Letting of 4/30/2008 LA DOTD Headquarters


 
go back
Go Back
 
Lead Project: 053-01-0028
Parish: RAPIDES
Routes: LA 1
Description: MISSOURI PACIFIC RR - RAPIDES STA. RD.
Type Const: pavement patching, cold planing asphaltic concrete, superpave asphaltic concrete
overlay, and related work.
Estimated Construction Cost: $923,917.24
 
RankLicenseBidderConstruction Bid
1 12312 GILCHRIST CONSTRUCTION CO. LLC $898,283.86
2 12487 DIAMOND B CONSTRUCTION CO., L.L.C. $925,249.78
3 05789 D & J CONSTRUCTION CO., INC. $995,082.32
 
Item Number Item Description Quantity Unit of Measure - 1 -
GILCHRIST CONSTRUCTION CO. LLC
- 2 -
DIAMOND B CONSTRUCTION CO., L.L.C.
- 3 -
D & J CONSTRUCTION CO., INC.

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
502-01 superpave asphaltic concrete 5,490.1    TON 74.00 406,267.40 77.50 425,482.75 88.00 483,128.80    
502-01-A superpave asphaltic concrete, drives, turnouts and
miscellaneous
94.8    TON 200.00 18,960.00 125.00 11,850.00 88.00 8,342.40    
509-01 cold planing asphaltic pavement 45,197      SQYD 1.13 51,072.61 1.50 67,795.50 1.45 65,535.65    
509-02 contractor retained reclaimed asphaltic pavement - 2,473      CUYD 0.01 - 24.73 0.10 - 247.30 0.01 - 24.73    
510-01-C pavement patching (10" minimum thickness) 734      SQYD 110.00 80,740.00 90.00 66,060.00 100.00 73,400.00    
510-01-D pavement patching (18" minimum thickness) 311      SQYD 140.00 43,540.00 125.00 38,875.00 175.00 54,425.00    
713-01 temporary signs & barricades lump      LUMP 10,000.00 10,000.00 8,500.00 8,500.00 17,000.00 17,000.00    
713-03-A temporary pavement markings (broken line)(4" width)(4'
length)
8.726  MILE 350.00 3,054.10 250.00 2,181.50 230.00 2,006.98    
713-03-B temporary pavement markings (broken line)(4" width)
(10' length)
8.709  MILE 1.00 8.71 1.00 8.71 200.00 1,741.80    
713-04-A temporary pavement markings (solid line)(4" width) 22.670  MILE 1.00 22.67 1.00 22.67 1.00 22.67    
727-01 mobilization lump      LUMP 60,000.00 60,000.00 49,000.00 49,000.00 32,000.00 32,000.00    
731-02 reflectorized raised pavement markers 384      EACH 5.20 1,996.80 5.00 1,920.00 8.00 3,072.00    
732-01-E plastic pavement striping (24" width) 12      LNFT 3.30 39.60 3.25 39.00 35.00 420.00    
732-02-A plastic pavement striping (solid line) (4" width) 7.557  MILE 2,800.00 21,159.60 2,600.00 19,648.20 2,800.00 21,159.60    
732-03-A plastic pavement striping (broken line)(4" width) 2.903  MILE 700.00 2,032.10 850.00 2,467.55 1,800.00 5,225.40    
732-04-D plastic pavement legends & symbols (rr crossing) 1      EACH 450.00 450.00 450.00 450.00 800.00 800.00    
735-01 mailboxes 56      EACH 10.00 560.00 1.00 56.00 5.00 280.00    
735-02 mailbox supports (single) 36      EACH 90.00 3,240.00 118.00 4,248.00 125.00 4,500.00    
735-03 mailbox supports (double) 20      EACH 110.00 2,200.00 175.00 3,500.00 200.00 4,000.00    
740-01 construction layout lump      LUMP 9,500.00 9,500.00 7,450.00 7,450.00 8,000.00 8,000.00    
S-001 high strain asphalt mixture-reflective crack relief
interlayer
21,485      SQYD 7.00 150,395.00 9.00 193,365.00 8.75 187,993.75    
S-002 sawcuts in asphaltic concrete lifts 9,500      LNFT 1.40 13,300.00 0.80 7,600.00 0.75 7,125.00    
S-003 sawing and sealing transverse joints in asphaltic
concrete overlay
4,752      LNFT 3.75 17,820.00 1.10 5,227.20 1.50 7,128.00    
S-004 saw cutting 1,300      INFT 1.50 1,950.00 7.50 9,750.00 6.00 7,800.00    
                       
 CONTRACTOR TOTAL       898,283.86   925,249.78   995,082.32    