DBE GOAL FED
Lead Project: 009-32-0021
Parish: GRANT
Routes: LA 158
Description: BAYOU GRAPPE BRIDGE AND APPROACHES
Type Const: grading, removal of existing bridge, drainage struct, lime trmt, class ii bc, superpave
asph conc pvmt, pre-cast prestressed conc girders and related work.
Estimated Construction Cost: $1,887,864.19
 
RankLicenseBidderConstruction Bid
1 34567 JAMES CONSTRUCTION GROUP LLC $2,006,233.95
2 12312 GILCHRIST CONSTRUCTION CO. LLC $2,387,493.90
3 09090 GUINN BROTHERS, LLC. $3,857,731.76
 
Item Number Item Description Quantity Unit of Measure - 1 -
JAMES CONSTRUCTION GROUP LLC
- 2 -
GILCHRIST CONSTRUCTION CO. LLC
- 3 -
GUINN BROTHERS, LLC.

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
201-01 clearing & grubbing lump      LUMP 85,000.00 85,000.00 70,000.00 70,000.00 80,000.00 80,000.00    
202-01 removal of structures & obstructions lump      LUMP 2,500.00 2,500.00 20,000.00 20,000.00 50,000.00 50,000.00    
202-02-A-01 removal of bridges - str no 08220093205901 (sta.
116+97.77 ; 312' x 26.5' concrete deck girder
bridge)
1      EACH 75,000.00 75,000.00 85,000.00 85,000.00 225,000.00 225,000.00    
202-02-G removal of surfacing & stabilized base 1,528.0    SQYD 7.20 11,001.60 8.00 12,224.00 18.00 27,504.00    
203-01 general excavation 2,787      CUYD 12.00 33,444.00 13.50 37,624.50 12.00 33,444.00    
203-02 drainage excavation 3,276      CUYD 11.00 36,036.00 17.00 55,692.00 15.00 49,140.00    
203-03 embankment 353      CUYD 18.00 6,354.00 40.00 14,120.00 25.00 8,825.00    
204-02 temporary hay or straw bales 100      EACH 16.00 1,600.00 20.00 2,000.00 50.00 5,000.00    
204-05-A temporary sediment check dams (hay) 4      EACH 175.00 700.00 400.00 1,600.00 400.00 1,600.00    
204-06 temporary silt fencing 1,005      LNFT 2.50 2,512.50 3.00 3,015.00 7.00 7,035.00    
304-01 lime 25.38   TON 145.00 3,680.10 155.00 3,933.90 200.00 5,076.00    
304-04-D lime treatment (type d) (12" thick) 1,450      SQYD 0.01 14.50 6.00 8,700.00 12.00 17,400.00    
308-01-A in-place cement treated base course (12" thick) 2,896      SQYD 13.00 37,648.00 9.00 26,064.00 20.50 59,368.00    
401-01 aggregate surface course (net section) 30.1    CUYD 40.00 1,204.00 140.00 4,214.00 100.00 3,010.00    
401-02 aggregate surface course (adjusted vehicular
measurement)
100      CUYD 35.00 3,500.00 145.00 14,500.00 100.00 10,000.00    
402-01 traffic maintenance aggregate (vehicular measurement) 100.0    CUYD 35.00 3,500.00 85.00 8,500.00 50.00 5,000.00    
502-01 superpave asphaltic concrete 491.2    TON 165.00 81,048.00 200.00 98,240.00 265.00 130,168.00    
502-01-A superpave asphaltic concrete, drives, turnouts, and
miscellaneous
127.3    TON 350.00 44,555.00 250.00 31,825.00 500.00 63,650.00    
701-05-I side drain pipe (24") 166      LNFT 65.00 10,790.00 80.00 13,280.00 110.00 18,260.00    
701-05-I-01 side drain pipe (24")(erosion) 283      LNFT 66.00 18,678.00 64.00 18,112.00 110.00 31,130.00    
702-03-A catch basins (cb-01) 2      EACH 4,400.00 8,800.00 3,000.00 6,000.00 5,000.00 10,000.00    
704-03 blocked out guard rail 100.0    LNFT 19.00 1,900.00 22.00 2,200.00 25.00 2,500.00    
704-08-B guard rail transitions (double thrie beam) 100.0    LNFT 53.00 5,300.00 65.00 6,500.00 60.00 6,000.00    
704-11-A guard rail end treatment (flared) 3      EACH 2,200.00 6,600.00 2,300.00 6,900.00 2,600.00 7,800.00    
705-02 combination mesh & barbed wire fence 546      LNFT 8.20 4,477.20 9.75 5,323.50 16.00 8,736.00    
708-01 right-of-way monument 10      EACH 175.00 1,750.00 350.00 3,500.00 250.00 2,500.00    
708-02 right-of-way monument witness post 10      EACH 50.00 500.00 350.00 3,500.00 250.00 2,500.00    
712-04 flexible revetment 577      SQYD 69.00 39,813.00 95.00 54,815.00 90.00 51,930.00    
713-01 temporary signs & barricades lump      LUMP 25,000.00 25,000.00 100,000.00 100,000.00 52,000.00 52,000.00    
717-01 seeding 305      LB 8.00 2,440.00 10.00 3,050.00 25.00 7,625.00    
718-01 fertilizer 10,150      LB 0.33 3,349.50 0.50 5,075.00 0.75 7,612.50    
727-01 mobilization lump      LUMP 200,000.00 200,000.00 238,000.00 238,000.00 550,000.00 550,000.00    
729-16-C object marker assembly (type 3) 4      EACH 70.00 280.00 85.00 340.00 100.00 400.00    
731-01 nonreflectorized raised pavement markers 154      EACH 15.00 2,310.00 17.00 2,618.00 20.00 3,080.00    
731-02 reflectorized raised pavement markers 24      EACH 6.50 156.00 7.50 180.00 12.00 288.00    
732-02-A plastic pavement striping (solid line) (4" width) 0.797  MILE 3,500.00 2,789.50 4,000.00 3,188.00 5,000.00 3,985.00    
732-03-A plastic pavement striping (broken line)(4" width) 0.177  MILE 1,450.00 256.65 1,800.00 318.60 2,500.00 442.50    
735-01 mailboxes 1      EACH 10.00 10.00 20.00 20.00 100.00 100.00    
735-02 mailbox supports (single) 1      EACH 150.00 150.00 200.00 200.00 200.00 200.00    
740-01 construction layout lump      LUMP 38,000.00 38,000.00 50,000.00 50,000.00 65,000.00 65,000.00    
804-01-B precast concrete piles (14") 160      LNFT 75.00 12,000.00 51.00 8,160.00 132.00 21,120.00    
804-01-F precast concrete piles (24") 704      LNFT 130.00 91,520.00 122.00 85,888.00 275.00 193,600.00    
804-01-G precast concrete piles (30") 704      LNFT 150.00 105,600.00 175.00 123,200.00 430.00 302,720.00    
804-12 loading permanent piles 1      EACH 2,000.00 2,000.00 6,500.00 6,500.00 100.00 100.00    
805-01-F class a concrete (bents) 147.04   CUYD 850.00 124,984.00 1,000.00 147,040.00 1,850.00 272,024.00    
805-03 class aa concrete 390.24   CUYD 800.00 312,192.00 1,100.00 429,264.00 1,350.00 526,824.00    
805-08-C precast-prestressed concrete girders (type iii) 2,085.0    LNFT 117.00 243,945.00 115.00 239,775.00 250.00 521,250.00    
805-11 strip seal joints 120.00   LNFT 170.00 20,400.00 160.00 19,200.00 200.00 24,000.00    
806-01 deformed reinforcing steel 136,736      LB 1.15 157,246.40 1.15 157,246.40 1.56 213,308.16    
807-08 structural metalwork lump      LUMP 12,000.00 12,000.00 15,000.00 15,000.00 12,500.00 12,500.00    
810-01 concrete railing (barrier) 772.00   LNFT 50.00 38,600.00 80.00 61,760.00 75.00 57,900.00    
813-01 concrete approach slabs 364.44   SQYD 225.00 81,999.00 200.00 72,888.00 265.00 96,576.60    
S-101 special anchor section 1      EACH 1,100.00 1,100.00 1,200.00 1,200.00 2,500.00 2,500.00    
                       
 CONTRACTOR TOTAL       2,006,233.95   2,387,493.90   3,857,731.76    