| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - GILCHRIST CONSTRUCTION CO. LLC |
- 2 - DIAMOND B CONSTRUCTION CO., L.L.C. |
- 3 - D & J CONSTRUCTION CO., INC. |
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 502-01 |
superpave asphaltic concrete
|
5,490.1 |
TON |
74.00 |
406,267.40 |
77.50 |
425,482.75 |
88.00 |
483,128.80 |
|
|
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
94.8 |
TON |
200.00 |
18,960.00 |
125.00 |
11,850.00 |
88.00 |
8,342.40 |
|
|
| 509-01 |
cold planing asphaltic pavement
|
45,197   |
SQYD |
1.13 |
51,072.61 |
1.50 |
67,795.50 |
1.45 |
65,535.65 |
|
|
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 2,473   |
CUYD |
0.01 |
- 24.73 |
0.10 |
- 247.30 |
0.01 |
- 24.73 |
|
|
| 510-01-C |
pavement patching (10" minimum thickness)
|
734   |
SQYD |
110.00 |
80,740.00 |
90.00 |
66,060.00 |
100.00 |
73,400.00 |
|
|
| 510-01-D |
pavement patching (18" minimum thickness)
|
311   |
SQYD |
140.00 |
43,540.00 |
125.00 |
38,875.00 |
175.00 |
54,425.00 |
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
10,000.00 |
10,000.00 |
8,500.00 |
8,500.00 |
17,000.00 |
17,000.00 |
|
|
| 713-03-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
8.726 |
MILE |
350.00 |
3,054.10 |
250.00 |
2,181.50 |
230.00 |
2,006.98 |
|
|
| 713-03-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
8.709 |
MILE |
1.00 |
8.71 |
1.00 |
8.71 |
200.00 |
1,741.80 |
|
|
| 713-04-A |
temporary pavement markings (solid line)(4" width)
|
22.670 |
MILE |
1.00 |
22.67 |
1.00 |
22.67 |
1.00 |
22.67 |
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
60,000.00 |
60,000.00 |
49,000.00 |
49,000.00 |
32,000.00 |
32,000.00 |
|
|
| 731-02 |
reflectorized raised pavement markers
|
384   |
EACH |
5.20 |
1,996.80 |
5.00 |
1,920.00 |
8.00 |
3,072.00 |
|
|
| 732-01-E |
plastic pavement striping (24" width)
|
12   |
LNFT |
3.30 |
39.60 |
3.25 |
39.00 |
35.00 |
420.00 |
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
7.557 |
MILE |
2,800.00 |
21,159.60 |
2,600.00 |
19,648.20 |
2,800.00 |
21,159.60 |
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
2.903 |
MILE |
700.00 |
2,032.10 |
850.00 |
2,467.55 |
1,800.00 |
5,225.40 |
|
|
| 732-04-D |
plastic pavement legends & symbols (rr crossing)
|
1   |
EACH |
450.00 |
450.00 |
450.00 |
450.00 |
800.00 |
800.00 |
|
|
| 735-01 |
mailboxes
|
56   |
EACH |
10.00 |
560.00 |
1.00 |
56.00 |
5.00 |
280.00 |
|
|
| 735-02 |
mailbox supports (single)
|
36   |
EACH |
90.00 |
3,240.00 |
118.00 |
4,248.00 |
125.00 |
4,500.00 |
|
|
| 735-03 |
mailbox supports (double)
|
20   |
EACH |
110.00 |
2,200.00 |
175.00 |
3,500.00 |
200.00 |
4,000.00 |
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
9,500.00 |
9,500.00 |
7,450.00 |
7,450.00 |
8,000.00 |
8,000.00 |
|
|
| S-001 |
high strain asphalt mixture-reflective crack relief
interlayer |
21,485   |
SQYD |
7.00 |
150,395.00 |
9.00 |
193,365.00 |
8.75 |
187,993.75 |
|
|
| S-002 |
sawcuts in asphaltic concrete lifts
|
9,500   |
LNFT |
1.40 |
13,300.00 |
0.80 |
7,600.00 |
0.75 |
7,125.00 |
|
|
| S-003 |
sawing and sealing transverse joints in asphaltic
concrete overlay |
4,752   |
LNFT |
3.75 |
17,820.00 |
1.10 |
5,227.20 |
1.50 |
7,128.00 |
|
|
| S-004 |
saw cutting
|
1,300   |
INFT |
1.50 |
1,950.00 |
7.50 |
9,750.00 |
6.00 |
7,800.00 |
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
898,283.86 |
|
925,249.78 |
|
995,082.32 |
|
|
|