Lead Project: 420-01-0037
Parish: CADDO
Routes: LA 3032
Description: TURN LANE ADDITION
Type Const: grading, class ii base course, portland cement concrete pavement, and related work.
Estimated Construction Cost: $132,457.50
 
RankLicenseBidderConstruction Bid
1 28218 F. J. BURNELL, INC. $113,208.50
2 35619 WILLIAM N. CARTER $205,345.00
3 18546 C W & W CONTRACTORS, INC. $219,808.60
4 44289 JEFF MERCER LLC $243,082.80
 
Item Number Item Description Quantity Unit of Measure - 1 -
F. J. BURNELL, INC.
- 2 -
WILLIAM N. CARTER
- 3 -
C W & W CONTRACTORS, INC.
- 4 -
JEFF MERCER LLC
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
202-02-E removal of concrete curbs 330.0    LNFT 7.00 2,310.00 25.00 8,250.00 10.00 3,300.00 1.00 330.00
202-02-G removal of surfacing & stabilized base 203.2    SQYD 10.00 2,032.00 20.00 4,064.00 10.00 2,032.00 15.00 3,048.00
203-01 general excavation 163      CUYD 10.00 1,630.00 15.00 2,445.00 25.00 4,075.00 10.00 1,630.00
203-07-A borrow (vehicular measurement)(selected soils) 300      CUYD 3.00 900.00 25.00 7,500.00 30.00 9,000.00 30.00 9,000.00
302-02-D class ii base course (8 1/2" thick) 689.4    SQYD 18.00 12,409.20 30.00 20,682.00 24.00 16,545.60 22.00 15,166.80
601-01-I portland cement concrete pavement (9" thick) 620.9    SQYD 72.00 44,704.80 120.00 74,508.00 130.00 80,717.00 130.00 80,717.00
707-01 concrete curb 1,124.0    LNFT 7.00 7,868.00 20.00 22,480.00 30.00 33,720.00 50.00 56,200.00
713-01 temporary signs & barricades lump      LUMP 10,000.00 10,000.00 15,000.00 15,000.00 20,000.00 20,000.00 7,500.00 7,500.00
716-01-B mulch (fiber) 1.5    TON 1,000.00 1,500.00 2,000.00 3,000.00 2,000.00 3,000.00 2,500.00 3,750.00
717-01 seeding 3      LB 50.00 150.00 100.00 300.00 100.00 300.00 7.00 21.00
718-01 fertilizer 51      LB 3.00 153.00 10.00 510.00 3.00 153.00 1.00 51.00
718-02 agricultural lime 0.1    TON 1,000.00 100.00 2,000.00 200.00 2,000.00 200.00 70.00 7.00
727-01 mobilization lump      LUMP 11,000.00 11,000.00 15,000.00 15,000.00 25,000.00 25,000.00 37,000.00 37,000.00
732-01-A plastic pavement striping (4" width) 1,141      LNFT 0.50 570.50 1.00 1,141.00 1.00 1,141.00 2.00 2,282.00
732-01-E plastic pavement striping (24" width) 18      LNFT 5.00 90.00 10.00 180.00 10.00 180.00 50.00 900.00
732-04-A plastic pavement legends & symbols (arrow) 3      EACH 180.00 540.00 300.00 900.00 200.00 600.00 300.00 900.00
732-04-C plastic pavement legends & symbols (only) 3      EACH 200.00 600.00 300.00 900.00 300.00 900.00 400.00 1,200.00
732-05 removal of existing markings 0.117  MILE 3,000.00 351.00 20,000.00 2,340.00 10,000.00 1,170.00 10,000.00 1,170.00
737-03-A painted traffic striping (solid line)(4" width) 520      LNFT 0.25 130.00 1.00 520.00 1.00 520.00 2.00 1,040.00
740-01 construction layout lump      LUMP 10,000.00 10,000.00 10,000.00 10,000.00 8,000.00 8,000.00 15,000.00 15,000.00
S-001 saw cutting pcc pavement 617      LNFT 10.00 6,170.00 25.00 15,425.00 15.00 9,255.00 10.00 6,170.00
                       
 CONTRACTOR TOTAL       113,208.50   205,345.00   219,808.60   243,082.80