| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - W. R. CORE, LLC. |
- 2 - MISSOURI PETROLEUM PRODUCTS CO. LLC |
- 3 - T. L. WALLACE CONSTRUCTION, INC. |
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 507-01-A |
asphaltic material (crs-2p emulsion)
|
141,790   |
GAL |
2.05 |
290,669.50 |
1.94 |
275,072.60 |
2.25 |
319,027.50 |
|
|
| 507-02-C |
aggregate (s3)
|
457,385   |
SQYD |
0.75 |
343,038.75 |
0.81 |
370,481.85 |
0.78 |
356,760.30 |
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
17,500.00 |
17,500.00 |
16,906.00 |
16,906.00 |
21,500.00 |
21,500.00 |
|
|
| 713-06-A |
temporary reflectorized raised pavement markers (tabs)
|
8,770   |
EACH |
1.50 |
13,155.00 |
0.71 |
6,226.70 |
1.00 |
8,770.00 |
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
30,000.00 |
30,000.00 |
48,000.00 |
48,000.00 |
31,000.00 |
31,000.00 |
|
|
| 731-02 |
reflectorized raised pavement markers
|
4,434   |
EACH |
4.50 |
19,953.00 |
4.66 |
20,662.44 |
4.50 |
19,953.00 |
|
|
| 732-01-C |
plastic pavement striping (8" width)
|
153   |
LNFT |
1.00 |
153.00 |
0.48 |
73.44 |
1.00 |
153.00 |
|
|
| 732-01-E |
plastic pavement striping (24" width)
|
286   |
LNFT |
3.00 |
858.00 |
1.66 |
474.76 |
3.00 |
858.00 |
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
95.336 |
MILE |
2,200.00 |
209,739.20 |
2,137.50 |
203,780.70 |
2,200.00 |
209,739.20 |
|
|
| 732-02-A-03 |
plast pvmt striping(solid line)(4" width)hot appl
thermo (40mil thickness) |
10.020 |
MILE |
1,200.00 |
12,024.00 |
1,504.80 |
15,078.10 |
1,200.00 |
12,024.00 |
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
11.670 |
MILE |
750.00 |
8,752.50 |
579.50 |
6,762.77 |
750.00 |
8,752.50 |
|
|
| 732-03-A-03 |
plastic pvmt striping(broken line)(4" width) hot appl
thermo (40 mil thick) |
2.750 |
MILE |
600.00 |
1,650.00 |
389.50 |
1,071.13 |
600.00 |
1,650.00 |
|
|
| 732-04-A |
plastic pavement legends & symbols (arrow)
|
2   |
EACH |
200.00 |
400.00 |
137.75 |
275.50 |
200.00 |
400.00 |
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
7,000.00 |
7,000.00 |
1,000.00 |
1,000.00 |
15,500.00 |
15,500.00 |
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
954,892.95 |
|
965,865.99 |
|
1,006,087.50 |
|
|
|