Letting of 4/30/2008 LA DOTD Headquarters


 
go back
Go Back
DBE GOAL FED
Lead Project: 602-88-0001
Parish: LAFOURCHE
Routes: LA 1, LA 308, LA 3235, LA 3090
Description: LA 1 TOLL CUST SERV CTR,SIGN,ITS,LIGHT,TOLL SYS (PHASE 1D)
Type Const: grading, drainage structures, class ii base course, portland cement concrete pavement,
building construction (general, mech, elec, plumb, sewer, water) traffic sign,& related work
Estimated Construction Cost: $5,905,997.60
 
RankLicenseBidderConstruction Bid
1 01165 ERNEST P. BREAUX ELECTRICAL, INC. $7,548,884.09
2 27043 JACK B. HARPER CONTRACTOR, INC. $7,847,317.93
3 07764 GRADY CRAWFORD CONST. CO., INC. $8,022,142.09
 
Item Number Item Description Quantity Unit of Measure - 1 -
ERNEST P. BREAUX ELECTRICAL, INC.
- 2 -
JACK B. HARPER CONTRACTOR, INC.
- 3 -
GRADY CRAWFORD CONST. CO., INC.

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
202-01 removal of structures & obstructions lump      LUMP 9,750.00 9,750.00 12,662.00 12,662.00 21,900.00 21,900.00    
202-02-E removal of concrete curbs 422.0    LNFT 30.00 12,660.00 8.09 3,413.98 21.90 9,241.80    
202-02-G removal of surfacing & stabilized base 152.0    SQYD 39.00 5,928.00 9.56 1,453.12 116.80 17,753.60    
203-05 excavation and embankment lump      LUMP 42,850.00 42,850.00 500,000.00 500,000.00 65,700.00 65,700.00    
203-08 geotextile fabric 6,336      SQYD 4.90 31,046.40 1.58 10,010.88 2.92 18,501.12    
204-06 temporary silt fencing 1,903      LNFT 8.50 16,175.50 3.15 5,994.45 6.57 12,502.71    
302-02-C class ii base course (8" thick) 5,882.1    SQYD 47.75 280,870.28 22.84 134,347.16 37.08 218,108.27    
302-02-E class ii base course (10" thick) 10.0    SQYD 52.65 526.50 244.40 2,444.00 70.00 700.00    
302-02-F class ii base course (12" thick) 453.7    SQYD 55.10 24,998.87 32.76 14,863.21 75.00 34,027.50    
304-01 lime 167.10   TON 342.50 57,231.75 228.90 38,249.19 255.00 42,610.50    
304-03-B lime treatment (type c) (8 1/2" thick) 16,642      SQYD 4.17 69,397.14 2.73 45,432.66 5.75 95,691.50    
305-01-E subgrade layer (24" thick) 454      SQYD 91.84 41,695.36 26.25 11,917.50 55.48 25,187.92    
502-01 superpave asphaltic concrete 7.2    TON 489.00 3,520.80 288.75 2,079.00 2,800.00 20,160.00    
601-01-G portland cement concrete pavement (8" thick) 5,302.1    SQYD 67.90 360,012.59 72.45 384,137.15 89.06 472,205.03    
601-02-G portland cement concrete pavement (8" thick)
(crossovers & turnouts)
424.8    SQYD 97.96 41,613.41 80.85 34,345.08 128.48 54,578.30    
701-03-F storm drain pipe (15" rcp/pcp) 456      LNFT 42.30 19,288.80 64.31 29,325.36 55.48 25,298.88    
701-03-G storm drain pipe (18" rcp/pcp) 168      LNFT 73.47 12,342.96 72.45 12,171.60 96.36 16,188.48    
702-03-A catch basins (cb-01) 1      EACH 4,341.00 4,341.00 2,493.75 2,493.75 5,994.00 5,994.00    
702-03-C catch basins (cb-06) 3      EACH 3,340.00 10,020.00 3,150.00 9,450.00 4,390.00 13,170.00    
704-01-C guard rail (double thrie beam)(3'-1 1/2" post spacing) 75.0    LNFT 66.80 5,010.00 88.00 6,600.00 80.30 6,022.50    
704-03 blocked out guard rail 300.0    LNFT 23.38 7,014.00 27.50 8,250.00 32.85 9,855.00    
704-11-A guard rail end treatment (flared) 4      EACH 2,672.00 10,688.00 3,850.00 15,400.00 3,650.00 14,600.00    
706-01-A concrete walk (4" thick) 192.2    SQYD 72.36 13,907.59 47.25 9,081.45 94.90 18,239.78    
706-03-A incidental concrete paving (4" thick) 118.0    SQYD 122.45 14,449.10 65.00 7,670.00 160.60 18,950.80    
707-01 concrete curb 1,147.0    LNFT 61.22 70,219.34 7.88 9,038.36 11.68 13,396.96    
713-01 temporary signs & barricades lump      LUMP 45,000.00 45,000.00 55,640.00 55,640.00 75,000.00 75,000.00    
714-01 slab sodding 542      SQYD 5.93 3,214.06 7.70 4,173.40 8.76 4,747.92    
717-01 seeding 13      LB 50.00 650.00 22.00 286.00 511.00 6,643.00    
719-01-A plants (natchez crape myrtle, 1.5" cal. min.) 28      EACH 245.00 6,860.00 396.00 11,088.00 284.70 7,971.60    
719-01-B plants (little gem southern magnolia, 1.5" cal. min.) 63      EACH 245.00 15,435.00 484.00 30,492.00 365.00 22,995.00    
719-01-C plants (mexican heather 'allyson', 3 gal.) 916      EACH 13.36 12,237.76 19.80 18,136.80 21.90 20,060.40    
719-01-D plants (snow white indian hawthorn, 3 gal.) 555      EACH 17.80 9,879.00 19.80 10,989.00 23.36 12,964.80    
719-01-E plants (lily of the nile 'alba', 3 gal.) 1,484      EACH 15.58 23,120.72 17.60 26,118.40 26.28 38,999.52    
719-01-F plants (camellia sasanqua 'leslie ann', 3 gal.) 24      EACH 26.72 641.28 47.30 1,135.20 43.80 1,051.20    
719-01-G plants (aztec grass, 1 gal.) 927      EACH 5.00 4,635.00 6.60 6,118.20 7.30 6,767.10    
719-02-A top dressing mulch (3" depth) 147      SQYD 15.14 2,225.58 5.50 808.50 11.68 1,716.96    
719-03-A bed preparation (12" depth) 1,506      SQYD 11.00 16,566.00 14.30 21,535.80 4.89 7,364.34    
727-01 mobilization lump      LUMP 215,000.00 215,000.00 317,824.00 317,824.00 115,000.00 115,000.00    
729-01 sign (type a) 73.5    SQFT 34.50 2,535.75 33.00 2,425.50 26.28 1,931.58    
729-04 sign (type d) 2,249.0    SQFT 31.15 70,056.35 33.00 74,217.00 36.50 82,088.50    
729-05 sign (type e) 6.0    SQFT 52.00 312.00 33.00 198.00 56.94 341.64    
729-08-A mounting (2 1/2" post) 9      EACH 908.00 8,172.00 1,210.00 10,890.00 978.20 8,803.80    
729-08-G mounting (w8 x 18) 54      EACH 1,489.00 80,406.00 2,172.50 117,315.00 1,931.58 104,305.32    
729-08-H mounting (w8 x 24) 24      EACH 2,075.00 49,800.00 2,860.00 68,640.00 2,039.62 48,950.88    
729-16-C object marker assembly (type 3) 2      EACH 95.00 190.00 99.00 198.00 87.20 174.40    
732-01-A plastic pavement striping (4" width) 1,430      LNFT 1.15 1,644.50 1.00 1,430.00 4.38 6,263.40    
732-01-C plastic pavement striping (8" width) 315      LNFT 2.30 724.50 2.00 630.00 5.84 1,839.60    
732-01-E plastic pavement striping (24" width) 174      LNFT 4.60 800.40 4.00 696.00 21.90 3,810.60    
732-04-A plastic pavement legends & symbols (arrow) 9      EACH 202.00 1,818.00 175.00 1,575.00 730.00 6,570.00    
732-04-C plastic pavement legends & symbols (only) 1      EACH 225.00 225.00 195.00 195.00 730.00 730.00    
732-04-F plastic pavement legends & symbols (cars) 1      EACH 346.00 346.00 300.00 300.00 730.00 730.00    
732-04-G plastic pavement legends & symbols (drive) 1      EACH 403.00 403.00 350.00 350.00 730.00 730.00    
732-04-H plastic pavement legends & symbols (thru) 1      EACH 346.00 346.00 300.00 300.00 730.00 730.00    
732-04-I plastic pavement legends & symbols (trucks) 1      EACH 461.00 461.00 400.00 400.00 730.00 730.00    
732-04-J plastic pavement legends & symbols (wheelchair) 1      EACH 820.00 820.00 650.00 650.00 730.00 730.00    
739-01 hydro-seeding 2.92   ACRE 2,770.00 8,088.40 1,265.00 3,693.80 4,015.00 11,723.80    
740-01 construction layout lump      LUMP 11,450.00 11,450.00 36,868.00 36,868.00 67,500.00 67,500.00    
804-01-C precast concrete piles (16") 360      LNFT 220.00 79,200.00 225.00 81,000.00 182.50 65,700.00    
805-02-D class a(m) concrete (footings) 20.20   CUYD 746.00 15,069.20 1,450.00 29,290.00 3,050.00 61,610.00    
806-01 deformed reinforcing steel 1,862      LB 2.60 4,841.20 2.50 4,655.00 4.38 8,155.56    
S-001 high voltage electrical system-600vac & above lump      LUMP 1,425,000.00 1,425,000.00 1,476,791.32 1,476,791.32 1,533,029.20 1,533,029.20    
S-002 low voltage electrical system-below 600vac lump      LUMP 1,852,000.00 1,852,000.00 1,217,410.11 1,217,410.11 2,138,337.32 2,138,337.32    
S-003-01 cctv camera site #1 - la 1 north connector ramp (bent
#n1-23)
lump      LUMP 47,600.00 47,600.00 37,609.00 37,609.00 41,026.00 41,026.00    
S-003-02 cctv camera site #2 - la 1 northbound (bent #83s) lump      LUMP 47,600.00 47,600.00 38,909.00 38,909.00 41,026.00 41,026.00    
S-003-03 cctv camera site #3 - la 1 northbound (bent #35s) lump      LUMP 47,600.00 47,600.00 37,609.00 37,609.00 41,026.00 41,026.00    
S-004-01 dms site #1 - existing la 1 southbound lump      LUMP 183,650.00 183,650.00 142,974.00 142,974.00 145,416.00 145,416.00    
S-004-02 dms site #2 - la 1 bridge northbound (bent #36s) lump      LUMP 123,260.00 123,260.00 140,868.00 140,868.00 145,416.00 145,416.00    
S-004-03 dms site #3 - existing la 1 northbound lump      LUMP 183,650.00 183,650.00 142,974.00 142,974.00 145,416.00 145,416.00    
S-005-01 unlicensed wireless backbone site #1 @ cctv site #1 lump      LUMP 19,300.00 19,300.00 8,888.10 8,888.10 17,500.00 17,500.00    
S-005-02 unlicensed wireless backbone site #2 @ cctv site #2 lump      LUMP 19,300.00 19,300.00 7,948.20 7,948.20 17,500.00 17,500.00    
S-005-03 unlicensed wireless backbone site #3 @ cctv site #3 lump      LUMP 29,450.00 29,450.00 11,204.70 11,204.70 17,500.00 17,500.00    
S-005-05 unlicensed wireless backbone site #5 @ glpc tower lump      LUMP 18,125.00 18,125.00 9,717.50 9,717.50 17,500.00 17,500.00    
S-006-01 elec. pwr dist. sys. - cctv - #1 thru #3 (2 #8 xhhw &
1 #8 ground)
lump      LUMP 61,375.00 61,375.00 2,834.00 2,834.00 11,680.00 11,680.00    
S-006-02 elec. pwr dist. sys. - dms - #1 thru #3 (3 #8 xhhw &
1 #8 ground)
lump      LUMP 148,950.00 148,950.00 7,988.50 7,988.50 25,550.00 25,550.00    
S-007-01 system integration lump      LUMP 43,150.00 43,150.00 76,011.00 76,011.00 45,000.00 45,000.00    
S-008-01 spare parts, tools and test equipment lump      LUMP 46,850.00 46,850.00 37,206.00 37,206.00 45,000.00 45,000.00    
S-008-02 training lump      LUMP 15,275.00 15,275.00 11,206.00 11,206.00 35,000.00 35,000.00    
S-008-03 documentation lump      LUMP 14,400.00 14,400.00 12,662.00 12,662.00 35,000.00 35,000.00    
S-009-01 extended maintenance lump      LUMP 56,750.00 56,750.00 49,972.00 49,972.00 52,000.00 52,000.00    
S-030 customer service building (general construction) lump      LUMP 649,750.00 649,750.00 1,121,715.00 1,121,715.00 730,000.00 730,000.00    
S-031 customer service building (mechanical, electrical
plumbing and fire protection)
lump      LUMP 240,000.00 240,000.00 394,975.00 394,975.00 240,400.00 240,400.00    
S-032 customer service center site lighting lump      LUMP 93,500.00 93,500.00 204,070.00 204,070.00 29,200.00 29,200.00    
S-033 customer service center site utility (sewer and water
and electrical)
lump      LUMP 2,850.00 2,850.00 27,048.00 27,048.00 36,500.00 36,500.00    
S-034 customer service center exterior building sign lump      LUMP 7,850.00 7,850.00 11,704.00 11,704.00 7,000.00 7,000.00    
S-035 precast concrete wheel stop 14      EACH 212.00 2,968.00 125.00 1,750.00 365.00 5,110.00    
S-040 toll communication equipment building & installation lump      LUMP 41,500.00 41,500.00 69,368.00 69,368.00 125,000.00 125,000.00    
S-041 toll stairway, grate, handrail & gate lump      LUMP 43,650.00 43,650.00 13,689.00 13,689.00 31,150.00 31,150.00    
S-042 toll gantry and installation lump      LUMP 148,500.00 148,500.00 87,802.00 87,802.00 90,520.00 90,520.00    
S-043 toll equipment wiring, cable, conduit & junction boxes lump      LUMP 44,100.00 44,100.00 138,151.00 138,151.00 32,500.00 32,500.00    
S-044 idris loop installation lump      LUMP 15,950.00 15,950.00 16,705.00 16,705.00 27,650.00 27,650.00    
S-045 camera and antenna mounting, installation and testing lump      LUMP 12,000.00 12,000.00 23,361.00 23,361.00 42,194.00 42,194.00    
S-046 am radio installation (pole, ground, conduit & wiring) lump      LUMP 4,250.00 4,250.00 15,106.00 15,106.00 18,980.00 18,980.00    
                       
 CONTRACTOR TOTAL       7,548,884.09   7,847,317.93   8,022,142.09    