| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - JAMES CONSTRUCTION GROUP LLC |
- 2 - GILCHRIST CONSTRUCTION CO. LLC |
- 3 - GUINN BROTHERS, LLC. |
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 201-01 |
clearing & grubbing
|
lump |
LUMP |
85,000.00 |
85,000.00 |
70,000.00 |
70,000.00 |
80,000.00 |
80,000.00 |
|
|
| 202-01 |
removal of structures & obstructions
|
lump |
LUMP |
2,500.00 |
2,500.00 |
20,000.00 |
20,000.00 |
50,000.00 |
50,000.00 |
|
|
| 202-02-A-01 |
removal of bridges - str no 08220093205901 (sta.
116+97.77 ; 312' x 26.5' concrete deck girder bridge) |
1   |
EACH |
75,000.00 |
75,000.00 |
85,000.00 |
85,000.00 |
225,000.00 |
225,000.00 |
|
|
| 202-02-G |
removal of surfacing & stabilized base
|
1,528.0 |
SQYD |
7.20 |
11,001.60 |
8.00 |
12,224.00 |
18.00 |
27,504.00 |
|
|
| 203-01 |
general excavation
|
2,787   |
CUYD |
12.00 |
33,444.00 |
13.50 |
37,624.50 |
12.00 |
33,444.00 |
|
|
| 203-02 |
drainage excavation
|
3,276   |
CUYD |
11.00 |
36,036.00 |
17.00 |
55,692.00 |
15.00 |
49,140.00 |
|
|
| 203-03 |
embankment
|
353   |
CUYD |
18.00 |
6,354.00 |
40.00 |
14,120.00 |
25.00 |
8,825.00 |
|
|
| 204-02 |
temporary hay or straw bales
|
100   |
EACH |
16.00 |
1,600.00 |
20.00 |
2,000.00 |
50.00 |
5,000.00 |
|
|
| 204-05-A |
temporary sediment check dams (hay)
|
4   |
EACH |
175.00 |
700.00 |
400.00 |
1,600.00 |
400.00 |
1,600.00 |
|
|
| 204-06 |
temporary silt fencing
|
1,005   |
LNFT |
2.50 |
2,512.50 |
3.00 |
3,015.00 |
7.00 |
7,035.00 |
|
|
| 304-01 |
lime
|
25.38 |
TON |
145.00 |
3,680.10 |
155.00 |
3,933.90 |
200.00 |
5,076.00 |
|
|
| 304-04-D |
lime treatment (type d) (12" thick)
|
1,450   |
SQYD |
0.01 |
14.50 |
6.00 |
8,700.00 |
12.00 |
17,400.00 |
|
|
| 308-01-A |
in-place cement treated base course (12" thick)
|
2,896   |
SQYD |
13.00 |
37,648.00 |
9.00 |
26,064.00 |
20.50 |
59,368.00 |
|
|
| 401-01 |
aggregate surface course (net section)
|
30.1 |
CUYD |
40.00 |
1,204.00 |
140.00 |
4,214.00 |
100.00 |
3,010.00 |
|
|
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
100   |
CUYD |
35.00 |
3,500.00 |
145.00 |
14,500.00 |
100.00 |
10,000.00 |
|
|
| 402-01 |
traffic maintenance aggregate (vehicular measurement)
|
100.0 |
CUYD |
35.00 |
3,500.00 |
85.00 |
8,500.00 |
50.00 |
5,000.00 |
|
|
| 502-01 |
superpave asphaltic concrete
|
491.2 |
TON |
165.00 |
81,048.00 |
200.00 |
98,240.00 |
265.00 |
130,168.00 |
|
|
| 502-01-A |
superpave asphaltic concrete, drives, turnouts, and
miscellaneous |
127.3 |
TON |
350.00 |
44,555.00 |
250.00 |
31,825.00 |
500.00 |
63,650.00 |
|
|
| 701-05-I |
side drain pipe (24")
|
166   |
LNFT |
65.00 |
10,790.00 |
80.00 |
13,280.00 |
110.00 |
18,260.00 |
|
|
| 701-05-I-01 |
side drain pipe (24")(erosion)
|
283   |
LNFT |
66.00 |
18,678.00 |
64.00 |
18,112.00 |
110.00 |
31,130.00 |
|
|
| 702-03-A |
catch basins (cb-01)
|
2   |
EACH |
4,400.00 |
8,800.00 |
3,000.00 |
6,000.00 |
5,000.00 |
10,000.00 |
|
|
| 704-03 |
blocked out guard rail
|
100.0 |
LNFT |
19.00 |
1,900.00 |
22.00 |
2,200.00 |
25.00 |
2,500.00 |
|
|
| 704-08-B |
guard rail transitions (double thrie beam)
|
100.0 |
LNFT |
53.00 |
5,300.00 |
65.00 |
6,500.00 |
60.00 |
6,000.00 |
|
|
| 704-11-A |
guard rail end treatment (flared)
|
3   |
EACH |
2,200.00 |
6,600.00 |
2,300.00 |
6,900.00 |
2,600.00 |
7,800.00 |
|
|
| 705-02 |
combination mesh & barbed wire fence
|
546   |
LNFT |
8.20 |
4,477.20 |
9.75 |
5,323.50 |
16.00 |
8,736.00 |
|
|
| 708-01 |
right-of-way monument
|
10   |
EACH |
175.00 |
1,750.00 |
350.00 |
3,500.00 |
250.00 |
2,500.00 |
|
|
| 708-02 |
right-of-way monument witness post
|
10   |
EACH |
50.00 |
500.00 |
350.00 |
3,500.00 |
250.00 |
2,500.00 |
|
|
| 712-04 |
flexible revetment
|
577   |
SQYD |
69.00 |
39,813.00 |
95.00 |
54,815.00 |
90.00 |
51,930.00 |
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
25,000.00 |
25,000.00 |
100,000.00 |
100,000.00 |
52,000.00 |
52,000.00 |
|
|
| 717-01 |
seeding
|
305   |
LB |
8.00 |
2,440.00 |
10.00 |
3,050.00 |
25.00 |
7,625.00 |
|
|
| 718-01 |
fertilizer
|
10,150   |
LB |
0.33 |
3,349.50 |
0.50 |
5,075.00 |
0.75 |
7,612.50 |
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
200,000.00 |
200,000.00 |
238,000.00 |
238,000.00 |
550,000.00 |
550,000.00 |
|
|
| 729-16-C |
object marker assembly (type 3)
|
4   |
EACH |
70.00 |
280.00 |
85.00 |
340.00 |
100.00 |
400.00 |
|
|
| 731-01 |
nonreflectorized raised pavement markers
|
154   |
EACH |
15.00 |
2,310.00 |
17.00 |
2,618.00 |
20.00 |
3,080.00 |
|
|
| 731-02 |
reflectorized raised pavement markers
|
24   |
EACH |
6.50 |
156.00 |
7.50 |
180.00 |
12.00 |
288.00 |
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
0.797 |
MILE |
3,500.00 |
2,789.50 |
4,000.00 |
3,188.00 |
5,000.00 |
3,985.00 |
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
0.177 |
MILE |
1,450.00 |
256.65 |
1,800.00 |
318.60 |
2,500.00 |
442.50 |
|
|
| 735-01 |
mailboxes
|
1   |
EACH |
10.00 |
10.00 |
20.00 |
20.00 |
100.00 |
100.00 |
|
|
| 735-02 |
mailbox supports (single)
|
1   |
EACH |
150.00 |
150.00 |
200.00 |
200.00 |
200.00 |
200.00 |
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
38,000.00 |
38,000.00 |
50,000.00 |
50,000.00 |
65,000.00 |
65,000.00 |
|
|
| 804-01-B |
precast concrete piles (14")
|
160   |
LNFT |
75.00 |
12,000.00 |
51.00 |
8,160.00 |
132.00 |
21,120.00 |
|
|
| 804-01-F |
precast concrete piles (24")
|
704   |
LNFT |
130.00 |
91,520.00 |
122.00 |
85,888.00 |
275.00 |
193,600.00 |
|
|
| 804-01-G |
precast concrete piles (30")
|
704   |
LNFT |
150.00 |
105,600.00 |
175.00 |
123,200.00 |
430.00 |
302,720.00 |
|
|
| 804-12 |
loading permanent piles
|
1   |
EACH |
2,000.00 |
2,000.00 |
6,500.00 |
6,500.00 |
100.00 |
100.00 |
|
|
| 805-01-F |
class a concrete (bents)
|
147.04 |
CUYD |
850.00 |
124,984.00 |
1,000.00 |
147,040.00 |
1,850.00 |
272,024.00 |
|
|
| 805-03 |
class aa concrete
|
390.24 |
CUYD |
800.00 |
312,192.00 |
1,100.00 |
429,264.00 |
1,350.00 |
526,824.00 |
|
|
| 805-08-C |
precast-prestressed concrete girders (type iii)
|
2,085.0 |
LNFT |
117.00 |
243,945.00 |
115.00 |
239,775.00 |
250.00 |
521,250.00 |
|
|
| 805-11 |
strip seal joints
|
120.00 |
LNFT |
170.00 |
20,400.00 |
160.00 |
19,200.00 |
200.00 |
24,000.00 |
|
|
| 806-01 |
deformed reinforcing steel
|
136,736   |
LB |
1.15 |
157,246.40 |
1.15 |
157,246.40 |
1.56 |
213,308.16 |
|
|
| 807-08 |
structural metalwork
|
lump |
LUMP |
12,000.00 |
12,000.00 |
15,000.00 |
15,000.00 |
12,500.00 |
12,500.00 |
|
|
| 810-01 |
concrete railing (barrier)
|
772.00 |
LNFT |
50.00 |
38,600.00 |
80.00 |
61,760.00 |
75.00 |
57,900.00 |
|
|
| 813-01 |
concrete approach slabs
|
364.44 |
SQYD |
225.00 |
81,999.00 |
200.00 |
72,888.00 |
265.00 |
96,576.60 |
|
|
| S-101 |
special anchor section
|
1   |
EACH |
1,100.00 |
1,100.00 |
1,200.00 |
1,200.00 |
2,500.00 |
2,500.00 |
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
2,006,233.95 |
|
2,387,493.90 |
|
3,857,731.76 |
|
|
|