| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - T.J. LAMBRECHT CONSTRUCTION, INC. |
- 2 - EUTAW CONSTRUCTION CO. INC. |
- 3 - JAMES CONSTRUCTION GROUP LLC |
- 4 - DENTON-JAMES LLC |
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 201-01 |
clearing & grubbing
|
lump |
LUMP |
229,950.00 |
229,950.00 |
500,000.00 |
500,000.00 |
750,000.00 |
750,000.00 |
750,000.00 |
750,000.00 |
| 202-01 |
removal of structures & obstructions
|
lump |
LUMP |
12,129.53 |
12,129.53 |
15,000.00 |
15,000.00 |
40,000.00 |
40,000.00 |
30,000.00 |
30,000.00 |
| 202-02-B |
removal of concrete box culvert (sta. 47+920; 3' x 3'
x 76') |
1   |
EACH |
1,046.35 |
1,046.35 |
1,370.00 |
1,370.00 |
10,000.00 |
10,000.00 |
8,000.00 |
8,000.00 |
| 202-02-C |
removal of portland cement concrete pavement
|
4,862   |
SQYD |
7.72 |
37,534.64 |
5.00 |
24,310.00 |
7.00 |
34,034.00 |
7.00 |
34,034.00 |
| 202-02-G |
removal of surfacing & stabilized base
|
3,241.2 |
SQYD |
1.54 |
4,991.45 |
1.65 |
5,347.98 |
4.00 |
12,964.80 |
4.00 |
12,964.80 |
| 202-02-H |
removal of guard rail
|
1,370   |
LNFT |
3.68 |
5,041.60 |
2.60 |
3,562.00 |
7.00 |
9,590.00 |
4.00 |
5,480.00 |
| 202-02-01 |
removal of wood barn (lt. of sta. 1508+73; 15' x 10')
|
1   |
EACH |
550.54 |
550.54 |
295.00 |
295.00 |
250.00 |
250.00 |
1.00 |
1.00 |
| 202-02-02 |
removal of wood frame house (lt. of sta. 1549+99;
1665 sq. ft.) |
1   |
EACH |
1,101.11 |
1,101.11 |
2,395.00 |
2,395.00 |
1,500.00 |
1,500.00 |
1.00 |
1.00 |
| 202-02-03 |
removal of wood barn (lt. of sta. 1551+00; 270 sq. ft.)
|
1   |
EACH |
550.54 |
550.54 |
295.00 |
295.00 |
250.00 |
250.00 |
1.00 |
1.00 |
| 202-02-04 |
removal of metal shed (lt. of sta. 1552+01; 80 sq. ft.)
|
1   |
EACH |
550.54 |
550.54 |
235.00 |
235.00 |
1,500.00 |
1,500.00 |
1.00 |
1.00 |
| 202-02-05 |
removal of metal oilwell (no tanks) with utility pole
(rt. of sta. 1522+00) |
1   |
EACH |
84,000.00 |
84,000.00 |
35,000.00 |
35,000.00 |
7,000.00 |
7,000.00 |
1.00 |
1.00 |
| 203-01 |
general excavation
|
1,079,556   |
CUYD |
1.79 |
1,932,405.24 |
1.90 |
2,051,156.40 |
2.00 |
2,159,112.00 |
2.10 |
2,267,067.60 |
| 203-03 |
embankment
|
1,076,158   |
CUYD |
1.64 |
1,764,899.12 |
1.50 |
1,614,237.00 |
2.00 |
2,152,316.00 |
1.90 |
2,044,700.20 |
| 203-04 |
nonplastic embankment (stone)
|
2,161   |
CUYD |
96.46 |
208,450.06 |
109.00 |
235,549.00 |
85.00 |
183,685.00 |
110.00 |
237,710.00 |
| 204-02 |
temporary hay or straw bales
|
84   |
EACH |
10.50 |
882.00 |
15.00 |
1,260.00 |
100.00 |
8,400.00 |
10.00 |
840.00 |
| 204-03 |
temporary slope drains
|
2,035   |
LNFT |
18.54 |
37,728.90 |
9.00 |
18,315.00 |
10.00 |
20,350.00 |
15.00 |
30,525.00 |
| 204-05-A |
temporary sediment check dams (hay)
|
48   |
EACH |
126.00 |
6,048.00 |
200.00 |
9,600.00 |
145.00 |
6,960.00 |
120.00 |
5,760.00 |
| 204-05-B |
temporary sediment check dams (stone)
|
25   |
EACH |
551.25 |
13,781.25 |
490.00 |
12,250.00 |
500.00 |
12,500.00 |
700.00 |
17,500.00 |
| 204-06 |
temporary silt fencing
|
10,400   |
LNFT |
1.58 |
16,432.00 |
2.00 |
20,800.00 |
2.50 |
26,000.00 |
2.00 |
20,800.00 |
| 204-07 |
temporary stone construction entrance
|
2   |
EACH |
4,009.97 |
8,019.94 |
3,250.00 |
6,500.00 |
5,700.00 |
11,400.00 |
2,500.00 |
5,000.00 |
| 302-01 |
class ii base course
|
17,205.2 |
CUYD |
84.21 |
1,448,849.89 |
87.50 |
1,505,455.00 |
75.00 |
1,290,390.00 |
75.00 |
1,290,390.00 |
| 302-02-B-01 |
class ii base course (6" thick) (soil cement)
|
120,332.8 |
SQYD |
6.76 |
813,449.73 |
5.00 |
601,664.00 |
7.00 |
842,329.60 |
6.50 |
782,163.20 |
| 305-01-D |
subgrade layer (12" thick)
|
120,333   |
SQYD |
7.89 |
949,427.37 |
8.00 |
962,664.00 |
7.75 |
932,580.75 |
8.00 |
962,664.00 |
| 502-01 |
superpave asphaltic concrete
|
12,913.3 |
TON |
87.56 |
1,130,688.55 |
84.00 |
1,084,717.20 |
82.50 |
1,065,347.25 |
83.00 |
1,071,803.90 |
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
318.4 |
TON |
193.18 |
61,508.51 |
184.00 |
58,585.60 |
182.00 |
57,948.80 |
190.00 |
60,496.00 |
| 701-01-I |
cross drain pipe (24" rcp/pcp)
|
1,078   |
LNFT |
68.25 |
73,573.50 |
57.00 |
61,446.00 |
80.00 |
86,240.00 |
60.00 |
64,680.00 |
| 701-01-I-01 |
cross drain pipe (24" rcp)
|
152   |
LNFT |
68.25 |
10,374.00 |
60.00 |
9,120.00 |
80.00 |
12,160.00 |
60.00 |
9,120.00 |
| 701-01-K |
cross drain pipe (30" rcp)
|
380   |
LNFT |
84.00 |
31,920.00 |
95.00 |
36,100.00 |
105.00 |
39,900.00 |
95.00 |
36,100.00 |
| 701-01-M |
cross drain pipe (36" rcp/pcp)
|
456   |
LNFT |
102.90 |
46,922.40 |
100.00 |
45,600.00 |
140.00 |
63,840.00 |
100.00 |
45,600.00 |
| 701-01-O |
cross drain pipe (48" rcp)
|
320   |
LNFT |
152.25 |
48,720.00 |
170.00 |
54,400.00 |
215.00 |
68,800.00 |
170.00 |
54,400.00 |
| 701-01-P |
cross drain pipe (54" rcp)
|
512   |
LNFT |
157.50 |
80,640.00 |
215.00 |
110,080.00 |
270.00 |
138,240.00 |
220.00 |
112,640.00 |
| 701-01-P-01 |
cross drain pipe (54" rcp)(class v)
|
544   |
LNFT |
286.65 |
155,937.60 |
280.00 |
152,320.00 |
325.00 |
176,800.00 |
280.00 |
152,320.00 |
| 701-01-S |
cross drain pipe (72" rcp)
|
384   |
LNFT |
304.50 |
116,928.00 |
380.00 |
145,920.00 |
445.00 |
170,880.00 |
380.00 |
145,920.00 |
| 701-01-S-01 |
cross drain pipe (72" rcp)(class v)
|
922   |
LNFT |
462.00 |
425,964.00 |
430.00 |
396,460.00 |
550.00 |
507,100.00 |
430.00 |
396,460.00 |
| 701-05-G-01 |
side drain pipe (18")(erosion)
|
174   |
LNFT |
33.60 |
5,846.40 |
50.00 |
8,700.00 |
45.00 |
7,830.00 |
55.00 |
9,570.00 |
| 702-03-A |
catch basins (cb-01)
|
8   |
EACH |
3,858.75 |
30,870.00 |
1,800.00 |
14,400.00 |
3,500.00 |
28,000.00 |
2,200.00 |
17,600.00 |
| 702-03-B |
catch basins (cb-02)
|
4   |
EACH |
4,410.00 |
17,640.00 |
2,500.00 |
10,000.00 |
3,750.00 |
15,000.00 |
3,000.00 |
12,000.00 |
| 704-03 |
blocked out guard rail
|
325.0 |
LNFT |
18.90 |
6,142.50 |
18.00 |
5,850.00 |
18.27 |
5,937.75 |
20.00 |
6,500.00 |
| 704-08-B |
guard rail transitions (double thrie beam)
|
100.0 |
LNFT |
57.75 |
5,775.00 |
55.00 |
5,500.00 |
55.84 |
5,584.00 |
60.00 |
6,000.00 |
| 704-11-A |
guard rail end treatment (flared)
|
4   |
EACH |
1,995.00 |
7,980.00 |
1,900.00 |
7,600.00 |
1,928.94 |
7,715.76 |
2,000.00 |
8,000.00 |
| 705-02 |
combination mesh & barbed wire fence
|
30,662   |
LNFT |
5.36 |
164,348.32 |
5.10 |
156,376.20 |
5.00 |
153,310.00 |
5.50 |
168,641.00 |
| 706-03-C |
incidental concrete paving (6" thick)
|
111.4 |
SQYD |
131.25 |
14,621.25 |
60.00 |
6,684.00 |
125.00 |
13,925.00 |
90.00 |
10,026.00 |
| 708-01 |
right-of-way monument
|
57   |
EACH |
126.00 |
7,182.00 |
120.00 |
6,840.00 |
200.00 |
11,400.00 |
150.00 |
8,550.00 |
| 708-02 |
right-of-way monument witness post
|
57   |
EACH |
84.00 |
4,788.00 |
80.00 |
4,560.00 |
50.00 |
2,850.00 |
70.00 |
3,990.00 |
| 712-01-A |
concrete cast-in-place revetment (4" thick)
|
1,242   |
SQYD |
68.25 |
84,766.50 |
75.00 |
93,150.00 |
45.00 |
55,890.00 |
65.00 |
80,730.00 |
| 712-02 |
sacked concrete revetment
|
102   |
SQYD |
157.50 |
16,065.00 |
77.00 |
7,854.00 |
150.00 |
15,300.00 |
100.00 |
10,200.00 |
| 712-04 |
flexible revetment
|
312   |
SQYD |
78.75 |
24,570.00 |
77.00 |
24,024.00 |
75.00 |
23,400.00 |
90.00 |
28,080.00 |
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
9,450.00 |
9,450.00 |
65,000.00 |
65,000.00 |
25,000.00 |
25,000.00 |
80,000.00 |
80,000.00 |
| 716-01-A |
mulch (vegetative)
|
149.2 |
TON |
441.00 |
65,797.20 |
500.00 |
74,600.00 |
420.00 |
62,664.00 |
440.00 |
65,648.00 |
| 717-01 |
seeding
|
8,952   |
LB |
8.40 |
75,196.80 |
10.00 |
89,520.00 |
8.00 |
71,616.00 |
8.50 |
76,092.00 |
| 718-01 |
fertilizer
|
149,230   |
LB |
0.34 |
50,738.20 |
0.65 |
96,999.50 |
0.32 |
47,753.60 |
0.34 |
50,738.20 |
| 718-02 |
agricultural lime
|
140.0 |
TON |
84.00 |
11,760.00 |
125.00 |
17,500.00 |
80.00 |
11,200.00 |
90.00 |
12,600.00 |
| 720-01-A |
erosion control system, slope protection (type a)
|
25,275   |
SQYD |
1.31 |
33,110.25 |
2.00 |
50,550.00 |
1.25 |
31,593.75 |
1.40 |
35,385.00 |
| 720-01-C |
erosion control system, flexible channel liner (type c)
|
2,600   |
SQYD |
1.79 |
4,654.00 |
2.00 |
5,200.00 |
1.70 |
4,420.00 |
1.80 |
4,680.00 |
| 720-01-D |
erosion control system, flexible channel liner (type d)
|
13,358   |
SQYD |
1.79 |
23,910.82 |
2.00 |
26,716.00 |
1.70 |
22,708.60 |
1.80 |
24,044.40 |
| 720-01-E |
erosion control system, flexible channel liner (type e)
|
934   |
SQYD |
2.73 |
2,549.82 |
3.00 |
2,802.00 |
2.60 |
2,428.40 |
2.70 |
2,521.80 |
| 720-01-F |
erosion control system, flexible channel liner (type f)
|
1,712   |
SQYD |
2.73 |
4,673.76 |
5.00 |
8,560.00 |
2.60 |
4,451.20 |
2.70 |
4,622.40 |
| 722-02 |
project site laboratory (equipped)
|
1   |
EACH |
32,904.69 |
32,904.69 |
40,000.00 |
40,000.00 |
20,000.00 |
20,000.00 |
30,000.00 |
30,000.00 |
| 725-01 |
temporary detour roads
|
7,482.8 |
SQYD |
49.63 |
371,371.36 |
55.00 |
411,554.00 |
55.00 |
411,554.00 |
45.00 |
336,726.00 |
| 726-01 |
bedding material
|
1,255.2 |
CUYD |
88.20 |
110,708.64 |
78.00 |
97,905.60 |
110.00 |
138,072.00 |
70.00 |
87,864.00 |
| 727-01 |
mobilization
|
lump |
LUMP |
1,900,000.00 |
1,900,000.00 |
1,516,000.00 |
1,516,000.00 |
1,800,000.00 |
1,800,000.00 |
1,900,000.00 |
1,900,000.00 |
| 729-16-B |
object marker assembly (type 2)
|
26   |
EACH |
63.00 |
1,638.00 |
60.00 |
1,560.00 |
60.00 |
1,560.00 |
60.00 |
1,560.00 |
| 729-16-C |
object marker assembly (type 3)
|
4   |
EACH |
75.60 |
302.40 |
72.00 |
288.00 |
75.00 |
300.00 |
75.00 |
300.00 |
| 731-01 |
nonreflectorized raised pavement markers
|
220   |
EACH |
15.75 |
3,465.00 |
12.00 |
2,640.00 |
15.00 |
3,300.00 |
15.00 |
3,300.00 |
| 731-02 |
reflectorized raised pavement markers
|
842   |
EACH |
5.25 |
4,420.50 |
7.00 |
5,894.00 |
5.10 |
4,294.20 |
5.00 |
4,210.00 |
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
12.319 |
MILE |
2,205.00 |
27,163.40 |
2,500.00 |
30,797.50 |
2,690.00 |
33,138.11 |
2,200.00 |
27,101.80 |
| 740-01 |
construction layout
|
lump |
LUMP |
221,382.18 |
221,382.18 |
400,000.00 |
400,000.00 |
100,000.00 |
100,000.00 |
300,000.00 |
300,000.00 |
| 805-03 |
class aa concrete
|
14.18 |
CUYD |
735.00 |
10,422.30 |
775.00 |
10,989.50 |
375.00 |
5,317.50 |
700.00 |
9,926.00 |
| 805-04 |
class aa(m) concrete
|
700.28 |
CUYD |
630.00 |
441,176.40 |
550.00 |
385,154.00 |
565.00 |
395,658.20 |
600.00 |
420,168.00 |
| 805-08-G |
precast-prestressed concrete girders (type bt-72)
|
2,439.4 |
LNFT |
231.00 |
563,501.40 |
185.00 |
451,289.00 |
185.00 |
451,289.00 |
220.00 |
536,668.00 |
| 805-11 |
strip seal joints
|
129.44 |
LNFT |
168.00 |
21,745.92 |
170.00 |
22,004.80 |
175.00 |
22,652.00 |
160.00 |
20,710.40 |
| 806-02 |
deformed reinforcing steel (epoxy coated)
|
112,216   |
LB |
1.47 |
164,957.52 |
1.60 |
179,545.60 |
1.25 |
140,270.00 |
1.40 |
157,102.40 |
| 807-08 |
structural metalwork
|
lump |
LUMP |
7,875.00 |
7,875.00 |
7,500.00 |
7,500.00 |
10,000.00 |
10,000.00 |
7,500.00 |
7,500.00 |
| 810-01 |
concrete railing (barrier)
|
1,106.00 |
LNFT |
68.25 |
75,484.50 |
70.00 |
77,420.00 |
60.00 |
66,360.00 |
65.00 |
71,890.00 |
| 813-01 |
concrete approach slabs
|
355.56 |
SQYD |
215.25 |
76,534.29 |
270.00 |
96,001.20 |
220.00 |
78,223.20 |
205.00 |
72,889.80 |
| | SUBTOTAL GENERAL |
|
|
|
14,468,485.68 |
|
14,307,538.08 |
|
15,212,334.47 |
|
15,369,278.90 |
| |
|
|
|
|
|
|
|
|
|
|
|
| ALTERNATE A |
alternate pavement types
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| ALTERNATE A1 |
portland cement concrete pavement
|
|
|
|
|
|
|
|
|
|
|
| 601-01-M |
portland cement concrete pavement (11" thick)
|
85,499.6 |
SQYD |
47.73 |
4,080,895.91 |
50.00 |
4,274,980.00 |
43.00 |
3,676,482.80 |
45.00 |
3,847,482.00 |
| 601-04 |
portland cement concrete pavement coring
|
21   |
EACH |
121.97 |
2,561.37 |
120.00 |
2,520.00 |
90.00 |
1,890.00 |
115.00 |
2,415.00 |
| 732-03-A-01 |
plastic pvmt striping (broken line)(4"width)preformed
marking tape (type v) |
5.397 |
MILE |
3,675.00 |
19,833.98 |
5,500.00 |
29,683.50 |
3,950.00 |
21,318.15 |
3,600.00 |
19,429.20 |
| | SUBTOTAL ALT A1 |
|
|
|
4,103,291.26 |
|
4,307,183.50 |
|
3,699,690.95 |
|
3,869,326.20 |
| |
|
|
|
|
|
|
|
|
|
|
|
| ALTERNATE A2 |
superpave asphaltic concrete pavement
|
|
|
|
|
|
|
|
|
|
|
| 502-01-01 |
superpave asphaltic concrete (alternate a2)
|
51,727.4 |
TON |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
5.397 |
MILE |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
| S-001 |
rumble strips (ground-in)
|
11.3 |
MILE |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
| |
|
|
|
|
|
|
|
|
|
|
|
| ALTERNATE D |
bridge foundation alternates
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| ALTERNATE D1 |
pile foundation
|
|
|
|
|
|
|
|
|
|
|
| 802-02 |
structural excavation for intermediate bents
|
387.0 |
CUYD |
23.10 |
8,939.70 |
20.00 |
7,740.00 |
15.00 |
5,805.00 |
22.00 |
8,514.00 |
| 804-01-B |
precast concrete piles (14")
|
80   |
LNFT |
183.75 |
14,700.00 |
80.00 |
6,400.00 |
78.00 |
6,240.00 |
175.00 |
14,000.00 |
| 804-01-D |
precast concrete piles (18")
|
2,430   |
LNFT |
80.85 |
196,465.50 |
67.00 |
162,810.00 |
56.00 |
136,080.00 |
77.00 |
187,110.00 |
| 804-01-F |
precast concrete piles (24")
|
576   |
LNFT |
178.50 |
102,816.00 |
100.00 |
57,600.00 |
128.00 |
73,728.00 |
170.00 |
97,920.00 |
| 804-05 |
precast concrete test piles
|
1   |
EACH |
23,100.00 |
23,100.00 |
20,000.00 |
20,000.00 |
5,000.00 |
5,000.00 |
22,000.00 |
22,000.00 |
| 804-09 |
loading test piles
|
1   |
EACH |
18,900.00 |
18,900.00 |
30,000.00 |
30,000.00 |
35,200.00 |
35,200.00 |
18,000.00 |
18,000.00 |
| 804-10 |
reloading test piles
|
1   |
EACH |
1,050.00 |
1,050.00 |
3,000.00 |
3,000.00 |
4,750.00 |
4,750.00 |
1,000.00 |
1,000.00 |
| 804-11 |
redriving test piles
|
1   |
EACH |
1,050.00 |
1,050.00 |
6,000.00 |
6,000.00 |
2,000.00 |
2,000.00 |
1,000.00 |
1,000.00 |
| 804-12 |
loading permanent piles
|
1   |
EACH |
1,050.00 |
1,050.00 |
30,000.00 |
30,000.00 |
8,700.00 |
8,700.00 |
1,000.00 |
1,000.00 |
| 804-17 |
dynamic monitoring
|
33   |
EACH |
1,260.00 |
41,580.00 |
1,500.00 |
49,500.00 |
525.00 |
17,325.00 |
1,200.00 |
39,600.00 |
| 805-01-D |
class a concrete (footings)
|
138.78 |
CUYD |
378.00 |
52,458.84 |
450.00 |
62,451.00 |
235.00 |
32,613.30 |
360.00 |
49,960.80 |
| 805-01-F |
class a concrete (bents)
|
317.45 |
CUYD |
708.75 |
224,992.69 |
550.00 |
174,597.50 |
550.00 |
174,597.50 |
675.00 |
214,278.75 |
| 806-01 |
deformed reinforcing steel
|
97,320   |
LB |
1.26 |
122,623.20 |
1.35 |
131,382.00 |
0.95 |
92,454.00 |
1.20 |
116,784.00 |
| S-101 |
dynamic analysis
|
33   |
EACH |
1,470.00 |
48,510.00 |
1,500.00 |
49,500.00 |
410.00 |
13,530.00 |
1,400.00 |
46,200.00 |
| | SUBTOTAL ALT D1 |
|
|
|
858,235.93 |
|
790,980.50 |
|
608,022.80 |
|
817,367.55 |
| |
|
|
|
|
|
|
|
|
|
|
|
| ALTERNATE D2 |
drilled shaft foundation
|
|
|
|
|
|
|
|
|
|
|
| 805-01-F |
class a concrete (bents)
|
350.01 |
CUYD |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
| 806-01 |
deformed reinforcing steel
|
79,991   |
LB |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
| 814-01-B |
drilled shaft (24")
|
100.0 |
LNFT |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
| 814-01-J |
drilled shaft (66")
|
765.0 |
LNFT |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
| 814-02-J |
trial shaft (66")
|
45.0 |
LNFT |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
| 814-04-B |
crosshole sonic logging (24")
|
4   |
EACH |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
| 814-04-J |
crosshole sonic logging (66")
|
15   |
EACH |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
| S-102 |
test drilled shaft (66")
|
1   |
EACH |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
| S-103 |
load testing a drilled shaft
|
1   |
EACH |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
| |
|
|
|
|
|
|
|
|
|
|
|
| | ITEM TOTAL (CONSTRUCTION BID) |
|
|
|
19,430,012.87 |
|
19,405,702.08 |
|
19,520,048.22 |
|
20,055,972.65 |
| | NUMBER OF DAYS BID AT $1,000 PER DAY. |
|
|
|
450,000.00 |
|
500,000.00 |
|
650,000.00 |
|
540,000.00 |
| | LIFE CYCLE COST |
|
|
|
565,000.00 |
|
565,000.00 |
|
565,000.00 |
|
565,000.00 |
| | TOTAL BID |
|
|
|
20,445,012.87 |
|
20,470,702.08 |
|
20,735,048.22 |
|
21,160,972.65 |
|
| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 5 - AUSTIN BRIDGE & ROAD, LP |
- 6 - SPECIALTY CONTRACTORS |
- 7 - GILCHRIST CONSTRUCTION CO. LLC |
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 201-01 |
clearing & grubbing
|
lump |
LUMP |
600,000.00 |
600,000.00 |
1,200,000.00 |
1,200,000.00 |
950,000.00 |
950,000.00 |
|
|
| 202-01 |
removal of structures & obstructions
|
lump |
LUMP |
15,000.00 |
15,000.00 |
20,000.00 |
20,000.00 |
30,000.00 |
30,000.00 |
|
|
| 202-02-B |
removal of concrete box culvert (sta. 47+920; 3' x 3'
x 76') |
1   |
EACH |
1,000.00 |
1,000.00 |
3,000.00 |
3,000.00 |
3,000.00 |
3,000.00 |
|
|
| 202-02-C |
removal of portland cement concrete pavement
|
4,862   |
SQYD |
8.00 |
38,896.00 |
5.00 |
24,310.00 |
7.50 |
36,465.00 |
|
|
| 202-02-G |
removal of surfacing & stabilized base
|
3,241.2 |
SQYD |
1.60 |
5,185.92 |
4.00 |
12,964.80 |
5.25 |
17,016.30 |
|
|
| 202-02-H |
removal of guard rail
|
1,370   |
LNFT |
4.00 |
5,480.00 |
5.00 |
6,850.00 |
10.00 |
13,700.00 |
|
|
| 202-02-01 |
removal of wood barn (lt. of sta. 1508+73; 15' x 10')
|
1   |
EACH |
750.00 |
750.00 |
500.00 |
500.00 |
2,000.00 |
2,000.00 |
|
|
| 202-02-02 |
removal of wood frame house (lt. of sta. 1549+99;
1665 sq. ft.) |
1   |
EACH |
1,500.00 |
1,500.00 |
5,000.00 |
5,000.00 |
4,500.00 |
4,500.00 |
|
|
| 202-02-03 |
removal of wood barn (lt. of sta. 1551+00; 270 sq. ft.)
|
1   |
EACH |
750.00 |
750.00 |
1,000.00 |
1,000.00 |
1,500.00 |
1,500.00 |
|
|
| 202-02-04 |
removal of metal shed (lt. of sta. 1552+01; 80 sq. ft.)
|
1   |
EACH |
750.00 |
750.00 |
500.00 |
500.00 |
900.00 |
900.00 |
|
|
| 202-02-05 |
removal of metal oilwell (no tanks) with utility pole
(rt. of sta. 1522+00) |
1   |
EACH |
6,000.00 |
6,000.00 |
2,000.00 |
2,000.00 |
5,000.00 |
5,000.00 |
|
|
| 203-01 |
general excavation
|
1,079,556   |
CUYD |
1.90 |
2,051,156.40 |
1.50 |
1,619,334.00 |
2.15 |
2,321,045.40 |
|
|
| 203-03 |
embankment
|
1,076,158   |
CUYD |
1.84 |
1,980,130.72 |
2.88 |
3,099,335.04 |
3.50 |
3,766,553.00 |
|
|
| 203-04 |
nonplastic embankment (stone)
|
2,161   |
CUYD |
95.00 |
205,295.00 |
82.00 |
177,202.00 |
155.00 |
334,955.00 |
|
|
| 204-02 |
temporary hay or straw bales
|
84   |
EACH |
8.00 |
672.00 |
10.00 |
840.00 |
30.00 |
2,520.00 |
|
|
| 204-03 |
temporary slope drains
|
2,035   |
LNFT |
14.50 |
29,507.50 |
15.00 |
30,525.00 |
22.00 |
44,770.00 |
|
|
| 204-05-A |
temporary sediment check dams (hay)
|
48   |
EACH |
95.00 |
4,560.00 |
400.00 |
19,200.00 |
350.00 |
16,800.00 |
|
|
| 204-05-B |
temporary sediment check dams (stone)
|
25   |
EACH |
450.00 |
11,250.00 |
600.00 |
15,000.00 |
1,100.00 |
27,500.00 |
|
|
| 204-06 |
temporary silt fencing
|
10,400   |
LNFT |
2.10 |
21,840.00 |
2.00 |
20,800.00 |
2.00 |
20,800.00 |
|
|
| 204-07 |
temporary stone construction entrance
|
2   |
EACH |
10,000.00 |
20,000.00 |
2,300.00 |
4,600.00 |
3,000.00 |
6,000.00 |
|
|
| 302-01 |
class ii base course
|
17,205.2 |
CUYD |
76.00 |
1,307,595.20 |
80.00 |
1,376,416.00 |
95.00 |
1,634,494.00 |
|
|
| 302-02-B-01 |
class ii base course (6" thick) (soil cement)
|
120,332.8 |
SQYD |
6.20 |
746,063.36 |
8.00 |
962,662.40 |
8.20 |
986,728.96 |
|
|
| 305-01-D |
subgrade layer (12" thick)
|
120,333   |
SQYD |
7.80 |
938,597.40 |
6.76 |
813,451.08 |
8.00 |
962,664.00 |
|
|
| 502-01 |
superpave asphaltic concrete
|
12,913.3 |
TON |
83.00 |
1,071,803.90 |
83.00 |
1,071,803.90 |
100.00 |
1,291,330.00 |
|
|
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
318.4 |
TON |
182.50 |
58,108.00 |
183.00 |
58,267.20 |
125.00 |
39,800.00 |
|
|
| 701-01-I |
cross drain pipe (24" rcp/pcp)
|
1,078   |
LNFT |
57.69 |
62,189.82 |
80.00 |
86,240.00 |
73.00 |
78,694.00 |
|
|
| 701-01-I-01 |
cross drain pipe (24" rcp)
|
152   |
LNFT |
60.73 |
9,230.96 |
80.00 |
12,160.00 |
100.00 |
15,200.00 |
|
|
| 701-01-K |
cross drain pipe (30" rcp)
|
380   |
LNFT |
96.16 |
36,540.80 |
110.00 |
41,800.00 |
110.00 |
41,800.00 |
|
|
| 701-01-M |
cross drain pipe (36" rcp/pcp)
|
456   |
LNFT |
101.22 |
46,156.32 |
163.00 |
74,328.00 |
135.00 |
61,560.00 |
|
|
| 701-01-O |
cross drain pipe (48" rcp)
|
320   |
LNFT |
172.07 |
55,062.40 |
221.00 |
70,720.00 |
210.00 |
67,200.00 |
|
|
| 701-01-P |
cross drain pipe (54" rcp)
|
512   |
LNFT |
217.62 |
111,421.44 |
328.00 |
167,936.00 |
260.00 |
133,120.00 |
|
|
| 701-01-P-01 |
cross drain pipe (54" rcp)(class v)
|
544   |
LNFT |
283.41 |
154,175.04 |
378.00 |
205,632.00 |
350.00 |
190,400.00 |
|
|
| 701-01-S |
cross drain pipe (72" rcp)
|
384   |
LNFT |
384.63 |
147,697.92 |
490.00 |
188,160.00 |
450.00 |
172,800.00 |
|
|
| 701-01-S-01 |
cross drain pipe (72" rcp)(class v)
|
922   |
LNFT |
435.24 |
401,291.28 |
580.00 |
534,760.00 |
520.00 |
479,440.00 |
|
|
| 701-05-G-01 |
side drain pipe (18")(erosion)
|
174   |
LNFT |
50.61 |
8,806.14 |
45.00 |
7,830.00 |
70.00 |
12,180.00 |
|
|
| 702-03-A |
catch basins (cb-01)
|
8   |
EACH |
1,821.92 |
14,575.36 |
2,500.00 |
20,000.00 |
2,000.00 |
16,000.00 |
|
|
| 702-03-B |
catch basins (cb-02)
|
4   |
EACH |
2,530.44 |
10,121.76 |
3,700.00 |
14,800.00 |
2,800.00 |
11,200.00 |
|
|
| 704-03 |
blocked out guard rail
|
325.0 |
LNFT |
20.00 |
6,500.00 |
18.00 |
5,850.00 |
20.00 |
6,500.00 |
|
|
| 704-08-B |
guard rail transitions (double thrie beam)
|
100.0 |
LNFT |
45.00 |
4,500.00 |
55.00 |
5,500.00 |
62.00 |
6,200.00 |
|
|
| 704-11-A |
guard rail end treatment (flared)
|
4   |
EACH |
1,900.00 |
7,600.00 |
1,900.00 |
7,600.00 |
2,000.00 |
8,000.00 |
|
|
| 705-02 |
combination mesh & barbed wire fence
|
30,662   |
LNFT |
6.45 |
197,769.90 |
8.00 |
245,296.00 |
5.90 |
180,905.80 |
|
|
| 706-03-C |
incidental concrete paving (6" thick)
|
111.4 |
SQYD |
125.00 |
13,925.00 |
42.00 |
4,678.80 |
100.00 |
11,140.00 |
|
|
| 708-01 |
right-of-way monument
|
57   |
EACH |
120.00 |
6,840.00 |
200.00 |
11,400.00 |
340.00 |
19,380.00 |
|
|
| 708-02 |
right-of-way monument witness post
|
57   |
EACH |
80.00 |
4,560.00 |
100.00 |
5,700.00 |
340.00 |
19,380.00 |
|
|
| 712-01-A |
concrete cast-in-place revetment (4" thick)
|
1,242   |
SQYD |
75.00 |
93,150.00 |
75.00 |
93,150.00 |
115.00 |
142,830.00 |
|
|
| 712-02 |
sacked concrete revetment
|
102   |
SQYD |
150.00 |
15,300.00 |
200.00 |
20,400.00 |
100.00 |
10,200.00 |
|
|
| 712-04 |
flexible revetment
|
312   |
SQYD |
75.00 |
23,400.00 |
75.00 |
23,400.00 |
95.00 |
29,640.00 |
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
55,000.00 |
55,000.00 |
25,000.00 |
25,000.00 |
200,000.00 |
200,000.00 |
|
|
| 716-01-A |
mulch (vegetative)
|
149.2 |
TON |
500.00 |
74,600.00 |
1,000.00 |
149,200.00 |
500.00 |
74,600.00 |
|
|
| 717-01 |
seeding
|
8,952   |
LB |
8.00 |
71,616.00 |
8.00 |
71,616.00 |
10.00 |
89,520.00 |
|
|
| 718-01 |
fertilizer
|
149,230   |
LB |
0.60 |
89,538.00 |
0.80 |
119,384.00 |
0.40 |
59,692.00 |
|
|
| 718-02 |
agricultural lime
|
140.0 |
TON |
100.00 |
14,000.00 |
150.00 |
21,000.00 |
92.00 |
12,880.00 |
|
|
| 720-01-A |
erosion control system, slope protection (type a)
|
25,275   |
SQYD |
1.10 |
27,802.50 |
2.00 |
50,550.00 |
1.40 |
35,385.00 |
|
|
| 720-01-C |
erosion control system, flexible channel liner (type c)
|
2,600   |
SQYD |
1.20 |
3,120.00 |
2.00 |
5,200.00 |
1.90 |
4,940.00 |
|
|
| 720-01-D |
erosion control system, flexible channel liner (type d)
|
13,358   |
SQYD |
1.20 |
16,029.60 |
2.00 |
26,716.00 |
1.90 |
25,380.20 |
|
|
| 720-01-E |
erosion control system, flexible channel liner (type e)
|
934   |
SQYD |
2.50 |
2,335.00 |
2.00 |
1,868.00 |
2.90 |
2,708.60 |
|
|
| 720-01-F |
erosion control system, flexible channel liner (type f)
|
1,712   |
SQYD |
2.50 |
4,280.00 |
2.00 |
3,424.00 |
2.90 |
4,964.80 |
|
|
| 722-02 |
project site laboratory (equipped)
|
1   |
EACH |
20,000.00 |
20,000.00 |
30,000.00 |
30,000.00 |
75,000.00 |
75,000.00 |
|
|
| 725-01 |
temporary detour roads
|
7,482.8 |
SQYD |
130.00 |
972,764.00 |
37.00 |
276,863.60 |
60.00 |
448,968.00 |
|
|
| 726-01 |
bedding material
|
1,255.2 |
CUYD |
79.00 |
99,160.80 |
80.00 |
100,416.00 |
85.00 |
106,692.00 |
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
1,750,000.00 |
1,750,000.00 |
873,000.00 |
873,000.00 |
2,300,000.00 |
2,300,000.00 |
|
|
| 729-16-B |
object marker assembly (type 2)
|
26   |
EACH |
60.00 |
1,560.00 |
60.00 |
1,560.00 |
65.00 |
1,690.00 |
|
|
| 729-16-C |
object marker assembly (type 3)
|
4   |
EACH |
80.00 |
320.00 |
72.00 |
288.00 |
80.00 |
320.00 |
|
|
| 731-01 |
nonreflectorized raised pavement markers
|
220   |
EACH |
15.00 |
3,300.00 |
15.00 |
3,300.00 |
17.00 |
3,740.00 |
|
|
| 731-02 |
reflectorized raised pavement markers
|
842   |
EACH |
5.10 |
4,294.20 |
5.10 |
4,294.20 |
5.50 |
4,631.00 |
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
12.319 |
MILE |
2,690.22 |
33,140.82 |
2,690.00 |
33,138.11 |
2,400.00 |
29,565.60 |
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
400,000.00 |
400,000.00 |
300,000.00 |
300,000.00 |
400,000.00 |
400,000.00 |
|
|
| 805-03 |
class aa concrete
|
14.18 |
CUYD |
1,200.00 |
17,016.00 |
775.00 |
10,989.50 |
1,200.00 |
17,016.00 |
|
|
| 805-04 |
class aa(m) concrete
|
700.28 |
CUYD |
750.00 |
525,210.00 |
550.00 |
385,154.00 |
800.00 |
560,224.00 |
|
|
| 805-08-G |
precast-prestressed concrete girders (type bt-72)
|
2,439.4 |
LNFT |
220.00 |
536,668.00 |
185.00 |
451,289.00 |
200.00 |
487,880.00 |
|
|
| 805-11 |
strip seal joints
|
129.44 |
LNFT |
300.00 |
38,832.00 |
170.00 |
22,004.80 |
190.00 |
24,593.60 |
|
|
| 806-02 |
deformed reinforcing steel (epoxy coated)
|
112,216   |
LB |
1.10 |
123,437.60 |
1.60 |
179,545.60 |
1.25 |
140,270.00 |
|
|
| 807-08 |
structural metalwork
|
lump |
LUMP |
15,000.00 |
15,000.00 |
7,500.00 |
7,500.00 |
20,000.00 |
20,000.00 |
|
|
| 810-01 |
concrete railing (barrier)
|
1,106.00 |
LNFT |
75.00 |
82,950.00 |
70.00 |
77,420.00 |
85.00 |
94,010.00 |
|
|
| 813-01 |
concrete approach slabs
|
355.56 |
SQYD |
300.00 |
106,668.00 |
270.00 |
96,001.20 |
225.00 |
80,001.00 |
|
|
| | SUBTOTAL GENERAL |
|
|
|
15,641,348.06 |
|
15,719,624.23 |
|
19,538,483.26 |
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| ALTERNATE A |
alternate pavement types
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| ALTERNATE A1 |
portland cement concrete pavement
|
|
|
|
|
|
|
|
|
|
|
| 601-01-M |
portland cement concrete pavement (11" thick)
|
85,499.6 |
SQYD |
42.00 |
3,590,983.20 |
0.00 |
0.00 |
48.50 |
4,146,730.60 |
|
|
| 601-04 |
portland cement concrete pavement coring
|
21   |
EACH |
108.00 |
2,268.00 |
0.00 |
0.00 |
115.00 |
2,415.00 |
|
|
| 732-03-A-01 |
plastic pvmt striping (broken line)(4"width)preformed
marking tape (type v) |
5.397 |
MILE |
3,945.00 |
21,291.17 |
0.00 |
0.00 |
4,000.00 |
21,588.00 |
|
|
| | SUBTOTAL ALT A1 |
|
|
|
3,614,542.37 |
|
|
|
4,170,733.60 |
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| ALTERNATE A2 |
superpave asphaltic concrete pavement
|
|
|
|
|
|
|
|
|
|
|
| 502-01-01 |
superpave asphaltic concrete (alternate a2)
|
51,727.4 |
TON |
0.00 |
0.00 |
74.12 |
3,834,034.89 |
0.00 |
0.00 |
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
5.397 |
MILE |
0.00 |
0.00 |
690.00 |
3,723.93 |
0.00 |
0.00 |
|
|
| S-001 |
rumble strips (ground-in)
|
11.3 |
MILE |
0.00 |
0.00 |
600.00 |
6,780.00 |
0.00 |
0.00 |
|
|
| | SUBTOTAL ALT A2 |
|
|
|
|
|
3,844,538.82 |
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| ALTERNATE D |
bridge foundation alternates
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| ALTERNATE D1 |
pile foundation
|
|
|
|
|
|
|
|
|
|
|
| 802-02 |
structural excavation for intermediate bents
|
387.0 |
CUYD |
40.00 |
15,480.00 |
20.00 |
7,740.00 |
25.00 |
9,675.00 |
|
|
| 804-01-B |
precast concrete piles (14")
|
80   |
LNFT |
175.00 |
14,000.00 |
88.00 |
7,040.00 |
140.00 |
11,200.00 |
|
|
| 804-01-D |
precast concrete piles (18")
|
2,430   |
LNFT |
125.00 |
303,750.00 |
67.00 |
162,810.00 |
60.00 |
145,800.00 |
|
|
| 804-01-F |
precast concrete piles (24")
|
576   |
LNFT |
190.00 |
109,440.00 |
100.00 |
57,600.00 |
120.00 |
69,120.00 |
|
|
| 804-05 |
precast concrete test piles
|
1   |
EACH |
15,000.00 |
15,000.00 |
20,000.00 |
20,000.00 |
20,000.00 |
20,000.00 |
|
|
| 804-09 |
loading test piles
|
1   |
EACH |
25,000.00 |
25,000.00 |
30,000.00 |
30,000.00 |
20,000.00 |
20,000.00 |
|
|
| 804-10 |
reloading test piles
|
1   |
EACH |
6,000.00 |
6,000.00 |
3,000.00 |
3,000.00 |
1,000.00 |
1,000.00 |
|
|
| 804-11 |
redriving test piles
|
1   |
EACH |
5,000.00 |
5,000.00 |
6,000.00 |
6,000.00 |
1,000.00 |
1,000.00 |
|
|
| 804-12 |
loading permanent piles
|
1   |
EACH |
15,000.00 |
15,000.00 |
30,000.00 |
30,000.00 |
100.00 |
100.00 |
|
|
| 804-17 |
dynamic monitoring
|
33   |
EACH |
1,600.00 |
52,800.00 |
1,500.00 |
49,500.00 |
2,000.00 |
66,000.00 |
|
|
| 805-01-D |
class a concrete (footings)
|
138.78 |
CUYD |
1,000.00 |
138,780.00 |
450.00 |
62,451.00 |
300.00 |
41,634.00 |
|
|
| 805-01-F |
class a concrete (bents)
|
317.45 |
CUYD |
800.00 |
253,960.00 |
550.00 |
174,597.50 |
600.00 |
190,470.00 |
|
|
| 806-01 |
deformed reinforcing steel
|
97,320   |
LB |
1.05 |
102,186.00 |
1.35 |
131,382.00 |
1.15 |
111,918.00 |
|
|
| S-101 |
dynamic analysis
|
33   |
EACH |
1,200.00 |
39,600.00 |
1,500.00 |
49,500.00 |
2,000.00 |
66,000.00 |
|
|
| | SUBTOTAL ALT D1 |
|
|
|
1,095,996.00 |
|
791,620.50 |
|
753,917.00 |
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| ALTERNATE D2 |
drilled shaft foundation
|
|
|
|
|
|
|
|
|
|
|
| 805-01-F |
class a concrete (bents)
|
350.01 |
CUYD |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
|
|
| 806-01 |
deformed reinforcing steel
|
79,991   |
LB |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
|
|
| 814-01-B |
drilled shaft (24")
|
100.0 |
LNFT |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
|
|
| 814-01-J |
drilled shaft (66")
|
765.0 |
LNFT |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
|
|
| 814-02-J |
trial shaft (66")
|
45.0 |
LNFT |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
|
|
| 814-04-B |
crosshole sonic logging (24")
|
4   |
EACH |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
|
|
| 814-04-J |
crosshole sonic logging (66")
|
15   |
EACH |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
|
|
| S-102 |
test drilled shaft (66")
|
1   |
EACH |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
|
|
| S-103 |
load testing a drilled shaft
|
1   |
EACH |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | ITEM TOTAL (CONSTRUCTION BID) |
|
|
|
20,351,886.43 |
|
20,355,783.55 |
|
24,463,133.86 |
|
|
| | NUMBER OF DAYS BID AT $1,000 PER DAY. |
|
|
|
600,000.00 |
|
700,000.00 |
|
700,000.00 |
|
|
| | LIFE CYCLE COST |
|
|
|
565,000.00 |
|
1,678,000.00 |
|
565,000.00 |
|
|
| | TOTAL BID |
|
|
|
21,516,886.43 |
|
22,734,583.55 |
|
25,728,133.86 |
|
|
|