Lead Project: 002-05-0030
Parish: MADISON
Routes: LA 3218
Description: US 80 - WEST END OF MISSISSIPPI RIVER BRIDGE
Type Const: cold planing asphaltic concrete, pavement patching and joint repair, superpave asphaltic
concrete pavement, and related work.
Estimated Construction Cost: $693,951.70
 
RankLicenseBidderConstruction Bid
1 12487 DIAMOND B CONSTRUCTION CO., L.L.C. $797,461.70
2 05789 D & J CONSTRUCTION CO., INC. $825,482.13
 
Item Number Item Description Quantity Unit of Measure - 1 -
DIAMOND B CONSTRUCTION CO., L.L.C.
- 2 -
D & J CONSTRUCTION CO., INC.

 

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
401-02 aggregate surface course (adjusted vehicular
measurement)
230      CUYD 45.00 10,350.00 60.00 13,800.00        
502-01 superpave asphaltic concrete 3,391.1    TON 98.00 332,327.80 110.00 373,021.00        
502-01-A superpave asphaltic concrete, drives, turnouts and
miscellaneous
186.0    TON 150.00 27,900.00 165.00 30,690.00        
509-01 cold planing asphaltic pavement 30,240      SQYD 3.00 90,720.00 2.50 75,600.00        
509-02 contractor retained reclaimed asphaltic pavement - 1,262      CUYD 0.10 - 126.20 0.01 - 12.62        
510-01-C pavement patching 1,074      SQYD 155.00 166,470.00 150.00 161,100.00        
510-03 pavement joint repair 152.5    TON 195.00 29,737.50 200.00 30,500.00        
713-01 temporary signs & barricades lump      LUMP 13,300.00 13,300.00 24,000.00 24,000.00        
713-03-A temporary pavement markings (broken line)(4" width)(4'
length)
4.296  MILE 300.00 1,288.80 250.00 1,074.00        
713-03-B temporary pavement markings (broken line)(4" width)
(10' length)
4.296  MILE 325.00 1,396.20 200.00 859.20        
713-04-A temporary pavement markings (solid line)(4" width) 9.152  MILE 400.00 3,660.80 1.00 9.15        
716-01-A mulch (vegetative) 4.2    TON 525.00 2,205.00 550.00 2,310.00        
717-01 seeding 94      LB 10.00 940.00 9.50 893.00        
718-01 fertilizer 2,080      LB 0.65 1,352.00 0.60 1,248.00        
727-01 mobilization lump      LUMP 79,000.00 79,000.00 80,000.00 80,000.00        
731-02 reflectorized raised pavement markers 285      EACH 5.00 1,425.00 12.00 3,420.00        
732-02-A plastic pavement striping (solid line) (4" width) 4.576  MILE 2,600.00 11,897.60 2,800.00 12,812.80        
732-03-A plastic pavement striping (broken line)(4" width) 2.148  MILE 900.00 1,933.20 1,800.00 3,866.40        
740-01 construction layout lump      LUMP 12,000.00 12,000.00 9,000.00 9,000.00        
S-001 saw cutting asphalt concrete patches (18" depth) 6,456      LNFT 1.50 9,684.00 0.20 1,291.20        
                       
 CONTRACTOR TOTAL       797,461.70   825,482.13        