised pavement markers 842      EACH 5.25 4,420.50 7.00 5,894.00 5.10 4,294.20 5.00 4,210.00
732-02-A plastic pavement striping (solid line) (4" width) 12.319  MILE 2,205.00 27,163.40 2,500.00 30,797.50 2,690.00 33,138.11 2,200.00 27,101.80
740-01 construction layout lump      LUMP 221,382.18 221,382.18 400,000.00 400,000.00 100,000.00 100,000.00 300,000.00 300,000.00
805-03 class aa concrete 14.18   CUYD 735.00 10,422.30 775.00 10,989.50 375.00 5,317.50 700.00 9,926.00
805-04 class aa(m) concrete 700.28   CUYD 630.00 441,176.40 550.00 385,154.00 565.00 395,658.20 600.00 420,168.00
805-08-G precast-prestressed concrete girders (type bt-72) 2,439.4    LNFT 231.00 563,501.40 185.00 451,289.00 185.00 451,289.00 220.00 536,668.00
805-11 strip seal joints 129.44   LNFT 168.00 21,745.92 170.00 22,004.80 175.00 22,652.00 160.00 20,710.40
806-02 deformed reinforcing steel (epoxy coated) 112,216      LB 1.47 164,957.52 1.60 179,545.60 1.25 140,270.00 1.40 157,102.40
807-08 structural metalwork lump      LUMP 7,875.00 7,875.00 7,500.00 7,500.00 10,000.00 10,000.00 7,500.00 7,500.00
810-01 concrete railing (barrier) 1,106.00   LNFT 68.25 75,484.50 70.00 77,420.00 60.00 66,360.00 65.00 71,890.00
813-01 concrete approach slabs 355.56   SQYD 215.25 76,534.29 270.00 96,001.20 220.00 78,223.20 205.00 72,889.80
 SUBTOTAL GENERAL       14,468,485.68   14,307,538.08   15,212,334.47   15,369,278.90
                       
ALTERNATE A alternate pavement types                    
                       
ALTERNATE A1 portland cement concrete pavement                    
601-01-M portland cement concrete pavement (11" thick) 85,499.6    SQYD 47.73 4,080,895.91 50.00 4,274,980.00 43.00 3,676,482.80 45.00 3,847,482.00
601-04 portland cement concrete pavement coring 21      EACH 121.97 2,561.37 120.00 2,520.00 90.00 1,890.00 115.00 2,415.00
732-03-A-01 plastic pvmt striping (broken line)(4"width)preformed
marking tape (type v)
5.397  MILE 3,675.00 19,833.98 5,500.00 29,683.50 3,950.00 21,318.15 3,600.00 19,429.20
 SUBTOTAL ALT A1       4,103,291.26   4,307,183.50   3,699,690.95   3,869,326.20
                       
ALTERNATE A2 superpave asphaltic concrete pavement                    
502-01-01 superpave asphaltic concrete (alternate a2) 51,727.4    TON 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
732-03-A plastic pavement striping (broken line)(4" width) 5.397  MILE 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
S-001 rumble strips (ground-in) 11.3    MILE 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
                       
ALTERNATE D bridge foundation alternates                    
                       
ALTERNATE D1 pile foundation                    
802-02 structural excavation for intermediate bents 387.0    CUYD 23.10 8,939.70 20.00 7,740.00 15.00 5,805.00 22.00 8,514.00
804-01-B precast concrete piles (14") 80      LNFT 183.75 14,700.00 80.00 6,400.00 78.00 6,240.00 175.00 14,000.00
804-01-D precast concrete piles (18") 2,430      LNFT 80.85 196,465.50 67.00 162,810.00 56.00 136,080.00 77.00 187,110.00
804-01-F precast concrete piles (24") 576      LNFT 178.50 102,816.00 100.00 57,600.00 128.00 73,728.00 170.00 97,920.00
804-05 precast concrete test piles 1      EACH 23,100.00 23,100.00 20,000.00 20,000.00 5,000.00 5,000.00 22,000.00 22,000.00
804-09 loading test piles 1      EACH 18,900.00 18,900.00 30,000.00 30,000.00 35,200.00 35,200.00 18,000.00 18,000.00
804-10 reloading test piles 1      EACH 1,050.00 1,050.00 3,000.00 3,000.00 4,750.00 4,750.00 1,000.00 1,000.00
804-11 redriving test piles 1      EACH 1,050.00 1,050.00 6,000.00 6,000.00 2,000.00 2,000.00 1,000.00 1,000.00
804-12 loading permanent piles 1      EACH 1,050.00 1,050.00 30,000.00 30,000.00 8,700.00 8,700.00 1,000.00 1,000.00
804-17 dynamic monitoring 33      EACH 1,260.00 41,580.00 1,500.00 49,500.00 525.00 17,325.00 1,200.00 39,600.00
805-01-D class a concrete (footings) 138.78   CUYD 378.00 52,458.84 450.00 62,451.00 235.00 32,613.30 360.00 49,960.80
805-01-F class a concrete (bents) 317.45   CUYD 708.75 224,992.69 550.00 174,597.50 550.00 174,597.50 675.00 214,278.75
806-01 deformed reinforcing steel 97,320      LB 1.26 122,623.20 1.35 131,382.00 0.95 92,454.00 1.20 116,784.00
S-101 dynamic analysis 33      EACH 1,470.00 48,510.00 1,500.00 49,500.00 410.00 13,530.00 1,400.00 46,200.00
 SUBTOTAL ALT D1       858,235.93   790,980.50   608,022.80   817,367.55
                       
ALTERNATE D2 drilled shaft foundation                    
805-01-F class a concrete (bents) 350.01   CUYD 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
806-01 deformed reinforcing steel 79,991      LB 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
814-01-B drilled shaft (24") 100.0    LNFT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
814-01-J drilled shaft (66") 765.0    LNFT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
814-02-J trial shaft (66") 45.0    LNFT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
814-04-B crosshole sonic logging (24") 4      EACH 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
814-04-J crosshole sonic logging (66") 15      EACH 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
S-102 test drilled shaft (66") 1      EACH 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
S-103 load testing a drilled shaft 1      EACH 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
                       
 ITEM TOTAL (CONSTRUCTION BID)       19,430,012.87   19,405,702.08   19,520,048.22   20,055,972.65
 NUMBER OF DAYS BID AT $1,000 PER DAY.       450,000.00   500,000.00   650,000.00   540,000.00
 LIFE CYCLE COST       565,000.00   565,000.00   565,000.00   565,000.00
 TOTAL BID       20,445,012.87   20,470,702.08   20,735,048.22   21,160,972.65
 
Item Number Item Description Quantity Unit of Measure - 5 -
AUSTIN BRIDGE & ROAD, LP
- 6 -
SPECIALTY CONTRACTORS
- 7 -
GILCHRIST CONSTRUCTION CO. LLC

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
201-01 clearing & grubbing lump      LUMP 600,000.00 600,000.00 1,200,000.00 1,200,000.00 950,000.00 950,000.00    
202-01 removal of structures & obstructions lump      LUMP 15,000.00 15,000.00 20,000.00 20,000.00 30,000.00 30,000.00    
202-02-B removal of concrete box culvert (sta. 47+920; 3' x 3'
x 76')
1      EACH 1,000.00 1,000.00 3,000.00 3,000.00 3,000.00 3,000.00    
202-02-C removal of portland cement concrete pavement 4,862      SQYD 8.00 38,896.00 5.00 24,310.00 7.50 36,465.00    
202-02-G removal of surfacing & stabilized base 3,241.2    SQYD 1.60 5,185.92 4.00 12,964.80 5.25 17,016.30    
202-02-H removal of guard rail 1,370      LNFT 4.00 5,480.00 5.00 6,850.00 10.00 13,700.00    
202-02-01 removal of wood barn (lt. of sta. 1508+73; 15' x 10') 1      EACH 750.00 750.00 500.00 500.00 2,000.00 2,000.00    
202-02-02 removal of wood frame house (lt. of sta. 1549+99;
1665 sq. ft.)
1      EACH 1,500.00 1,500.00 5,000.00 5,000.00 4,500.00 4,500.00    
202-02-03 removal of wood barn (lt. of sta. 1551+00; 270 sq. ft.) 1      EACH 750.00 750.00 1,000.00 1,000.00 1,500.00 1,500.00    
202-02-04 removal of metal shed (lt. of sta. 1552+01; 80 sq. ft.) 1      EACH 750.00 750.00 500.00 500.00 900.00 900.00    
202-02-05 removal of metal oilwell (no tanks) with utility pole
(rt. of sta. 1522+00)
1      EACH 6,000.00 6,000.00 2,000.00 2,000.00 5,000.00 5,000.00    
203-01 general excavation 1,079,556      CUYD 1.90 2,051,156.40 1.50 1,619,334.00 2.15 2,321,045.40    
203-03 embankment 1,076,158      CUYD 1.84 1,980,130.72 2.88 3,099,335.04 3.50 3,766,553.00    
203-04 nonplastic embankment (stone) 2,161      CUYD 95.00 205,295.00 82.00 177,202.00 155.00 334,955.00    
204-02 temporary hay or straw bales 84      EACH 8.00 672.00 10.00 840.00 30.00 2,520.00    
204-03 temporary slope drains 2,035      LNFT 14.50 29,507.50 15.00 30,525.00 22.00 44,770.00    
204-05-A temporary sediment check dams (hay) 48      EACH 95.00 4,560.00 400.00 19,200.00 350.00 16,800.00    
204-05-B temporary sediment check dams (stone) 25      EACH 450.00 11,250.00 600.00 15,000.00 1,100.00 27,500.00    
204-06 temporary silt fencing 10,400      LNFT 2.10 21,840.00 2.00 20,800.00 2.00 20,800.00    
204-07 temporary stone construction entrance 2      EACH 10,000.00 20,000.00 2,300.00 4,600.00 3,000.00 6,000.00    
302-01 class ii base course 17,205.2    CUYD 76.00 1,307,595.20 80.00 1,376,416.00 95.00 1,634,494.00    
302-02-B-01 class ii base course (6" thick) (soil cement) 120,332.8    SQYD 6.20 746,063.36 8.00 962,662.40 8.20 986,728.96    
305-01-D subgrade layer (12" thick) 120,333      SQYD 7.80 938,597.40 6.76 813,451.08 8.00 962,664.00    
502-01 superpave asphaltic concrete 12,913.3    TON 83.00 1,071,803.90 83.00 1,071,803.90 100.00 1,291,330.00    
502-01-A superpave asphaltic concrete, drives, turnouts and
miscellaneous
318.4    TON 182.50 58,108.00 183.00 58,267.20 125.00 39,800.00    
701-01-I cross drain pipe (24" rcp/pcp) 1,078      LNFT 57.69 62,189.82 80.00 86,240.00 73.00 78,694.00    
701-01-I-01 cross drain pipe (24" rcp) 152      LNFT 60.73 9,230.96 80.00 12,160.00 100.00 15,200.00    
701-01-K cross drain pipe (30" rcp) 380      LNFT 96.16 36,540.80 110.00 41,800.00 110.00 41,800.00    
701-01-M cross drain pipe (36" rcp/pcp) 456      LNFT 101.22 46,156.32 163.00 74,328.00 135.00 61,560.00    
701-01-O cross drain pipe (48" rcp) 320      LNFT 172.07 55,062.40 221.00 70,720.00 210.00 67,200.00    
701-01-P cross drain pipe (54" rcp) 512      LNFT 217.62 111,421.44 328.00 167,936.00 260.00 133,120.00    
701-01-P-01 cross drain pipe (54" rcp)(class v) 544      LNFT 283.41 154,175.04 378.00 205,632.00 350.00 190,400.00    
701-01-S cross drain pipe (72" rcp) 384      LNFT 384.63 147,697.92 490.00 188,160.00 450.00 172,800.00    
701-01-S-01 cross drain pipe (72" rcp)(class v) 922      LNFT 435.24 401,291.28 580.00 534,760.00 520.00 479,440.00    
701-05-G-01 side drain pipe (18")(erosion) 174      LNFT 50.61 8,806.14 45.00 7,830.00 70.00 12,180.00    
702-03-A catch basins (cb-01) 8      EACH 1,821.92 14,575.36 2,500.00 20,000.00 2,000.00 16,000.00    
702-03-B catch basins (cb-02) 4      EACH 2,530.44 10,121.76 3,700.00 14,800.00 2,800.00 11,200.00    
704-03 blocked out guard rail 325.0    LNFT 20.00 6,500.00 18.00 5,850.00 20.00 6,500.00    
704-08-B guard rail transitions (double thrie beam) 100.0    LNFT 45.00 4,500.00 55.00 5,500.00 62.00 6,200.00    
704-11-A guard rail end treatment (flared) 4      EACH 1,900.00 7,600.00 1,900.00 7,600.00 2,000.00 8,000.00    
705-02 combination mesh & barbed wire fence 30,662      LNFT 6.45 197,769.90 8.00 245,296.00 5.90 180,905.80    
706-03-C incidental concrete paving (6" thick) 111.4    SQYD 125.00 13,925.00 42.00 4,678.80 100.00 11,140.00    
708-01 right-of-way monument 57      EACH 120.00 6,840.00 200.00 11,400.00 340.00 19,380.00    
708-02 right-of-way monument witness post 57      EACH 80.00 4,560.00 100.00 5,700.00 340.00 19,380.00    
712-01-A concrete cast-in-place revetment (4" thick) 1,242      SQYD 75.00 93,150.00 75.00 93,150.00 115.00 142,830.00    
712-02 sacked concrete revetment 102      SQYD 150.00 15,300.00 200.00 20,400.00 100.00 10,200.00    
712-04 flexible revetment 312      SQYD 75.00 23,400.00 75.00 23,400.00 95.00 29,640.00    
713-01 temporary signs & barricades lump      LUMP 55,000.00 55,000.00 25,000.00 25,000.00 200,000.00 200,000.00    
716-01-A mulch (vegetative) 149.2    TON 500.00 74,600.00 1,000.00 149,200.00 500.00 74,600.00    
717-01 seeding 8,952      LB 8.00 71,616.00 8.00 71,616.00 10.00 89,520.00    
718-01 fertilizer 149,230      LB 0.60 89,538.00 0.80 119,384.00 0.40 59,692.00    
718-02 agricultural lime 140.0    TON 100.00 14,000.00 150.00 21,000.00 92.00 12,880.00    
720-01-A erosion control system, slope protection (type a) 25,275      SQYD 1.10 27,802.50 2.00 50,550.00 1.40 35,385.00    
720-01-C erosion control system, flexible channel liner (type c) 2,600      SQYD 1.20 3,120.00 2.00 5,200.00 1.90 4,940.00    
720-01-D erosion control system, flexible channel liner (type d) 13,358      SQYD 1.20 16,029.60 2.00 26,716.00 1.90 25,380.20    
720-01-E erosion control system, flexible channel liner (type e) 934      SQYD 2.50 2,335.00 2.00 1,868.00 2.90 2,708.60    
720-01-F erosion control system, flexible channel liner (type f) 1,712      SQYD 2.50 4,280.00 2.00 3,424.00 2.90 4,964.80    
722-02 project site laboratory (equipped) 1      EACH 20,000.00 20,000.00 30,000.00 30,000.00 75,000.00 75,000.00    
725-01 temporary detour roads 7,482.8    SQYD 130.00 972,764.00 37.00 276,863.60 60.00 448,968.00    
726-01 bedding material 1,255.2    CUYD 79.00 99,160.80 80.00 100,416.00 85.00 106,692.00    
727-01 mobilization lump      LUMP 1,750,000.00 1,750,000.00 873,000.00 873,000.00 2,300,000.00 2,300,000.00    
729-16-B object marker assembly (type 2) 26      EACH 60.00 1,560.00 60.00 1,560.00 65.00 1,690.00    
729-16-C object marker assembly (type 3) 4      EACH 80.00 320.00 72.00 288.00 80.00 320.00    
731-01 nonreflectorized raised pavement markers 220      EACH 15.00 3,300.00 15.00 3,300.00 17.00 3,740.00    
731-02 reflectorized raised pavement markers 842      EACH 5.10 4,294.20 5.10 4,294.20 5.50 4,631.00    
732-02-A plastic pavement striping (solid line) (4" width) 12.319  MILE 2,690.22 33,140.82 2,690.00 33,138.11 2,400.00 29,565.60    
740-01 construction layout lump      LUMP 400,000.00 400,000.00 300,000.00 300,000.00 400,000.00 400,000.00    
805-03 class aa concrete 14.18   CUYD 1,200.00 17,016.00 775.00 10,989.50 1,200.00 17,016.00    
805-04 class aa(m) concrete 700.28   CUYD 750.00 525,210.00 550.00 385,154.00 800.00 560,224.00    
805-08-G precast-prestressed concrete girders (type bt-72) 2,439.4    LNFT 220.00 536,668.00 185.00 451,289.00 200.00 487,880.00    
805-11 strip seal joints 129.44   LNFT 300.00 38,832.00 170.00 22,004.80 190.00 24,593.60    
806-02 deformed reinforcing steel (epoxy coated) 112,216      LB 1.10 123,437.60 1.60 179,545.60 1.25 140,270.00    
807-08 structural metalwork lump      LUMP 15,000.00 15,000.00 7,500.00 7,500.00 20,000.00 20,000.00    
810-01 concrete railing (barrier) 1,106.00   LNFT 75.00 82,950.00 70.00 77,420.00 85.00 94,010.00    
813-01 concrete approach slabs 355.56   SQYD 300.00 106,668.00 270.00 96,001.20 225.00 80,001.00    
 SUBTOTAL GENERAL       15,641,348.06   15,719,624.23   19,538,483.26    
                       
ALTERNATE A alternate pavement types                    
                       
ALTERNATE A1 portland cement concrete pavement                    
601-01-M portland cement concrete pavement (11" thick) 85,499.6    SQYD 42.00 3,590,983.20 0.00 0.00 48.50 4,146,730.60    
601-04 portland cement concrete pavement coring 21      EACH 108.00 2,268.00 0.00 0.00 115.00 2,415.00    
732-03-A-01 plastic pvmt striping (broken line)(4"width)preformed
marking tape (type v)
5.397  MILE 3,945.00 21,291.17 0.00 0.00 4,000.00 21,588.00    
 SUBTOTAL ALT A1       3,614,542.37       4,170,733.60    
                       
ALTERNATE A2 superpave asphaltic concrete pavement                    
502-01-01 superpave asphaltic concrete (alternate a2) 51,727.4    TON 0.00 0.00 74.12 3,834,034.89 0.00 0.00    
732-03-A plastic pavement striping (broken line)(4" width) 5.397  MILE 0.00 0.00 690.00 3,723.93 0.00 0.00    
S-001 rumble strips (ground-in) 11.3    MILE 0.00 0.00 600.00 6,780.00 0.00 0.00    
 SUBTOTAL ALT A2           3,844,538.82        
                       
ALTERNATE D bridge foundation alternates                    
                       
ALTERNATE D1 pile foundation                    
802-02 structural excavation for intermediate bents 387.0    CUYD 40.00 15,480.00 20.00 7,740.00 25.00 9,675.00    
804-01-B precast concrete piles (14") 80      LNFT 175.00 14,000.00 88.00 7,040.00 140.00 11,200.00    
804-01-D precast concrete piles (18") 2,430      LNFT 125.00 303,750.00 67.00 162,810.00 60.00 145,800.00    
804-01-F precast concrete piles (24") 576      LNFT 190.00 109,440.00 100.00 57,600.00 120.00 69,120.00    
804-05 precast concrete test piles 1      EACH 15,000.00 15,000.00 20,000.00 20,000.00 20,000.00 20,000.00    
804-09 loading test piles 1      EACH 25,000.00 25,000.00 30,000.00 30,000.00 20,000.00 20,000.00    
804-10 reloading test piles 1      EACH 6,000.00 6,000.00 3,000.00 3,000.00 1,000.00 1,000.00    
804-11 redriving test piles 1      EACH 5,000.00 5,000.00 6,000.00 6,000.00 1,000.00 1,000.00    
804-12 loading permanent piles 1      EACH 15,000.00 15,000.00 30,000.00 30,000.00 100.00 100.00    
804-17 dynamic monitoring 33      EACH 1,600.00 52,800.00 1,500.00 49,500.00 2,000.00 66,000.00    
805-01-D class a concrete (footings) 138.78   CUYD 1,000.00 138,780.00 450.00 62,451.00 300.00 41,634.00    
805-01-F class a concrete (bents) 317.45   CUYD 800.00 253,960.00 550.00 174,597.50 600.00 190,470.00    
806-01 deformed reinforcing steel 97,320      LB 1.05 102,186.00 1.35 131,382.00 1.15 111,918.00    
S-101 dynamic analysis 33      EACH 1,200.00 39,600.00 1,500.00 49,500.00 2,000.00 66,000.00    
 SUBTOTAL ALT D1       1,095,996.00   791,620.50   753,917.00    
                       
ALTERNATE D2 drilled shaft foundation                    
805-01-F class a concrete (bents) 350.01   CUYD 0.00 0.00 0.00 0.00 0.00 0.00    
806-01 deformed reinforcing steel 79,991      LB 0.00 0.00 0.00 0.00 0.00 0.00    
814-01-B drilled shaft (24") 100.0    LNFT 0.00 0.00 0.00 0.00 0.00 0.00    
814-01-J drilled shaft (66") 765.0    LNFT 0.00 0.00 0.00 0.00 0.00 0.00    
814-02-J trial shaft (66") 45.0    LNFT 0.00 0.00 0.00 0.00 0.00 0.00    
814-04-B crosshole sonic logging (24") 4      EACH 0.00 0.00 0.00 0.00 0.00 0.00    
814-04-J crosshole sonic logging (66") 15      EACH 0.00 0.00 0.00 0.00 0.00 0.00    
S-102 test drilled shaft (66") 1      EACH 0.00 0.00 0.00 0.00 0.00 0.00    
S-103 load testing a drilled shaft 1      EACH 0.00 0.00 0.00 0.00 0.00 0.00    
                       
 ITEM TOTAL (CONSTRUCTION BID)       20,351,886.43   20,355,783.55   24,463,133.86    
 NUMBER OF DAYS BID AT $1,000 PER DAY.       600,000.00   700,000.00   700,000.00    
 LIFE CYCLE COST       565,000.00   1,678,000.00   565,000.00    
 TOTAL BID       21,516,886.43   22,734,583.55   25,728,133.86    